Maharashtra to Auction 40 Mine Blocks by March 19
COAL & MINING

Maharashtra to Auction 40 Mine Blocks by March 19

Maharashtra is set to auction 40 mine blocks, primarily in Vidarbha, by March 19. The auction process, previously delayed due to the state election code of conduct, is now being expedited.
 
During a review meeting at the divisional commissioner's office in Nagpur, Chief Secretary Sujata Saunik, along with Additional Chief Secretary (ACS) for Mining Iqbal Singh Chahal, emphasised the need to accelerate the process. Divisional Commissioner Vijayalakshmi Bidri confirmed that instructions were issued to fast-track stalled procedures, particularly those requiring government clearance for three iron ore mining blocks in Gadchiroli. 

The performance of the Maharashtra State Mining Corporation (MSMC) was also reviewed, with discussions on enhancing its development in alignment with similar corporations in other states. Saunik stressed adhering to strict timelines to unlock the full potential of the mining sector, which is concentrated in Vidarbha, particularly in the Nagpur division. 

The meeting also addressed integrating mining with district-specific development plans. Districts were directed to identify unique strengths in agriculture, tourism, industry, and natural resources to craft targeted strategies. Nagpur’s proposed one-year development plan, presented by Collector Vipin Itankar, includes initiatives in agriculture, fisheries, skill development, industrial growth, solar energy projects, and establishing medical hubs. 

Saunik highlighted the need to leverage Nagpur’s strong infrastructure, including the international airport and MIHAN, to attract industries. She also suggested partnerships with educational institutions to develop skilled manpower for emerging industries. Additionally, Nagpur’s rise as a tourism and medical hub was emphasised, with calls to enhance cleanliness, beautification, and visitor facilities at tourist spots, monuments, and metro stations. 

(ET)   

Maharashtra is set to auction 40 mine blocks, primarily in Vidarbha, by March 19. The auction process, previously delayed due to the state election code of conduct, is now being expedited. During a review meeting at the divisional commissioner's office in Nagpur, Chief Secretary Sujata Saunik, along with Additional Chief Secretary (ACS) for Mining Iqbal Singh Chahal, emphasised the need to accelerate the process. Divisional Commissioner Vijayalakshmi Bidri confirmed that instructions were issued to fast-track stalled procedures, particularly those requiring government clearance for three iron ore mining blocks in Gadchiroli. The performance of the Maharashtra State Mining Corporation (MSMC) was also reviewed, with discussions on enhancing its development in alignment with similar corporations in other states. Saunik stressed adhering to strict timelines to unlock the full potential of the mining sector, which is concentrated in Vidarbha, particularly in the Nagpur division. The meeting also addressed integrating mining with district-specific development plans. Districts were directed to identify unique strengths in agriculture, tourism, industry, and natural resources to craft targeted strategies. Nagpur’s proposed one-year development plan, presented by Collector Vipin Itankar, includes initiatives in agriculture, fisheries, skill development, industrial growth, solar energy projects, and establishing medical hubs. Saunik highlighted the need to leverage Nagpur’s strong infrastructure, including the international airport and MIHAN, to attract industries. She also suggested partnerships with educational institutions to develop skilled manpower for emerging industries. Additionally, Nagpur’s rise as a tourism and medical hub was emphasised, with calls to enhance cleanliness, beautification, and visitor facilities at tourist spots, monuments, and metro stations. (ET)   

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?