Pandu port development is given new life after 25 years of stagnation
PORTS & SHIPPING

Pandu port development is given new life after 25 years of stagnation

Prime Minister Narendra Modi announced a number of initiatives pertaining to the nation's inland waterways, the most well-known of which was the debut of the world's longest river cruise from Varanasi to Dibrugarh transporting foreign tourists. The laying of the foundation for a ship repair facility at Pandu internal waterway port in Guwahati, which had lain dormant for several decades, has greater significance than the river cruise, which is symbolic in character as the country holds the G20 presidency for 2023.

The Kolkata facility will be supplemented by the new ship repair facility. Currently, boats and barges using the rivers in northeast India must use the ship repair facility in Kolkata, which means a longer trip and higher costs.

It was first proposed many years ago to build a ship repair plant in Guwahati. It started in 1997 after the Ministry of Shipping & Port approved the estimate under the government supported scheme that the IWT (Inland Waterway Transport) Directorate, Government of Assam, had submitted.

In recent years, the government has pushed for the development of inland waterways, particularly National Waterway 1 (Ganga) and National Waterway 2, with an emphasis on the development of multimodal transport in the nation (Brahmaputra). National Waterway 2 has the greatest potential of the two since it links the riverine networks between Bangladesh, West Bengal, and the northeastern region.

Also read:
Major Ports Adjudicatory Board Rules are notified by the Center
Centre approves improving coal handling at two berths at the MPA


Prime Minister Narendra Modi announced a number of initiatives pertaining to the nation's inland waterways, the most well-known of which was the debut of the world's longest river cruise from Varanasi to Dibrugarh transporting foreign tourists. The laying of the foundation for a ship repair facility at Pandu internal waterway port in Guwahati, which had lain dormant for several decades, has greater significance than the river cruise, which is symbolic in character as the country holds the G20 presidency for 2023. The Kolkata facility will be supplemented by the new ship repair facility. Currently, boats and barges using the rivers in northeast India must use the ship repair facility in Kolkata, which means a longer trip and higher costs. It was first proposed many years ago to build a ship repair plant in Guwahati. It started in 1997 after the Ministry of Shipping & Port approved the estimate under the government supported scheme that the IWT (Inland Waterway Transport) Directorate, Government of Assam, had submitted. In recent years, the government has pushed for the development of inland waterways, particularly National Waterway 1 (Ganga) and National Waterway 2, with an emphasis on the development of multimodal transport in the nation (Brahmaputra). National Waterway 2 has the greatest potential of the two since it links the riverine networks between Bangladesh, West Bengal, and the northeastern region. Also read: Major Ports Adjudicatory Board Rules are notified by the CenterCentre approves improving coal handling at two berths at the MPA

Next Story
Infrastructure Transport

Cabinet Approves Key Highway and Rail Projects in Bihar Region

The Union Cabinet on Wednesday approved the four-laning of the 84.2-km Mokama-Munger section of the Buxar-Bhagalpur high-speed corridor, a key industrial region in poll-bound Bihar. The Cabinet also sanctioned the doubling of the 177-km Bhagalpur-Dumka-Rampurhat railway line, which passes through Bihar, Jharkhand, and West Bengal, at a cost of Rs 31.7 billion.The Rs 44.5 billion highway project will be constructed under the hybrid annuity model, a variant of public-private partnership. The Mokama-Munger stretch was the only remaining two-lane section of the 363-km Buxar-Bhagalpur corridor. Fou..

Next Story
Infrastructure Transport

NGT Issues Notice on Bengaluru Twin Tunnel Project

The National Green Tribunal (NGT) on Wednesday issued notices in response to a petition filed by Bengaluru Praja Vedike and others, challenging the Bengaluru twin tunnel road project. Petitioners claim the project was “hastily announced” and bypassed mandatory environmental impact assessment procedures.Notices have been served to the Karnataka Government, Greater Bengaluru Authority, State Environment Impact Assessment Authority (SEIAA), Bengaluru Smart Infrastructure Ltd (B-SMILE), the Union Ministry of Environment, Forest and Climate Change, and project consultants.The 16.74-km twin-tube..

Next Story
Real Estate

India’s Residential Sales to Dip Slightly in FY26

Residential sales in India’s seven major cities are projected to decline by up to 3 per cent year-on-year in FY26 to 620–640 million square feet (msf), amid a moderation in sales velocity, according to ratings agency Icra.In FY25, sales stood at 643 msf, down 8 per cent YoY, following a sharp contraction in new launches and moderated demand in the affordable and mid-income segments. This slowdown came after the sector posted a robust compound annual growth rate of 26 per cent in area sales between FY22 and FY24.Icra noted: “Having seen a strong upcycle, the sector entered an equilibrium ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?