+
Komatsu HD785 Dumper supplied by L&T crosses 60,000 hrs
COAL & MINING

Komatsu HD785 Dumper supplied by L&T crosses 60,000 hrs

At Tata Steel’s Noamundi Iron Ore Mines, Larsen & Toubro (L&T) had delivered and commissioned the first batch of Komatsu HD785 Dump Trucks way back in 2008. One of these Dumpers (Serial no N10029) crossed 60,000 hours in July 2020 at Noamundi Iron Ore Mines, creating history in Komatsu’s journey in India. This is the first mining truck in the iron ore mining industry in India to achieve this feat. During 60,000 hours of operation, the HD785 Dumper completed 129,637 trips and hauled 12.48 million ton material with 94 per cent equipment availability.

Komatsu products are known for their superior quality and deliver high performance. The L&T team deployed on-site at Noamundi provided round-the-clock service and was a critical success factor in achieving this milestone. L&T was engaged as the service partner to provide maintenance for Komatsu fleet under FMC contract besides extending equipment training for the operators. 

Today, Tata Steel operates a total fleet of 64 Komatsu machines in its Ore Mines & Quarries Division in Noamundi (Jharkhand), Joda (Odisha) and Khondbond (Odisha). This fleet includes HD785 Dump Trucks, WA900 Wheel Loaders, GD825A Motor Graders, D275 Crawler Dozers, WD600 Wheel Dozer and Water Sprinklers.  L&T has also supplied Komatsu machines to TSL’s captive Coal Mines in West Bokaro.

At Tata Steel’s Noamundi Iron Ore Mines, Larsen & Toubro (L&T) had delivered and commissioned the first batch of Komatsu HD785 Dump Trucks way back in 2008. One of these Dumpers (Serial no N10029) crossed 60,000 hours in July 2020 at Noamundi Iron Ore Mines, creating history in Komatsu’s journey in India. This is the first mining truck in the iron ore mining industry in India to achieve this feat. During 60,000 hours of operation, the HD785 Dumper completed 129,637 trips and hauled 12.48 million ton material with 94 per cent equipment availability.Komatsu products are known for their superior quality and deliver high performance. The L&T team deployed on-site at Noamundi provided round-the-clock service and was a critical success factor in achieving this milestone. L&T was engaged as the service partner to provide maintenance for Komatsu fleet under FMC contract besides extending equipment training for the operators. Today, Tata Steel operates a total fleet of 64 Komatsu machines in its Ore Mines & Quarries Division in Noamundi (Jharkhand), Joda (Odisha) and Khondbond (Odisha). This fleet includes HD785 Dump Trucks, WA900 Wheel Loaders, GD825A Motor Graders, D275 Crawler Dozers, WD600 Wheel Dozer and Water Sprinklers.  L&T has also supplied Komatsu machines to TSL’s captive Coal Mines in West Bokaro.

Related Stories

Gold Stories

Next Story
Real Estate

Kamdhenu Realities acquires 4-acre Navi Mumbai land parcel

Kamdhenu Realities has acquired a 4-acre land parcel from RPG Life Sciences on Thane-Belapur Road for approximately Rs 1.5 billion, expanding its commercial real estate portfolio in Navi Mumbai.The parcel has a total developable potential of 1.8 million sq ft, on which Kamdhenu plans to develop a destination-scale commercial and lifestyle ecosystem. The proposed development will combine corporate office suites with high-street retail, F&B outlets, double-height lobbies, business infrastructure and lifestyle amenities.Located close to IKEA and opposite the upcoming Pawane Railway Station, t..

Next Story
Infrastructure Transport

97 Per Cent Of Rongjeng-Mangsang-Adokgre Road Nears Completion

Deputy Chief Minister in-charge of public works Prestone Tynsong said in Shillong on 26 August that 97 per cent physical progress had been achieved on the ongoing Rongjeng-Mangsang-Adokgre road being constructed under the Non-Lapsable Central Pool of Resources (NLCPR). He noted the project was sanctioned in 2017 and that the stipulated time for completion had been 24 months from issue of the final work order. The deputy chief minister informed the assembly that the government had decided to include the remaining work under a World Bank project. In reply to a query from Rongjeng MLA Jim M Sangm..

Next Story
Infrastructure Transport

First TBM Starts Digging Five Point Three Kilometre Tunnel Under SGNP

The Goregaon-Mulund Link Road (GMLR) Phase three (B) project has reached a key milestone as the first tunnel boring machine (TBM) began excavation of the first of two tunnels beneath the Sanjay Gandhi National Park (SGNP). The machine, named Tulsi, started cutting a five point three kilometre bore that will link Dadasaheb Phalke Chitranagari in Goregaon East with Amar Nagar in Mulund West. Officials issued a statement noting the commencement of tunnelling work under the protected green belt. The twin tunnels are being constructed using mechanised tunnelling methods that aim to limit surface di..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code