ONGC Videsh Seeks Eighth Extension for Vietnam Block
OIL & GAS

ONGC Videsh Seeks Eighth Extension for Vietnam Block

ONGC Videsh Ltd, India's flagship overseas firm, has applied for an eighth extension, spanning three years, to continue its oil and gas exploration efforts within a Vietnamese block situated in the contentious South China Sea. The overseas arm of the state-owned Oil and Natural Gas Corporation (ONGC) has maintained its presence in the region for nearly two decades, despite not discovering commercially recoverable reserves.

Officials have disclosed that ONGC Videsh received its seventh extension for exploration until June 15, 2023, and is currently engaged in negotiations with Vietnamese authorities to secure another three-year extension. A formal proposal for the extension of the exploration phase-1 has been submitted to the regulator, PVN, and awaits approval.

Since the block's acquisition in May 2006, OVL has consistently undertaken exploration efforts, conducting seismic data acquisitions and drilling activities. Despite not encountering commercially viable oil and gas deposits, the company has continued its presence, largely due to India's strategic interests in the South China Sea.

Vietnam, too, recognizes the significance of ONGC Videsh's involvement in countering China's influence in the contested waters.

The exploration for deepwater Block-128, encompassing 7,058 square kilometres in the Offshore PhuKhanh Basin, began in 2006 through a production sharing contract with PetroVietnam. Despite OVL's efforts, no commercial discoveries have been made within the 17-year timeframe.

The block's location falls within the area over which China claims sovereignty, generating tensions between India and China. Notably, China warned ONGC Videsh in 2011 that its exploration activities violated its sovereignty, yet the company persisted.

While ONGC Videsh seeks the extension for strategic reasons, its engagement in another Vietnamese block, Block 06.1, has yielded results. The company's 45% stake in Block 06.1 has contributed to oil and gas production, with the Vietnam government extending the production sharing contract for an additional 16 years.

The persistence of ONGC Videsh in the South China Sea reflects India's commitment to regional stability and its strategic interests, even amid territorial disputes.

ONGC Videsh Ltd, India's flagship overseas firm, has applied for an eighth extension, spanning three years, to continue its oil and gas exploration efforts within a Vietnamese block situated in the contentious South China Sea. The overseas arm of the state-owned Oil and Natural Gas Corporation (ONGC) has maintained its presence in the region for nearly two decades, despite not discovering commercially recoverable reserves.Officials have disclosed that ONGC Videsh received its seventh extension for exploration until June 15, 2023, and is currently engaged in negotiations with Vietnamese authorities to secure another three-year extension. A formal proposal for the extension of the exploration phase-1 has been submitted to the regulator, PVN, and awaits approval.Since the block's acquisition in May 2006, OVL has consistently undertaken exploration efforts, conducting seismic data acquisitions and drilling activities. Despite not encountering commercially viable oil and gas deposits, the company has continued its presence, largely due to India's strategic interests in the South China Sea.Vietnam, too, recognizes the significance of ONGC Videsh's involvement in countering China's influence in the contested waters.The exploration for deepwater Block-128, encompassing 7,058 square kilometres in the Offshore PhuKhanh Basin, began in 2006 through a production sharing contract with PetroVietnam. Despite OVL's efforts, no commercial discoveries have been made within the 17-year timeframe.The block's location falls within the area over which China claims sovereignty, generating tensions between India and China. Notably, China warned ONGC Videsh in 2011 that its exploration activities violated its sovereignty, yet the company persisted.While ONGC Videsh seeks the extension for strategic reasons, its engagement in another Vietnamese block, Block 06.1, has yielded results. The company's 45% stake in Block 06.1 has contributed to oil and gas production, with the Vietnam government extending the production sharing contract for an additional 16 years.The persistence of ONGC Videsh in the South China Sea reflects India's commitment to regional stability and its strategic interests, even amid territorial disputes.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?