India urges states to consider nuclear power plants, lists utilities
POWER & RENEWABLE ENERGY

India urges states to consider nuclear power plants, lists utilities

India’s federal power minister urged states distant from coal resources to explore establishing nuclear-based power plants, in addition to identifying power utilities that could attract investment to support the rising energy demand.

This year, the Indian government proposed in its federal budget a partnership with private entities to develop small nuclear reactors, aiming to boost electricity generation from sources that do not emit carbon dioxide.

In a government statement, the power minister, Manohar Lal, advised states to consider setting up nuclear power plants at locations where coal-based thermal plants had completed their operational lifespans.

India’s strict nuclear compensation laws have, however, posed challenges in discussions with foreign power plant manufacturers like General Electric and Westinghouse. Currently, with a nuclear capacity of approximately 8 GW, India aims to increase this to 20 GW by 2032.

The minister also called on states to list their power utilities on the stock exchange to secure greater investment in the power sector and to improve transmission infrastructure, which would support additional renewable energy capacity.

India has committed to achieving net-zero carbon emissions by 2070 and aims to reach 500 GW of renewable energy by 2030.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

India’s federal power minister urged states distant from coal resources to explore establishing nuclear-based power plants, in addition to identifying power utilities that could attract investment to support the rising energy demand. This year, the Indian government proposed in its federal budget a partnership with private entities to develop small nuclear reactors, aiming to boost electricity generation from sources that do not emit carbon dioxide. In a government statement, the power minister, Manohar Lal, advised states to consider setting up nuclear power plants at locations where coal-based thermal plants had completed their operational lifespans. India’s strict nuclear compensation laws have, however, posed challenges in discussions with foreign power plant manufacturers like General Electric and Westinghouse. Currently, with a nuclear capacity of approximately 8 GW, India aims to increase this to 20 GW by 2032. The minister also called on states to list their power utilities on the stock exchange to secure greater investment in the power sector and to improve transmission infrastructure, which would support additional renewable energy capacity. India has committed to achieving net-zero carbon emissions by 2070 and aims to reach 500 GW of renewable energy by 2030.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement