Adani Green transfers 74% stake of Mundra Solar to Adani Tradecom
POWER & RENEWABLE ENERGY

Adani Green transfers 74% stake of Mundra Solar to Adani Tradecom

Adani Renewable Energy Holding Four, a fully-owned company of Adani Green Energy (AGEL), has transferred a 74% stake of Mundra Solar Energy (MSEL) to Adani Tradecom LLP (ATLLP).

AGEL revealed the details of the transfer to the Bombay Stock Exchange (BSE). Altogether, 7,400 equity shares were transferred to ATLLP at a face value of Rs 10 each accumulating to Rs 74,000.

The approved share capital of MSEL is Rs 500,000, while the paid-up share capital is Rs 100,000.

MSEL is a step-down subsidiary of the AGEL, consolidated in India and registered with the Registrar of Companies in Ahmedabad, Gujarat, on October 18, 2019.

The transfer to ATLLP has been done on an arm’s length basis and shareholding transfer based on an independent valuation report.

MSEL was consolidated to produce crystalline silicon solar photovoltaic cells, modules, and ancillary operations. These procedures are related to the line of businesses initiated by Adani Enterprises through its subsidiary, Mundra Solar PV. This procurement is anticipated to bring synergy to Adani’s current manufacturing operations and improve the market share by its brand value.

MSEL was a special purpose vehicle designed to engage in the manufacturing-linked solar project development tender. The tender had stated that the bidders had to have 26% ownership in a solar manufacturing unit and the same body had to initiate manufacturing of capacity under this tender.

MSEL was formed with a 26% shareholding in MSPVL and 74% by Adani Green. According to an executive of MSEL, the company is transforming its units and this transfer is a part of the process.

In 2020, Adani Solar elaborated its plans to develop its cell and module manufacturing facility with an added capacity building of 2 GW. A spokesperson of Adani Solar told the media that the new capacity will come online in 2021. The stated capacity increase of its facility is in expectation of the domestic demand of 10-12 GW in 2021. The company’s total cell and module manufacturing capacity will reach 3.5 GW by the expansion, the spokesperson added.

Last week, AGEL confirmed a share purchase agreement to obtain a 100% shareholding in SB Energy India from SoftBank Group (80%) and Bharti Group (20%).

The transaction records the largest procurement in the renewable energy sector in India. SB Energy India’s transaction costs at an enterprise valuation of about Rs 260 billion. The transaction is expected to be completed by August 2021.

Image Source


Also read: Adani Green to purchase 5GW renewable assets of SB Energy India

Also read: Total SE buys 20% stake in Adani Green

Adani Renewable Energy Holding Four, a fully-owned company of Adani Green Energy (AGEL), has transferred a 74% stake of Mundra Solar Energy (MSEL) to Adani Tradecom LLP (ATLLP). AGEL revealed the details of the transfer to the Bombay Stock Exchange (BSE). Altogether, 7,400 equity shares were transferred to ATLLP at a face value of Rs 10 each accumulating to Rs 74,000. The approved share capital of MSEL is Rs 500,000, while the paid-up share capital is Rs 100,000. MSEL is a step-down subsidiary of the AGEL, consolidated in India and registered with the Registrar of Companies in Ahmedabad, Gujarat, on October 18, 2019. The transfer to ATLLP has been done on an arm’s length basis and shareholding transfer based on an independent valuation report. MSEL was consolidated to produce crystalline silicon solar photovoltaic cells, modules, and ancillary operations. These procedures are related to the line of businesses initiated by Adani Enterprises through its subsidiary, Mundra Solar PV. This procurement is anticipated to bring synergy to Adani’s current manufacturing operations and improve the market share by its brand value. MSEL was a special purpose vehicle designed to engage in the manufacturing-linked solar project development tender. The tender had stated that the bidders had to have 26% ownership in a solar manufacturing unit and the same body had to initiate manufacturing of capacity under this tender. MSEL was formed with a 26% shareholding in MSPVL and 74% by Adani Green. According to an executive of MSEL, the company is transforming its units and this transfer is a part of the process. In 2020, Adani Solar elaborated its plans to develop its cell and module manufacturing facility with an added capacity building of 2 GW. A spokesperson of Adani Solar told the media that the new capacity will come online in 2021. The stated capacity increase of its facility is in expectation of the domestic demand of 10-12 GW in 2021. The company’s total cell and module manufacturing capacity will reach 3.5 GW by the expansion, the spokesperson added. Last week, AGEL confirmed a share purchase agreement to obtain a 100% shareholding in SB Energy India from SoftBank Group (80%) and Bharti Group (20%). The transaction records the largest procurement in the renewable energy sector in India. SB Energy India’s transaction costs at an enterprise valuation of about Rs 260 billion. The transaction is expected to be completed by August 2021. Image Source Also read: Adani Green to purchase 5GW renewable assets of SB Energy India Also read: Total SE buys 20% stake in Adani Green

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement