Chennai's Tangedco seeks tenders for smart metres
POWER & RENEWABLE ENERGY

Chennai's Tangedco seeks tenders for smart metres

Tangedco has taken the first step towards addressing the longstanding demand for monthly reading of power consumption by floating tenders to replace existing digital metres with smart metres. The tenders cover low tension connections, including domestic and small-scale industries linked to low-tension current transformers (LTCT) in 24 districts, such as Madurai, Trichy, Coimbatore, and Tirunelveli. Tangedco officials mentioned that tenders for Chennai and other districts will also be floated soon. They added that Package 3 will be floated in due course.

Although 1.25 lakh smart metres have already been installed in T Nagar and a portion of Kodambakkam as part of the smart city project, consumption continues to be read bi-monthly. Smart metres offer various features, including automated consumption reading on the last day of the cycle, automatic disconnection for non-payment of electricity bills, and reconnection once payment is made. They also have prepaid functionality and provide real-time consumption patterns. Electricity Minister V Senthil Balaji had previously stated that monthly reading of power consumption can only be achieved through the installation of smart metres, eliminating the need for physical assessment.

Despite a 40% vacancy for assessors in Tangedco, the recruitment process has been put on hold as their roles may become obsolete with the implementation of smart metres. However, even after the installation of smart metres in all households and commercial spaces, which is expected to be completed before 2025, the decision to introduce monthly consumption reading will ultimately rest with the state government.

Under the Revamped Distribution Standards Scheme (RDSS), a total of 1.83 crore smart metres will be procured for the 24 districts. The contracts will follow the DBFOOT (design, build, finance, own, operate, and transfer) model. Consumers will not incur any charges for the smart metres, and Tangedco will also acquire approximately 4 lakh additional smart metres for future service connections.

The initial phase of installation will focus on houses, shops, and workplaces at the tail-end of the network, while subsequent phases will involve installing smart metres in substations, feeders, and distribution transformers to monitor transmission and distribution losses. Officials stated that digital metres can only be upgraded for automated reading purposes.

Also read:
WIPPA urges government action for wind energy growth
Tata Power subsidiary wins 966 MW hybrid project for Tata Steel


Tangedco has taken the first step towards addressing the longstanding demand for monthly reading of power consumption by floating tenders to replace existing digital metres with smart metres. The tenders cover low tension connections, including domestic and small-scale industries linked to low-tension current transformers (LTCT) in 24 districts, such as Madurai, Trichy, Coimbatore, and Tirunelveli. Tangedco officials mentioned that tenders for Chennai and other districts will also be floated soon. They added that Package 3 will be floated in due course. Although 1.25 lakh smart metres have already been installed in T Nagar and a portion of Kodambakkam as part of the smart city project, consumption continues to be read bi-monthly. Smart metres offer various features, including automated consumption reading on the last day of the cycle, automatic disconnection for non-payment of electricity bills, and reconnection once payment is made. They also have prepaid functionality and provide real-time consumption patterns. Electricity Minister V Senthil Balaji had previously stated that monthly reading of power consumption can only be achieved through the installation of smart metres, eliminating the need for physical assessment. Despite a 40% vacancy for assessors in Tangedco, the recruitment process has been put on hold as their roles may become obsolete with the implementation of smart metres. However, even after the installation of smart metres in all households and commercial spaces, which is expected to be completed before 2025, the decision to introduce monthly consumption reading will ultimately rest with the state government. Under the Revamped Distribution Standards Scheme (RDSS), a total of 1.83 crore smart metres will be procured for the 24 districts. The contracts will follow the DBFOOT (design, build, finance, own, operate, and transfer) model. Consumers will not incur any charges for the smart metres, and Tangedco will also acquire approximately 4 lakh additional smart metres for future service connections. The initial phase of installation will focus on houses, shops, and workplaces at the tail-end of the network, while subsequent phases will involve installing smart metres in substations, feeders, and distribution transformers to monitor transmission and distribution losses. Officials stated that digital metres can only be upgraded for automated reading purposes. Also read: WIPPA urges government action for wind energy growth Tata Power subsidiary wins 966 MW hybrid project for Tata Steel

Next Story
Infrastructure Urban

Meghalaya And Assam Hold Talks To End Transport Stoppages In Garo Hills

Meghalaya and Assam have opened talks aimed at ending recent stoppages of commodity transport in the Garo Hills, officials said. The deputy chief minister, in charge of home affairs, reported that both state governments are coordinating to resolve disruptions and to restore normal movement of goods. He acknowledged that misunderstandings may have contributed to the incidents and that clarification between administrative units is under way. The discussions are intended to produce practical arrangements that will allow consignments to move without hindrance while respecting local procedures. The..

Next Story
Infrastructure Transport

Kochi Metro Records 1.375 mn Rise In Passengers In FY26

Kochi Metro recorded a marginal rise in ridership in the financial year 2025-26, carrying 1.375 mn more passengers than in the previous year. The service carried 36.8 million (mn) passengers in 2025-26 compared with 35.5 mn in 2024-25, representing a year-on-year increase of 3.9 per cent. The growth was described as distributed rather than concentrated in isolated spikes. A month-wise analysis shows steady gains across quarters. In the first quarter, ridership increased from 8.57 mn to 8.84 mn, while the second quarter rose from 9.13 mn to 9.51 mn. These trends indicated broad-based improvemen..

Next Story
Infrastructure Transport

Ghaziabad Plans 16km Metro Link To Delhi Via Hindon Airport

Ghaziabad authorities are pursuing a 16 km metro link to Delhi that will run via Hindon Airport, and a detailed project report is under way. The plan is intended to improve connectivity between Ghaziabad and the national capital and to provide an interchange with the airport. Officials said the project is being studied to assess alignments, station locations and cost estimates ahead of formal approvals and tendering. The announcement follows the inauguration of the Delhi?Faridabad metro extension, which will offer hassle free travel for around 0.2 mn daily commuters between the national capita..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement