India Targets 100 GW Nuclear Power by 2047
POWER & RENEWABLE ENERGY

India Targets 100 GW Nuclear Power by 2047

In a move to bolster India’s energy security and clean energy ambitions, the Ministry of Power convened a meeting of the Consultative Committee of Members of Parliament to discuss the “Roadmap for Development of Nuclear Power Generation.” Chaired by Union Minister for Power and Housing & Urban Affairs, Shri Manohar Lal, the session emphasized the strategic role of nuclear energy in achieving India's net zero carbon emissions target by 2070.

Currently, India operates 25 nuclear reactors across seven sites, generating 8,880 MW—about 3% of the country’s total electricity. Another 6,600 MW is under construction, with 7,000 MW more in the pre-project stage. To meet future energy needs, the government has set an ambitious goal: achieving 100 GW (100,000 MW) of nuclear power capacity by 2047, in line with the Viksit Bharat @2047 vision.

Nuclear power, being a non-fossil, stable, and reliable source of energy, was highlighted as vital for reducing dependence on fossil fuels. Beyond power generation, the Minister noted its potential for hydrogen production, desalination, space heating, and industrial steam—key elements in India’s broader energy transition.

To accelerate deployment, the government is planning key reforms, including:

  • Amending the Atomic Energy Act and Civil Liability Law to allow broader participation from state and private sectors
  • Fast-tracking regulatory clearances and facilitating brownfield expansions on retired thermal power sites
  • Offering tax incentives, long-term financing, and classifying nuclear power as green energy
  • Promoting indigenous manufacturing under Make in India and diversifying reactor technologies through competitive bidding
  • Securing uranium supply chains and expanding the equipment vendor base
  • Enhancing skilled manpower through stronger nuclear education and training infrastructure

Members of Parliament welcomed the initiatives and called for expedited execution, stronger public engagement, and a robust ecosystem for vendors and skilled professionals.

The Minister assured close coordination with the Department of Atomic Energy, state governments, and industry to drive nuclear development, reinforcing India’s path to a clean, sustainable, and secure energy future.


In a move to bolster India’s energy security and clean energy ambitions, the Ministry of Power convened a meeting of the Consultative Committee of Members of Parliament to discuss the “Roadmap for Development of Nuclear Power Generation.” Chaired by Union Minister for Power and Housing & Urban Affairs, Shri Manohar Lal, the session emphasized the strategic role of nuclear energy in achieving India's net zero carbon emissions target by 2070.Currently, India operates 25 nuclear reactors across seven sites, generating 8,880 MW—about 3% of the country’s total electricity. Another 6,600 MW is under construction, with 7,000 MW more in the pre-project stage. To meet future energy needs, the government has set an ambitious goal: achieving 100 GW (100,000 MW) of nuclear power capacity by 2047, in line with the Viksit Bharat @2047 vision.Nuclear power, being a non-fossil, stable, and reliable source of energy, was highlighted as vital for reducing dependence on fossil fuels. Beyond power generation, the Minister noted its potential for hydrogen production, desalination, space heating, and industrial steam—key elements in India’s broader energy transition.To accelerate deployment, the government is planning key reforms, including:Amending the Atomic Energy Act and Civil Liability Law to allow broader participation from state and private sectorsFast-tracking regulatory clearances and facilitating brownfield expansions on retired thermal power sitesOffering tax incentives, long-term financing, and classifying nuclear power as green energyPromoting indigenous manufacturing under Make in India and diversifying reactor technologies through competitive biddingSecuring uranium supply chains and expanding the equipment vendor baseEnhancing skilled manpower through stronger nuclear education and training infrastructureMembers of Parliament welcomed the initiatives and called for expedited execution, stronger public engagement, and a robust ecosystem for vendors and skilled professionals.The Minister assured close coordination with the Department of Atomic Energy, state governments, and industry to drive nuclear development, reinforcing India’s path to a clean, sustainable, and secure energy future.

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?