Pandu port development is given new life after 25 years of stagnation
PORTS & SHIPPING

Pandu port development is given new life after 25 years of stagnation

Prime Minister Narendra Modi announced a number of initiatives pertaining to the nation's inland waterways, the most well-known of which was the debut of the world's longest river cruise from Varanasi to Dibrugarh transporting foreign tourists. The laying of the foundation for a ship repair facility at Pandu internal waterway port in Guwahati, which had lain dormant for several decades, has greater significance than the river cruise, which is symbolic in character as the country holds the G20 presidency for 2023.

The Kolkata facility will be supplemented by the new ship repair facility. Currently, boats and barges using the rivers in northeast India must use the ship repair facility in Kolkata, which means a longer trip and higher costs.

It was first proposed many years ago to build a ship repair plant in Guwahati. It started in 1997 after the Ministry of Shipping & Port approved the estimate under the government supported scheme that the IWT (Inland Waterway Transport) Directorate, Government of Assam, had submitted.

In recent years, the government has pushed for the development of inland waterways, particularly National Waterway 1 (Ganga) and National Waterway 2, with an emphasis on the development of multimodal transport in the nation (Brahmaputra). National Waterway 2 has the greatest potential of the two since it links the riverine networks between Bangladesh, West Bengal, and the northeastern region.

Also read:
Major Ports Adjudicatory Board Rules are notified by the Center
Centre approves improving coal handling at two berths at the MPA


"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Prime Minister Narendra Modi announced a number of initiatives pertaining to the nation's inland waterways, the most well-known of which was the debut of the world's longest river cruise from Varanasi to Dibrugarh transporting foreign tourists. The laying of the foundation for a ship repair facility at Pandu internal waterway port in Guwahati, which had lain dormant for several decades, has greater significance than the river cruise, which is symbolic in character as the country holds the G20 presidency for 2023. The Kolkata facility will be supplemented by the new ship repair facility. Currently, boats and barges using the rivers in northeast India must use the ship repair facility in Kolkata, which means a longer trip and higher costs. It was first proposed many years ago to build a ship repair plant in Guwahati. It started in 1997 after the Ministry of Shipping & Port approved the estimate under the government supported scheme that the IWT (Inland Waterway Transport) Directorate, Government of Assam, had submitted. In recent years, the government has pushed for the development of inland waterways, particularly National Waterway 1 (Ganga) and National Waterway 2, with an emphasis on the development of multimodal transport in the nation (Brahmaputra). National Waterway 2 has the greatest potential of the two since it links the riverine networks between Bangladesh, West Bengal, and the northeastern region. Also read: Major Ports Adjudicatory Board Rules are notified by the CenterCentre approves improving coal handling at two berths at the MPA

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement