CleanMax, Nuvoco Partner on 46.4 MW Wind-Solar Project
POWER & RENEWABLE ENERGY

CleanMax, Nuvoco Partner on 46.4 MW Wind-Solar Project

Clean Max Enviro Energy Solutions and Nuvoco Vistas Corporation have partnered to promote renewable energy adoption in Rajasthan through a 46.4 MW wind-solar hybrid project. The initiative is located at Bhikamkhore in the state and has been developed under a group captive structure for long-term clean energy procurement.

The project combines 20 MW of wind capacity with 26.4 MWp of solar capacity and a 2 MWh battery energy storage system (BESS). The hybrid configuration is intended to support the supply of renewable power to Nuvoco while combining generation from wind and solar assets with storage capability.

Electricity generated by the project will be supplied to Nuvoco through the State Transmission Utility (STU) Open Access network. The project adds to CleanMax’s renewable energy portfolio in Rajasthan, which the company identifies as a key market for large-scale development serving commercial and industrial (C&I) customers.

CleanMax has an operational portfolio of more than 525 MW across solar, wind and hybrid assets in Rajasthan. The company’s partnership with Nuvoco expands its presence in the state and supports the cement maker’s procurement of renewable power for its manufacturing operations.

Nuvoco is pursuing lower carbon intensity through renewable energy, waste heat recovery systems (WHRS), energy efficiency measures and greater use of alternative fuels. The project also supports its Digitalisation, Innovation and Renewables (DIRE) agenda, which covers climate action, the renewable energy transition, water stewardship, circularity and biodiversity conservation across its manufacturing ecosystem.

Clean Max Enviro Energy Solutions and Nuvoco Vistas Corporation have partnered to promote renewable energy adoption in Rajasthan through a 46.4 MW wind-solar hybrid project. The initiative is located at Bhikamkhore in the state and has been developed under a group captive structure for long-term clean energy procurement. The project combines 20 MW of wind capacity with 26.4 MWp of solar capacity and a 2 MWh battery energy storage system (BESS). The hybrid configuration is intended to support the supply of renewable power to Nuvoco while combining generation from wind and solar assets with storage capability. Electricity generated by the project will be supplied to Nuvoco through the State Transmission Utility (STU) Open Access network. The project adds to CleanMax’s renewable energy portfolio in Rajasthan, which the company identifies as a key market for large-scale development serving commercial and industrial (C&I) customers. CleanMax has an operational portfolio of more than 525 MW across solar, wind and hybrid assets in Rajasthan. The company’s partnership with Nuvoco expands its presence in the state and supports the cement maker’s procurement of renewable power for its manufacturing operations. Nuvoco is pursuing lower carbon intensity through renewable energy, waste heat recovery systems (WHRS), energy efficiency measures and greater use of alternative fuels. The project also supports its Digitalisation, Innovation and Renewables (DIRE) agenda, which covers climate action, the renewable energy transition, water stewardship, circularity and biodiversity conservation across its manufacturing ecosystem.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Alstom Automates Bengaluru Metro's 7.5 km Pink Line Section

Alstom has announced the commencement of passenger services on the 7.5 km elevated priority section of Bengaluru Metro's Pink Line Reach 6, equipped with its communications-based train control (CBTC) signalling technology. The section connects key residential, educational and healthcare hubs across South Bengaluru, strengthening the city's urban transport network.The priority section operates under Grade of Automation 2 (GoA2), enabling automatic train operation (ATO) from the first day of revenue service, a first for an Indian metro project. Under this system, train acceleration and braking a..

Next Story
Infrastructure Transport

Alstom Begins Production of 96 Driverless Chennai Metro Cars

Alstom has commenced manufacturing 96 Metropolis driverless metro cars for Chennai Metro Phase II at its Sri City facility in Andhra Pradesh. The production forms part of a €135 million contract awarded by Chennai Metro Rail Limited (CMRL) in 2025, covering the design and manufacture of 32 three-car trainsets and 15 years of comprehensive maintenance following the warranty period.Chennai Metro Phase II spans approximately 119 km across three corridors and associated inter-corridor sections, comprising more than 76 km of elevated tracks and 43 km of underground routes.Under the Make in India ..

Next Story
Products

Hafele launches Alustro flexible shelving system

Häfele India has introduced the Alustro Flexible Shelving System, a modular storage solution designed to maximise space and offer flexibility in residential interiors. The system can be configured for applications such as room dividers, walk-in wardrobes, kitchen units, wall-mounted shelves and vanity mirrors.Alustro allows users to combine aluminium, wooden and glass shelves within a single structure. It supports shelf heights of up to 3,000 mm and section widths of up to 1,164 mm. Additional options include coat stand profiles with protective gaskets for wardrobes and front- or rear-facing ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code