Railways aim to use multiple waggon tipplers to unload coal
COAL & MINING

Railways aim to use multiple waggon tipplers to unload coal

The Indian railways intends to introduce multiple waggon tipplers in order to speed up the country's coal distribution network. Along with additional waggon tipplers, the railways intends to build additional waggon unloading lines to unload coal waggons at power plants.

With the help of clamping devices, coal waggon tipplers empty loaded waggons from the top and sides. The Indian railways currently use one waggon tippler to empty coal.

“The technology of multiple wagon tipplers at once is widely used in Japan and we are working to bring it to India. Three coal wagons can be tippled at one point. This will drastically improve the supply chain of coal across the country,” said a senior Indian Railways official.

With the increased use of waggon tipplers, railways anticipate faster coal movement and shorter transportation times.

In addition, the Indian railways will receive 50,000 waggons by 2023. One rake has 59 waggons and can transport 4,000 tonnes of coal at one time; railways intend to increase the number of rakes transporting coal by increasing the number of waggons.

The country's 17 zonal railways have identified routes and terminals dedicated to the movement of coal. In Maharashtra, the Central Railway has identified three routes to improve connectivity between Nagpur's powerhouses. Long-distance running loops for coal transportation across Indian railways are being sought.

Railways will also develop smart examination points at terminals to address the shortage of waggons for coal transportation. The examination points will detect problems in the waggon in real time, allowing them to be addressed immediately.

“The smart points will be used to detect flaws in the wagon in a mechanised way. This will be possible to detect the flaws without having to detach the wagons from the rake. Fixing the flaws will also be quicker,” added the railway official.

See also:
India’s coal demand grew at highest pace globally in 2022
Coal Ministry reviews non-operational coal blocks of Jharkhand


The Indian railways intends to introduce multiple waggon tipplers in order to speed up the country's coal distribution network. Along with additional waggon tipplers, the railways intends to build additional waggon unloading lines to unload coal waggons at power plants. With the help of clamping devices, coal waggon tipplers empty loaded waggons from the top and sides. The Indian railways currently use one waggon tippler to empty coal. “The technology of multiple wagon tipplers at once is widely used in Japan and we are working to bring it to India. Three coal wagons can be tippled at one point. This will drastically improve the supply chain of coal across the country,” said a senior Indian Railways official. With the increased use of waggon tipplers, railways anticipate faster coal movement and shorter transportation times. In addition, the Indian railways will receive 50,000 waggons by 2023. One rake has 59 waggons and can transport 4,000 tonnes of coal at one time; railways intend to increase the number of rakes transporting coal by increasing the number of waggons. The country's 17 zonal railways have identified routes and terminals dedicated to the movement of coal. In Maharashtra, the Central Railway has identified three routes to improve connectivity between Nagpur's powerhouses. Long-distance running loops for coal transportation across Indian railways are being sought. Railways will also develop smart examination points at terminals to address the shortage of waggons for coal transportation. The examination points will detect problems in the waggon in real time, allowing them to be addressed immediately. “The smart points will be used to detect flaws in the wagon in a mechanised way. This will be possible to detect the flaws without having to detach the wagons from the rake. Fixing the flaws will also be quicker,” added the railway official. See also: India’s coal demand grew at highest pace globally in 2022Coal Ministry reviews non-operational coal blocks of Jharkhand

Next Story
Real Estate

Casagrand Launches 41-Acre Highcity Project in Chennai

Casagrand has launched Casagrand Highcity, a 41-acre integrated residential development on Chennai’s Outer Ring Road (ORR), marking the company’s largest residential project to date.The project will comprise over 4,000 two and three BHK apartments across four G+22 towers and is positioned as one of the largest organised residential developments in the ORR corridor.Located along Chennai’s emerging residential and infrastructure growth belt, the project benefits from connectivity to IT hubs including Navalur, Siruseri SIPCOT and Porur, as well as industrial clusters such as Sriperumbudur, ..

Next Story
Real Estate

Brigade, Marriott Open Courtyard Kochi Infopark

Brigade Hotel Ventures (BHVL) and Marriott International have opened Courtyard by Marriott Kochi Infopark, a rebranded and upgraded hotel formerly operating as Four Points by Sheraton Kochi Infopark.Located in Kakkanad adjoining Infopark Kochi, the 218-room property strengthens Brigade’s hospitality portfolio in one of the city’s key IT and commercial corridors. The hotel is positioned to cater to corporate, MICE and leisure travellers visiting Infopark, SmartCity and other business hubs in Kochi.The property offers flexible workspaces, smart TVs and high-speed WiFi across rooms and suites..

Next Story
Real Estate

WorkEZ Expands South India Portfolio to 1.7 Mn Sq Ft

Work Easy Space Solutions (WorkEZ) has expanded its managed workspace portfolio to approximately 1.7 million sq. ft. across 12 operational buildings and two upcoming developments, strengthening its footprint across South India.The expansion includes the addition of 65,000 sq. ft. at Phoenix One National Park in Chennai and the company’s entry into Kochi through a partnership with Lulu Developers, adding another 70,000 sq. ft.WorkEZ has also signed a 0.4 million sq. ft. development in Coimbatore with Veeras Infra following the successful leasing of 0.1 million sq. ft. in the first phase. The ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement