+
Experts: Aadhaar no. to manage recycling of batteries
POWER & RENEWABLE ENERGY

Experts: Aadhaar no. to manage recycling of batteries

The roadmap aims to fill critical gaps in the current research and development framework. While many identified projects are yet to achieve global success, some areas already demonstrate significant international accomplishments where India is yet to commence preparations," said Prof Karthick Athmanathan, a member of the Consultative Group of e-Mobility Advisory Committee.

The roadmap has listed 34 projects for research and development across four broad areas - energy storage cells, EV aggregates, materials and recycling, charging and refueling.

Among the projects listed for R&D is development of a battery Aadhaar system that would help adopt efficient recycling procedures for batteries that are more beneficial to the environment.

"It is a completely thought out standardization of a 16-digit number, which will provide complete information about the battery pack. It will help us in the battery's second use, recyclability and everything during the life-cycle of that battery," said Abhijit Mulay, Deputy Director, Automotive Research Association of India (ARAI).

A similar project called the battery passport is underway in Germany with financial support from the federal government in Berlin.

In the Indian context, the roadmap suggested development of the battery Aadhaar standardized system or protocol to improve sustainability, efficiency and safety in manufacturing, usage and recycling by providing a detailed information about each battery's composition, usage history and end-of-life management.

The proposed Aadhaar numeric barcode for each battery would contain the data and description about the battery manufacturing year, lithium import, electrode materials, cell localization, manufacturing history, battery chemistry, battery capacity, manufacturing location and battery potting.

"This information will be more convenient to recyclers for streamlining the recycling process," Mulay said. Addressing the gathering earlier, Sood said India has set itself a goal to achieve energy independence by 2047 and 30 per cent electric vehicle penetration by 2030 as part of efforts to achieve net-zero emissions by 2070. The e-Mobility R&D Roadmap has assigned high priority to this project due to the significant need for digital data storage, transparency, traceability and localization of batteries. The roadmap stated that determination of these parameters will aid in second life applications as well as recycling and management of batteries.

The roadmap aims to fill critical gaps in the current research and development framework. While many identified projects are yet to achieve global success, some areas already demonstrate significant international accomplishments where India is yet to commence preparations, said Prof Karthick Athmanathan, a member of the Consultative Group of e-Mobility Advisory Committee. The roadmap has listed 34 projects for research and development across four broad areas - energy storage cells, EV aggregates, materials and recycling, charging and refueling. Among the projects listed for R&D is development of a battery Aadhaar system that would help adopt efficient recycling procedures for batteries that are more beneficial to the environment. It is a completely thought out standardization of a 16-digit number, which will provide complete information about the battery pack. It will help us in the battery's second use, recyclability and everything during the life-cycle of that battery, said Abhijit Mulay, Deputy Director, Automotive Research Association of India (ARAI). A similar project called the battery passport is underway in Germany with financial support from the federal government in Berlin. In the Indian context, the roadmap suggested development of the battery Aadhaar standardized system or protocol to improve sustainability, efficiency and safety in manufacturing, usage and recycling by providing a detailed information about each battery's composition, usage history and end-of-life management. The proposed Aadhaar numeric barcode for each battery would contain the data and description about the battery manufacturing year, lithium import, electrode materials, cell localization, manufacturing history, battery chemistry, battery capacity, manufacturing location and battery potting. This information will be more convenient to recyclers for streamlining the recycling process, Mulay said. Addressing the gathering earlier, Sood said India has set itself a goal to achieve energy independence by 2047 and 30 per cent electric vehicle penetration by 2030 as part of efforts to achieve net-zero emissions by 2070. The e-Mobility R&D Roadmap has assigned high priority to this project due to the significant need for digital data storage, transparency, traceability and localization of batteries. The roadmap stated that determination of these parameters will aid in second life applications as well as recycling and management of batteries.

Related Stories

Gold Stories

Next Story
Real Estate

Adani begins construction of Dharavi rehabilitation homes

Construction of rehabilitation homes for eligible Dharavi residents has commenced at the 22-acre Matunga railway site, following a Bhoomi Poojan ceremony performed by Pranav Adani, Director, Adani Enterprises (AEL). The project, being implemented by Adani Navbharat Developers (ANDPL), envisages 10 towers comprising 10,432 rehabilitation apartments and 1,379 commercial and industrial units.Under the in-situ rehabilitation scheme, eligible residents will receive homes measuring 350 sq ft. Residents from Sectors 6 and 1 will be accommodated at Matunga first, followed by nearly 4,500 apartments fo..

Next Story
Real Estate

Adani begins construction of Dharavi rehabilitation homes

Construction of rehabilitation homes for eligible Dharavi residents has commenced at the 22-acre Matunga railway site, following a Bhoomi Poojan ceremony performed by Pranav Adani, Director, Adani Enterprises (AEL). The project, being implemented by Adani Navbharat Developers (ANDPL), envisages 10 towers comprising 10,432 rehabilitation apartments and 1,379 commercial and industrial units.Under the in-situ rehabilitation scheme, eligible residents will receive homes measuring 350 sq ft. Residents from Sectors 6 and 1 will be accommodated at Matunga first, followed by nearly 4,500 apartments fo..

Next Story
Equipment

Seven Propel 470 HEV electric tippers go to work on coal haulage in Chhattisgarh

Propel EV, the electric mobility division of Propel Industries and India's No. 1 electric tipper brand, has deployed seven 470 HEV electric trucks with a leading coal-haulage contractor at one of India's largest opencast coal mines in Chhattisgarh. The trucks are in daily operation, moving coal on continuous haul cycles in one of the most demanding applications in Indian mining.Why Electric - and Why CoalCoal haulage runs round the clock: heavy loads, long haul cycles, steep ramps and abrasive dust. It is also where diesel hurts most. Engines run continuously, fuel is the largest single operat..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code