Coal Supply and Logistics to Meet Electricity Demand
COAL & MINING

Coal Supply and Logistics to Meet Electricity Demand

India has sufficient coal availability, with the government focusing on increasing domestic production to meet energy demands. The country achieved its highest-ever coal production in 2023-24, reaching 997.826 million tonnes (MT), an 11.71% increase from 893.191 MT in 2022-23. In 2024-25, coal production stood at 929.15 MT (provisional) as of February, marking a 5.45% rise from 881.16 MT in the same period of 2023-24. For the financial year 2025-26, the Ministry of Power has projected a domestic coal requirement of 906.1 MT, which the Ministry of Coal has committed to supplying. According to the Central Electricity Authority (CEA), coal stocks at domestic coal-based power plants reached 53.49 MT as of March 10, 2025, reflecting a 20.20% increase from 44.51 MT a year earlier. This stock is sufficient for about 20 days at an 85% plant load factor. Coal supply to power plants is continuously monitored by coal companies and an Inter-Ministerial Sub-Group comprising representatives from the Ministries of Power, Coal, and Railways, along with CEA, Coal India Limited (CIL), and Singareni Collieries Company Limited (SCCL), which regularly reviews and enhances supply operations. Additionally, an Inter-Ministerial Committee (IMC) including the Railway Board Chairman and Secretaries from the Ministries of Coal, Power, and Environment monitors coal supply augmentation and power generation capacity, with the Secretary of the Ministry of New and Renewable Energy and the CEA Chairperson attending as special invitees when required. This information was provided by Union Minister of Coal and Mines Shri G. Kishan Reddy in a written reply to the Rajya Sabha. (PIB)

India has sufficient coal availability, with the government focusing on increasing domestic production to meet energy demands. The country achieved its highest-ever coal production in 2023-24, reaching 997.826 million tonnes (MT), an 11.71% increase from 893.191 MT in 2022-23. In 2024-25, coal production stood at 929.15 MT (provisional) as of February, marking a 5.45% rise from 881.16 MT in the same period of 2023-24. For the financial year 2025-26, the Ministry of Power has projected a domestic coal requirement of 906.1 MT, which the Ministry of Coal has committed to supplying. According to the Central Electricity Authority (CEA), coal stocks at domestic coal-based power plants reached 53.49 MT as of March 10, 2025, reflecting a 20.20% increase from 44.51 MT a year earlier. This stock is sufficient for about 20 days at an 85% plant load factor. Coal supply to power plants is continuously monitored by coal companies and an Inter-Ministerial Sub-Group comprising representatives from the Ministries of Power, Coal, and Railways, along with CEA, Coal India Limited (CIL), and Singareni Collieries Company Limited (SCCL), which regularly reviews and enhances supply operations. Additionally, an Inter-Ministerial Committee (IMC) including the Railway Board Chairman and Secretaries from the Ministries of Coal, Power, and Environment monitors coal supply augmentation and power generation capacity, with the Secretary of the Ministry of New and Renewable Energy and the CEA Chairperson attending as special invitees when required. This information was provided by Union Minister of Coal and Mines Shri G. Kishan Reddy in a written reply to the Rajya Sabha. (PIB)

Next Story
Real Estate

RBI Rate Cut Boosts Confidence Across Housing Market

Industry Context and Market DynamicsThe real estate industry has welcomed the RBI’s rate cut as a timely boost to affordability and demand. With home prices having risen steadily across major markets, even a marginal reduction in interest rates meaningfully strengthens purchasing power, especially for first-time and mid-income buyers.Ashish Jerath, President – Sales & Marketing, Smartworld Developers, observes:“The RBI’s 25-basis-point cut, bringing the repo rate down to 5.25%, is a timely boost for the real estate sector. Lower interest rates reduce borrowing costs, enabling homeb..

Next Story
Infrastructure Transport

BMC Resumes Rs 170 Billion Road Works, Targets 80 per cent By Jan 2026

Following the withdrawal of the southwest monsoon in October, the Brihanmumbai Municipal Corporation (BMC) has restarted work on 645 roads—covering 297.49 kilometres—under its large-scale concretisation programme. Data shows that more than 60 per cent of the resumed works are located in the western suburbs. Officials said the civic body aims to complete concretisation on 80 per cent of the roads where fresh work has begun by January 2026. Launched in 2022, the Rs 170 billion project seeks to concretise 700 kilometres of roads across Mumbai. All civil works were halted during the monsoon ..

Next Story
Infrastructure Urban

India Pushes Digital Shift In Urban Land Mapping

The Department of Land Resources (DoLR) under the Ministry of Rural Development has convened a National Symposium on NAKSHA – the National Geospatial Knowledge-based Land Survey of Urban Habitations – to advance India’s transition to modern, technology-driven land mapping. Speaking at the inaugural session, Secretary Manoj Joshi underscored the urgent need to move revenue departments away from outdated, tape-based methods and rough hand-drawn sketches. He stressed that adopting latitude–longitude-based digital mapping and GIS-linked registration systems is essential for economic stabi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App