+
Adani Krishnapatnam Port records highest coal loading
COAL & MINING

Adani Krishnapatnam Port records highest coal loading

As of March 18, Adani Krishnapatnam Port Private Siding Ltd of the South-Central Railway's Vijayawada Division loaded 12.95 MT of coal by rail, setting a record. This surpasses the previous milestone of 12.94 MT during the year 2014–15's same time to become the highest-ever coal volume transacted in a financial year since its start.

The port loaded 17.40 million tonnes of goods during the current year, with coal accounting for the majority of overall loading and income at 75%.

Since it began operating in November 2009, Adani Krishnapatnam Port has been the main source of revenue and freight loading for the Vijayawada Division. The two main commodities handled with at this port are coal and fertilisers. The port's freight revenue also increased to a record high of 19,402.3 million, or 110 percent more than the 9,236.1 million in revenue from the prior year (2021–2022).

All commodities experienced greater loading levels during the current fiscal year compared to the same period in the previous fiscal year, reflecting the growth rebound in freight loading across the freight segment.

As of March 18, Adani Krishnapatnam Port Private Siding Ltd of the South-Central Railway's Vijayawada Division loaded 12.95 MT of coal by rail, setting a record. This surpasses the previous milestone of 12.94 MT during the year 2014–15's same time to become the highest-ever coal volume transacted in a financial year since its start. The port loaded 17.40 million tonnes of goods during the current year, with coal accounting for the majority of overall loading and income at 75%. Since it began operating in November 2009, Adani Krishnapatnam Port has been the main source of revenue and freight loading for the Vijayawada Division. The two main commodities handled with at this port are coal and fertilisers. The port's freight revenue also increased to a record high of 19,402.3 million, or 110 percent more than the 9,236.1 million in revenue from the prior year (2021–2022). All commodities experienced greater loading levels during the current fiscal year compared to the same period in the previous fiscal year, reflecting the growth rebound in freight loading across the freight segment.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App