CG Power Opens Rs 76 Billion Chip Plant in Gujarat
POWER & RENEWABLE ENERGY

CG Power Opens Rs 76 Billion Chip Plant in Gujarat

Engineering firm CG Power and Industrial Solutions Ltd announced on Thursday that its subsidiary, CG Semi Private Ltd, has inaugurated India’s first full-service outsourced semiconductor assembly and test (OSAT) facility in Sanand, Gujarat. This development marks a significant milestone in India's semiconductor mission, boosting the nation’s manufacturing self-reliance and its presence in global chip markets.
The new OSAT facility positions CG Semi among the country's pioneering chip packaging and testing providers, offering both traditional and advanced packaging solutions. The initiative, supported by both central and state governments, has been developed in collaboration with global semiconductor players Renesas and Stars Microelectronics.
CG Semi plans to invest more than Rs 76 billion (approx. USD 870 million) over five years to build two advanced facilities—G1 and G2—in Sanand. The G1 unit, inaugurated on August 28, will reach a peak capacity of 0.5 million units per day and is equipped for end-to-end chip assembly, packaging, testing, and post-test processes. It boasts high-yield machinery, a level-1 automated manufacturing execution system (MES) for traceability, and in-house labs for failure and reliability analysis. The facility is currently undergoing ISO 9001 and IATF 16949 certifications, with customer qualification runs set to begin shortly.
Commercial production is expected to start in calendar year 2026, in line with CG Semi’s commitment to India Semiconductor Mission (ISM). Meanwhile, the G2 facility—located 3 km from G1—is under construction and will scale operations to handle up to 14.5 million units daily by the end of 2026. Combined, the two sites are projected to create over 5,000 direct and indirect jobs.
Speaking at the launch, CG Power Chairman Vellayan Subbiah called the facility a “national milestone,” underscoring its significance in the Indian government’s vision of technological sovereignty. “Every chip we make here is a step toward India's self-reliance,” he said.
On the Bombay Stock Exchange, CG Power’s shares closed at Rs 663.65 on August 28, down by Rs 7.55 or 1.12 per cent. 

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Engineering firm CG Power and Industrial Solutions Ltd announced on Thursday that its subsidiary, CG Semi Private Ltd, has inaugurated India’s first full-service outsourced semiconductor assembly and test (OSAT) facility in Sanand, Gujarat. This development marks a significant milestone in India's semiconductor mission, boosting the nation’s manufacturing self-reliance and its presence in global chip markets.The new OSAT facility positions CG Semi among the country's pioneering chip packaging and testing providers, offering both traditional and advanced packaging solutions. The initiative, supported by both central and state governments, has been developed in collaboration with global semiconductor players Renesas and Stars Microelectronics.CG Semi plans to invest more than Rs 76 billion (approx. USD 870 million) over five years to build two advanced facilities—G1 and G2—in Sanand. The G1 unit, inaugurated on August 28, will reach a peak capacity of 0.5 million units per day and is equipped for end-to-end chip assembly, packaging, testing, and post-test processes. It boasts high-yield machinery, a level-1 automated manufacturing execution system (MES) for traceability, and in-house labs for failure and reliability analysis. The facility is currently undergoing ISO 9001 and IATF 16949 certifications, with customer qualification runs set to begin shortly.Commercial production is expected to start in calendar year 2026, in line with CG Semi’s commitment to India Semiconductor Mission (ISM). Meanwhile, the G2 facility—located 3 km from G1—is under construction and will scale operations to handle up to 14.5 million units daily by the end of 2026. Combined, the two sites are projected to create over 5,000 direct and indirect jobs.Speaking at the launch, CG Power Chairman Vellayan Subbiah called the facility a “national milestone,” underscoring its significance in the Indian government’s vision of technological sovereignty. “Every chip we make here is a step toward India's self-reliance,” he said.On the Bombay Stock Exchange, CG Power’s shares closed at Rs 663.65 on August 28, down by Rs 7.55 or 1.12 per cent. 

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement