Inox Wind bags 200-MW order from NTPC subsidiary
POWER & RENEWABLE ENERGY

Inox Wind bags 200-MW order from NTPC subsidiary

Inox Wind, a wind energy solutions provider, has bagged an order for a 200 MW wind power project from NTPC Renewable Energy, a wholly owned subsidiary of NTPC, to be commissioned in Gujarat. The project will be executed on a turnkey basis at Dayapar site, Gujarat and is scheduled to be commissioned by January 2024.

This amongst many more in the future will help NTPC achieve its target of having over 60 GW Renewable Energy capacity constituting nearly 50% of its overall power generation capacity by 2032.

“This is the second project awarded by NTPC to INOX Wind in the recent past, post a 150 MW order received last year. A few years ago, INOX Wind had also successfully executed a 50 MW turnkey wind project for NTPC in Gujarat,” said Kailash Tarachandani, CEO, Inox Wind.

As part of the order, Inox Wind will supply and install DF 113/92 - 2.0 MW capacity wind turbine generators with 113 meters rotor diameter and 92 m hub height.

Also read:
Inox Wind wins 150 MW wind power order from NTPC Renewable Energy
Inox Wind, Integrum ink pact for wind power projects


Inox Wind, a wind energy solutions provider, has bagged an order for a 200 MW wind power project from NTPC Renewable Energy, a wholly owned subsidiary of NTPC, to be commissioned in Gujarat. The project will be executed on a turnkey basis at Dayapar site, Gujarat and is scheduled to be commissioned by January 2024. This amongst many more in the future will help NTPC achieve its target of having over 60 GW Renewable Energy capacity constituting nearly 50% of its overall power generation capacity by 2032. “This is the second project awarded by NTPC to INOX Wind in the recent past, post a 150 MW order received last year. A few years ago, INOX Wind had also successfully executed a 50 MW turnkey wind project for NTPC in Gujarat,” said Kailash Tarachandani, CEO, Inox Wind. As part of the order, Inox Wind will supply and install DF 113/92 - 2.0 MW capacity wind turbine generators with 113 meters rotor diameter and 92 m hub height. Also read: Inox Wind wins 150 MW wind power order from NTPC Renewable Energy Inox Wind, Integrum ink pact for wind power projects

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement