Argentina removes accidental solar panels from Chilean side of border
POWER & RENEWABLE ENERGY

Argentina removes accidental solar panels from Chilean side of border

Argentina started removing solar panels that were mistakenly installed on the Chilean side of their shared border, following a complaint from Chilean President Gabriel Boric. The incident occurred in late April when the Argentine Navy inaugurated a maritime surveillance post in the Patagonia region. The solar panels, intended to power the military unit, were inadvertently set up on Chilean territory.

In response, the Argentine Navy issued a statement acknowledging the error and confirming the deployment of personnel and resources to remove the solar panels. "We have transferred personnel and means to begin the removal of a solar panel installed in the territory of the sister republic of Chile, north of the Island of Tierra del Fuego," the statement read.

Earlier in the day, President Boric had insisted on the removal of the panels, warning that Chile would take action if necessary. "Borders are not something that can be ambiguous. It is a basic principle of respect between countries and therefore they must remove those solar panels as soon as possible or we are going to do it," Boric stated during a visit to Paris. Chile and Argentina share a border of approximately 5,000 kilometers (more than 3,000 miles).

(Source: ET Energy)

Argentina started removing solar panels that were mistakenly installed on the Chilean side of their shared border, following a complaint from Chilean President Gabriel Boric. The incident occurred in late April when the Argentine Navy inaugurated a maritime surveillance post in the Patagonia region. The solar panels, intended to power the military unit, were inadvertently set up on Chilean territory. In response, the Argentine Navy issued a statement acknowledging the error and confirming the deployment of personnel and resources to remove the solar panels. We have transferred personnel and means to begin the removal of a solar panel installed in the territory of the sister republic of Chile, north of the Island of Tierra del Fuego, the statement read. Earlier in the day, President Boric had insisted on the removal of the panels, warning that Chile would take action if necessary. Borders are not something that can be ambiguous. It is a basic principle of respect between countries and therefore they must remove those solar panels as soon as possible or we are going to do it, Boric stated during a visit to Paris. Chile and Argentina share a border of approximately 5,000 kilometers (more than 3,000 miles). (Source: ET Energy)

Next Story
Infrastructure Energy

Mizoram To Build Rs 139 Billion Pumped Storage Power Plant

Mizoram Chief Minister Lalduhoma on Friday announced plans to construct a 2,400 MW pumped storage hydroelectric power plant in Hnahthial district, marking a major step towards achieving energy self-sufficiency in the state. Addressing the Mizo Students’ Union general conference in Hnahthial town, the Chief Minister said the plant would be developed across the Darzo Nallah, a tributary of the Tuipui river. Once operational, the project is expected to play a pivotal role in meeting Mizoram’s rising electricity demand and reducing dependence on imported power. Officials from the State Power..

Next Story
Infrastructure Energy

Centre Plans Nationwide Opening Of Power Retail Market

India is preparing to open up its retail electricity market to private companies nationwide, effectively ending the long-standing monopoly of state-run power distributors in most regions, according to a draft bill released by the Union Power Ministry on Friday. The move will enable major private sector players — including Adani Enterprises, Tata Power, Torrent Power, and CESC — to expand their presence across the country’s electricity distribution landscape. A similar reform attempt in 2022 had faced strong opposition from state-run distribution companies (discoms), which currently dom..

Next Story
Infrastructure Energy

CEA Sets 100 GW Nuclear Target For India By 2047

In a landmark step marking its 52nd Foundation Day, the Central Electricity Authority (CEA) unveiled an ambitious roadmap to develop 100 gigawatts (GW) of nuclear power capacity by 2047, aligning with India’s long-term Net-Zero commitment and energy security objectives. The event, held at the Central Water Commission auditorium in New Delhi’s R.K. Puram, was attended by Pankaj Agarwal, Secretary, Ministry of Power, who served as the Chief Guest. The roadmap sets out a detailed plan to expand India’s nuclear capacity from its current level of approximately 8,180 MW as of early 2025, outl..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?