Gujarat entity tenders for 1.5 GW of solar power procurement
POWER & RENEWABLE ENERGY

Gujarat entity tenders for 1.5 GW of solar power procurement

Gujarat Urja Vikas Nigam Ltd (GUVNL) has issued a tender to procure up to 1.5 GW of solar power from grid-connected PV projects through competitive bidding. The successful developers will supply the power from their proposed or under-construction PV projects.

Out of 1.5 GW capacity, 750 MW will be awarded under the greenshoe option. GUVNL may enter into a 25-year power purchase agreement (PPA) with the successful bidders.

The bidders selected by GUVNL shall set up solar power projects in Gujarat, including the electrical network up to the delivery point. They can opt for connectivity at a state transmission utility (STU) or central transmission utility (CTU) sub-station.

Projects under construction and not having any PPA with existing buyers shall also be eligible to participate in the tender.

Solar projects can be set up in an existing wind farm that is already connected to the grid, subject to the availability of spare capacity for RE integration at the corresponding GETCO/CTU substation. The minimum project capacity will be 25 MW.

See also:
Rajasthan CM approves setting up two power projects
UT called to expedite Smart Grid pilot project


Gujarat Urja Vikas Nigam Ltd (GUVNL) has issued a tender to procure up to 1.5 GW of solar power from grid-connected PV projects through competitive bidding. The successful developers will supply the power from their proposed or under-construction PV projects. Out of 1.5 GW capacity, 750 MW will be awarded under the greenshoe option. GUVNL may enter into a 25-year power purchase agreement (PPA) with the successful bidders. The bidders selected by GUVNL shall set up solar power projects in Gujarat, including the electrical network up to the delivery point. They can opt for connectivity at a state transmission utility (STU) or central transmission utility (CTU) sub-station. Projects under construction and not having any PPA with existing buyers shall also be eligible to participate in the tender. Solar projects can be set up in an existing wind farm that is already connected to the grid, subject to the availability of spare capacity for RE integration at the corresponding GETCO/CTU substation. The minimum project capacity will be 25 MW.See also: Rajasthan CM approves setting up two power projectsUT called to expedite Smart Grid pilot project

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?