+
India's solar installations in 2021 surpass a record 10 GW capacity
POWER & RENEWABLE ENERGY

India's solar installations in 2021 surpass a record 10 GW capacity

According to Mercom India Research's recently released Q4 and Annual India Solar Market Update report, India installed a record 10 GW of new solar capacity in 2021, a huge jump of 210% year-over-year (YoY) compared to 3.2 GW installed in 2020.

In India, this is the highest annual capacity of solar installations ever.

Solar capacity installed to date totalled 49.3 GW. In addition, the country has a development pipeline of more than 53 GW.

India installed 2.6 GW of solar in Q4 2021, a 7% decrease from the 2.8 GW installed in Q3 2021. When compared to 1.5 GW in Q4 2020, the installations increased by 74% YoY.

According to the report, utility-scale projects accounted for 83% of total installations last year, with 8.3 GW added, a 230% increase over the previous year. Rooftop installations made up the remaining 17%, with nearly 1.7 GW of new installations, a 138% increase over 2020.

As the country slowly recovered from the Covid-19 pandemic, a large number of projects were pushed from 2020 to 2021, contributing to the year's increase in installations.

In comparison to the 2.4 GW added in Q3 2021, 2.2 GW of utility-scale solar was added in Q4 2021. When compared to 1.2 GW installed in Q4 2020, utility-scale installations grew by 82% YoY. Rooftop solar capacity added fell by about 10% in Q4 2021, from 448 MW in Q3 2021 to 402 MW in Q4 2021.

Despite the challenges, including an increase in raw material prices due to supply chain disruptions and Covid-19-induced lockdowns, the industry remained resilient throughout the year, according to the report.

Solar accounted for 12.4% of total installed power capacity and 32% of total installed renewable capacity at the end of December 2021, according to the report.

The year also saw delays in the signing of power purchase agreements (PPAs) and a lack of clarity about the applicable duties, resulting in a 4.3% YoY decrease in solar tenders and a 2.6% decrease in auctions compared to 2020.

Image Source

Also read: India's solar generation surges by 18% YoY to 68.77 BU in 2021

Your next big infra connection is waiting at RAHSTA 2025 – Asia’s Biggest Roads & Highways Expo, Jio World Convention Centre, Mumbai. Don’t miss out!

According to Mercom India Research's recently released Q4 and Annual India Solar Market Update report, India installed a record 10 GW of new solar capacity in 2021, a huge jump of 210% year-over-year (YoY) compared to 3.2 GW installed in 2020. In India, this is the highest annual capacity of solar installations ever. Solar capacity installed to date totalled 49.3 GW. In addition, the country has a development pipeline of more than 53 GW. India installed 2.6 GW of solar in Q4 2021, a 7% decrease from the 2.8 GW installed in Q3 2021. When compared to 1.5 GW in Q4 2020, the installations increased by 74% YoY. According to the report, utility-scale projects accounted for 83% of total installations last year, with 8.3 GW added, a 230% increase over the previous year. Rooftop installations made up the remaining 17%, with nearly 1.7 GW of new installations, a 138% increase over 2020. As the country slowly recovered from the Covid-19 pandemic, a large number of projects were pushed from 2020 to 2021, contributing to the year's increase in installations. In comparison to the 2.4 GW added in Q3 2021, 2.2 GW of utility-scale solar was added in Q4 2021. When compared to 1.2 GW installed in Q4 2020, utility-scale installations grew by 82% YoY. Rooftop solar capacity added fell by about 10% in Q4 2021, from 448 MW in Q3 2021 to 402 MW in Q4 2021. Despite the challenges, including an increase in raw material prices due to supply chain disruptions and Covid-19-induced lockdowns, the industry remained resilient throughout the year, according to the report. Solar accounted for 12.4% of total installed power capacity and 32% of total installed renewable capacity at the end of December 2021, according to the report. The year also saw delays in the signing of power purchase agreements (PPAs) and a lack of clarity about the applicable duties, resulting in a 4.3% YoY decrease in solar tenders and a 2.6% decrease in auctions compared to 2020. Image Source Also read: India's solar generation surges by 18% YoY to 68.77 BU in 2021

Next Story
Real Estate

Mumbai Records 11,230 Property Deals in August 2025

Mumbai’s property market remained resilient in August 2025, with 11,230 property registrations recorded under the Brihanmumbai Municipal Corporation (BMC) jurisdiction, according to data released by Knight Frank India. While this marks a 3 per cent year-on-year (YoY) decline compared to 11,631 registrations in August 2024, activity stayed robust despite the marginal dip.On a month-on-month (MoM) basis, registrations fell 11 per cent from 12,579 deals in July 2025, indicating seasonal moderation. However, the city’s stamp duty collections still reached Rs 10 billion, reflecting a 6 per cent..

Next Story
Infrastructure Transport

68 Jammu-Katra Trains Cancelled Amid Rain Damage

Jammu and Katra railway services remain severely affected as Northern Railway announced the cancellation of 68 trains—both incoming and outgoing—until 30 September, due to extensive track damage caused by heavy rains and flash floods. Meanwhile, 24 trains are scheduled to resume operations gradually.The Jammu railway division has experienced a complete halt in services for the past eight days, following track misalignment and breaches at several points along the Pathankot–Jammu section. Torrential rainfall since 26 August led to widespread flooding and damage, stranding hundreds of passe..

Next Story
Infrastructure Transport

Bangalore Metro MD Reviews Reach 6 and Phase 2A Progress

Bangalore Metro Rail Corporation Limited (BMRCL) Managing Director, Dr J Ravishankar, IAS, conducted inspections of key metro corridors on 29 and 30 August, reviewing the progress of Reach 6 (Pink Line) and Phase 2A (Blue Line).On 30 August, the inspection covered Reach 6, a 21.39-km corridor stretching from Kalena Agrahara to Nagawara, with 18 stations. This stretch is part of Phase 2 of the Bangalore Metro project. Dr Ravishankar assessed the status of civil works, finishing, track laying, and system integration between Kalena Agrahara and MG Road.Earlier, on 29 August, the MD inspected Phas..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?