Gateway Distriparks Expands Rail Network, Plans Two More Container Trains by March
RAILWAYS & METRO RAIL

Gateway Distriparks Expands Rail Network, Plans Two More Container Trains by March

Gateway Distriparks, a leading player in the logistics industry, has recently introduced a new container train, reinforcing its commitment to efficient freight transportation. The company's strategic move aligns with the growing demand for streamlined logistics solutions in the region. This expansion comes at a crucial juncture when the logistics sector is witnessing a surge in demand for sustainable and cost-effective transport alternatives. Gateway Distriparks aims to capitalise on this trend by enhancing its rail network and providing a reliable and eco-friendly mode of transporting goods. The newly inducted container train is equipped with state-of-the-art facilities, ensuring the safe and timely delivery of cargo. Gateway Distriparks plans to further strengthen its rail capabilities by introducing two more container trains by March. This ambitious undertaking is poised to meet the escalating demands of businesses seeking efficient and environmentally conscious logistics solutions.

Gateway Distriparks, a leading player in the logistics industry, has recently introduced a new container train, reinforcing its commitment to efficient freight transportation. The company's strategic move aligns with the growing demand for streamlined logistics solutions in the region. This expansion comes at a crucial juncture when the logistics sector is witnessing a surge in demand for sustainable and cost-effective transport alternatives. Gateway Distriparks aims to capitalise on this trend by enhancing its rail network and providing a reliable and eco-friendly mode of transporting goods. The newly inducted container train is equipped with state-of-the-art facilities, ensuring the safe and timely delivery of cargo. Gateway Distriparks plans to further strengthen its rail capabilities by introducing two more container trains by March. This ambitious undertaking is poised to meet the escalating demands of businesses seeking efficient and environmentally conscious logistics solutions.

Next Story
Infrastructure Energy

Adani Green Adds 113 MW At Khavda, Capacity Hits 16.6 GW

Adani Green Energy Limited (AGEL) announced that it has operationalised 112.5 megawatts (MW) of renewable power projects at Khavda in Gujarat, raising its total generation capacity to 16,598.6 MW.The company said in an exchange filing that its step-down subsidiary, Adani Renewable Energy Fifty Six Limited, has commissioned a solar project of 87.5 MW, while Adani Green Energy Twenty Five B Limited has operationalised a 25 MW hybrid project at the same site.Following the required regulatory clearances, the company began power generation on 30 September 2025.With these additions, AGEL’s total o..

Next Story
Infrastructure Energy

Centre Sets National Standards For Renewable Power Use

The Central Government, in consultation with the Bureau of Energy Efficiency (BEE), has issued a new notification establishing minimum renewable energy consumption standards for designated power users across India. This framework replaces the 2023 notification and aims to accelerate the adoption of green electricity among consumers nationwide.Titled the Renewable Consumption Obligation (RCO), the regulation mandates that designated consumers — including electricity distribution licensees, open access consumers, and captive power users — must ensure a specified share of their total electric..

Next Story
Infrastructure Energy

Tata Power Signs Rs 12 Billion PPA For 80 MW Green Project

Tata Power Company announced that its renewable arm, Tata Power Renewable Energy Limited (TPREL), has signed a Power Purchase Agreement (PPA) with Tata Power Mumbai Distribution for an 80 MW Firm and Dispatchable Renewable Energy (FDRE) project.The Rs 12 billion project will combine solar, wind, and battery storage systems to provide reliable renewable power during peak demand periods, strengthening grid stability and meeting the growing energy needs of Mumbai.Scheduled for completion within 24 months, the facility is expected to generate around 315 million units (MUs) of clean electricity ann..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?