GHMC launches waste-to-energy plant utilising European tech
POWER & RENEWABLE ENERGY

GHMC launches waste-to-energy plant utilising European tech

The Greater Hyderabad Municipal Corporation (GHMC) is enhancing its waste management strategy by implementing advanced European waste-to-energy practices. A new 152-acre waste-to-energy treatment plant will be established in Pyara Nagar, Sangareddy, leveraging cutting-edge European technology.

The facility has received all necessary approvals for construction. Once operational, it will have the capacity to generate 15 MW of electricity and produce 270 tonnes of biogas daily. Initially, waste will be transported to the site using sealed trucks and stored in an underground bunker, where it will be sorted into wet and dry waste. The dry waste will be utilized for electricity generation, while the wet waste will be processed into compressed biogas (CBG).

To minimize environmental impact, the entire waste treatment process will occur within an enclosed structure, preventing the release of odors or wastewater into the environment. Advanced biofilters will be installed to purify the air and eliminate unpleasant smells. The facility will employ dry digestion technology to handle wet waste, significantly reducing leachate production.

In addition to the Pyara Nagar plant, GHMC is exploring four additional sites for future waste-to-energy facilities. These locations include 42.2 acres in Khanapur (Rangareddy district), 100 acres in Lakdaram (Sangareddy), 85 acres in Dundigal, and 200 acres in Malkapur (Choutuppal). These sites, located near Hyderabad, are under evaluation for their suitability for such projects.

GHMC officials noted that the new plants will alleviate pressure on the existing waste treatment facility at Jawahar Nagar, which currently processes 7,500 metric tonnes of waste from GHMC limits and an additional 1,500 metric tonnes from nearby municipalities. The Pyara Nagar plant, estimated to cost ₹600 crore, is expected to be operational by 2025. Additionally, a 24 MW waste-to-energy facility is being developed at Jawahar Nagar to further improve waste management and energy production in the city.

The Greater Hyderabad Municipal Corporation (GHMC) is enhancing its waste management strategy by implementing advanced European waste-to-energy practices. A new 152-acre waste-to-energy treatment plant will be established in Pyara Nagar, Sangareddy, leveraging cutting-edge European technology.The facility has received all necessary approvals for construction. Once operational, it will have the capacity to generate 15 MW of electricity and produce 270 tonnes of biogas daily. Initially, waste will be transported to the site using sealed trucks and stored in an underground bunker, where it will be sorted into wet and dry waste. The dry waste will be utilized for electricity generation, while the wet waste will be processed into compressed biogas (CBG).To minimize environmental impact, the entire waste treatment process will occur within an enclosed structure, preventing the release of odors or wastewater into the environment. Advanced biofilters will be installed to purify the air and eliminate unpleasant smells. The facility will employ dry digestion technology to handle wet waste, significantly reducing leachate production.In addition to the Pyara Nagar plant, GHMC is exploring four additional sites for future waste-to-energy facilities. These locations include 42.2 acres in Khanapur (Rangareddy district), 100 acres in Lakdaram (Sangareddy), 85 acres in Dundigal, and 200 acres in Malkapur (Choutuppal). These sites, located near Hyderabad, are under evaluation for their suitability for such projects.GHMC officials noted that the new plants will alleviate pressure on the existing waste treatment facility at Jawahar Nagar, which currently processes 7,500 metric tonnes of waste from GHMC limits and an additional 1,500 metric tonnes from nearby municipalities. The Pyara Nagar plant, estimated to cost ₹600 crore, is expected to be operational by 2025. Additionally, a 24 MW waste-to-energy facility is being developed at Jawahar Nagar to further improve waste management and energy production in the city.

Next Story
Infrastructure Urban

Recycling Leaders Push for Policy Reforms in India

As India prepares for the largest recycling-focused event in its history, industry leaders are making a strong case for policy reforms to unlock the country’s circular economy potential. Ahead of the Bharat Recycling Show (BRS) 2025, co-located with Plastics Recycling Show (PRS) India, a high-level panel discussion in Mumbai spotlighted the urgent need for regulatory clarity, digital innovation, and integration of the informal sector.Held under the theme “Unlocking Circular Value: Regulatory and Market Trends in Recycling”, the panel brought together prominent voices from across the recy..

Next Story
Infrastructure Energy

Environmental Hearing Set for 1000 MW Naying Hydro Project

The environmental public hearing for the 1,000 MW Naying hydroelectric project will take place on November 12 at Yapik community hall in Shi-Yomi district, Arunachal Pradesh, officials confirmed. The run-of-the-river project on the Siyom (Yomgo) river is being developed by the North Eastern Electric Power Corporation (NEEPCO). Construction, including a concrete dam, underground powerhouse, and tunnel, is expected to commence around 2028, with commissioning planned by 2032. The project aims to generate approximately 4,966.77 GWh of electricity. The Naying project received Central Electricity ..

Next Story
Infrastructure Energy

India Achieves 490 MWh Energy Storage Capacity by June 2025

India’s cumulative energy storage capacity reached 490 MWh by June 2025, according to data released by the Central Electricity Authority (CEA). Of this, more than 85 per cent is associated with renewable energy projects, primarily solar and wind, reflecting the country’s accelerated shift towards grid stability and clean energy integration. The CEA report highlights that 16 energy storage systems are currently operational across 10 states, with major installations in Rajasthan, Gujarat, Karnataka, and Maharashtra. These include both standalone and co-located battery systems deployed by le..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?