Bangladesh Announces Tenders for 353 MW Solar Projects
POWER & RENEWABLE ENERGY

Bangladesh Announces Tenders for 353 MW Solar Projects

The Bangladesh Power Development Board (BPDB) has issued 12 international tenders for 353 MW of grid-connected solar power projects. The bidding process will follow a one-stage, two-envelope format, with bids due by February 3, 2025, and opening on the same day.

Each tender requires a bid document fee of BDT 25,000 and a bid security fee of BDT 250,000. The projects, funded through BPDB’s revenue budget, will be developed across various regions:

  • Sudharam, Noakhali: 10 MW
  • Hathazari, Chattogram: 18 MW
  • Sabujpara, Nilphamari: 20 MW
  • Moulavibazar: 25 MW
  • Bajitpur, Kishoreganj: 25 MW
  • Kaptai, Rangamti: 25 MW
  • Teknaf, Cox’s Bazar: 30 MW
  • Lohagara, Chattogram: 30 MW
  • Nobabganj, Dhaka: 35 MW
  • Kurigram: 45 MW
  • Fatikchari, Chattogram: 45 MW
  • Bhaluka, Mymensingh: 45 MW
  • In recent years, Bangladesh has actively pursued solar energy expansion:

  • In 2024, the Bay of Bengal Power Company tendered a 160 MW solar project at Maheshkhali Peninsula, Cox’s Bazar.
  • In 2023, BPDB floated tenders for over 127.6 MW of solar projects, including a 50 MW project at Rangunia, Chattogram.
  • Amara Raja Infra, alongside Premier Solar Powertech, secured a 100 MW solar project from the Rural Power Company in 2023.
  • Solar contributed 459 MW to Bangladesh’s power generation in 2022-2023. The government, with World Bank support, signed a $515 million agreement in 2022 to modernise electricity distribution, enhancing the infrastructure of 25 rural cooperatives.

    The new tenders signal Bangladesh’s ongoing commitment to clean energy and its transition to sustainable power solutions.

    (Mercom)

    The Bangladesh Power Development Board (BPDB) has issued 12 international tenders for 353 MW of grid-connected solar power projects. The bidding process will follow a one-stage, two-envelope format, with bids due by February 3, 2025, and opening on the same day. Each tender requires a bid document fee of BDT 25,000 and a bid security fee of BDT 250,000. The projects, funded through BPDB’s revenue budget, will be developed across various regions: Sudharam, Noakhali: 10 MW Hathazari, Chattogram: 18 MW Sabujpara, Nilphamari: 20 MW Moulavibazar: 25 MW Bajitpur, Kishoreganj: 25 MW Kaptai, Rangamti: 25 MW Teknaf, Cox’s Bazar: 30 MW Lohagara, Chattogram: 30 MW Nobabganj, Dhaka: 35 MW Kurigram: 45 MW Fatikchari, Chattogram: 45 MW Bhaluka, Mymensingh: 45 MW In recent years, Bangladesh has actively pursued solar energy expansion: In 2024, the Bay of Bengal Power Company tendered a 160 MW solar project at Maheshkhali Peninsula, Cox’s Bazar. In 2023, BPDB floated tenders for over 127.6 MW of solar projects, including a 50 MW project at Rangunia, Chattogram. Amara Raja Infra, alongside Premier Solar Powertech, secured a 100 MW solar project from the Rural Power Company in 2023. Solar contributed 459 MW to Bangladesh’s power generation in 2022-2023. The government, with World Bank support, signed a $515 million agreement in 2022 to modernise electricity distribution, enhancing the infrastructure of 25 rural cooperatives. The new tenders signal Bangladesh’s ongoing commitment to clean energy and its transition to sustainable power solutions. (Mercom)

    Next Story
    Infrastructure Transport

    Chennai Airport Contractor Must Be Appointed via Tender: HC

    The Madras High Court has directed that any new ground handling contractor appointed at Chennai International Airport must be selected through a transparent public tender process. The ruling comes amid legal proceedings related to the Airports Authority of India’s (AAI) cancellation of its agreement with Celebi Ground Services Chennai Pvt. Ltd.The court specified that the tender must explicitly state that the final appointment of a contractor will be subject to the outcome of cases pending before both the Madras and Delhi High Courts. These proceedings concern the revocation of Celebi’s se..

    Next Story
    Equipment

    India Unveils First Locally Made Runway Cleaning System

    In a significant step forward for the Government of India’s ‘Make in India’ campaign, the country’s first indigenously developed airport runway rubber and paint removal system, named CleanJet, has been launched. The advanced equipment, built by Bengaluru-based MSME Anlon Technology Solutions Limited, marks India’s entry into manufacturing this highly specialised aviation technology.Union Minister of State for Micro, Small and Medium Enterprises, Shobha Karandlaje, unveiled the system, which is officially called the Runway Rubber and Paint Removal Equipment System (RRPRES). The system..

    Next Story
    Infrastructure Transport

    Cabinet Clears Rs 64 Billion Rail Projects in Key States

    The Cabinet Committee on Economic Affairs, chaired by Prime Minister Shri Narendra Modi, has approved two major railway infrastructure projects with a combined investment of Rs 64.05 billion. These projects aim to strengthen connectivity and freight movement across key states while supporting the government’s multi-modal logistics strategy.The approved projects include the 133-kilometre Koderma–Barkakana doubling in Jharkhand and the 185-kilometre Ballari–Chikjajur doubling, spanning Karnataka and Andhra Pradesh. Together, they will expand the Indian Railways network by 318 kilometres an..

    Advertisement

    Advertisement

    Subscribe to Our Newsletter

    Get daily newsletters around different themes from Construction world.

    STAY CONNECTED

    Advertisement

    Advertisement

    Advertisement

    Advertisement

    Talk to us?