MENA Renewable Energy Capacity Hits 30 GW in 2024
POWER & RENEWABLE ENERGY

MENA Renewable Energy Capacity Hits 30 GW in 2024

Renewable energy installations in the Middle East and North Africa (MENA) region reached 30.3 GW by the end of 2024, reflecting a 119% growth since 2020, according to the Renewables, Hydrogen, and Energy Storage Insights 2030 report by Dii Desert Energy. The United Arab Emirates (UAE) led the region with 6.3 GW, followed by Egypt at 4.6 GW and Saudi Arabia at 4.5 GW, with the Mohammed bin Rashid Al Maktoum Solar Park playing a major role in the UAE’s capacity. 

Solar power dominates 
MENA’s solar power capacity stood at 22.3 GW, with the UAE contributing 5 GW, including the 1.5 GW Mohammed bin Rashid Al Maktoum Solar Park and the 2 GW Al Dhafra project in Abu Dhabi — one of the world’s largest single-site solar installations. Industrial and commercial rooftop solar installations are expected to cross 600 MW by the end of 2024. Saudi Arabia leads ongoing solar development with large-scale projects like the 2,030 MW Al Shuaiba 2, while Oman plans to commission its 500 MW Manah 1 and 2 projects in 2025. 

Wind power expansion 
MENA’s wind power capacity reached 6.2 GW, with Egypt and Morocco each contributing over 2 GW. The UAE added 100 MW across four sites in 2023. Around 15 GW of wind projects are under development, including a 10 GW project in Egypt by UAE-based Masdar. 

Hydrogen projects surge 
The region saw a sharp increase in hydrogen projects, rising from 75 in 2023 to 117 in 2024, with 90% focused on green hydrogen. Egypt leads with 29 projects, and the region’s planned electrolyser capacity is set between 200 GW and 230 GW, with commissioning expected beyond 2030. 

Energy storage gains momentum 
MENA currently has nine operational energy storage projects totalling 13,000 MWh, mostly using battery energy storage systems (BESS). Eleven more projects, including two pumped hydro storage systems, will add 16,750 MWh. Saudi Arabia’s 500 MW/2,000 MWh Bisha BESS project was commissioned in January 2025, with more projects under tender across Saudi Arabia, the UAE, and Morocco, targeting a combined 25,000 MWh. 

2030 outlook 
The region’s renewable energy target for 2030 is set at 236 GW, with projections indicating 131 GW in a conservative scenario, 165 GW in a balanced scenario, and 290 GW in an optimistic scenario. Solar PV targets 115 GW, with the current project pipeline at 75 GW, while onshore wind aims for 75 GW, including two 10 GW mega projects in Egypt. 

Saudi Arabia is expected to contribute nearly half of the MENA target, with 100–130 GW of renewable capacity and a 45–50% share in the energy mix. Oman aims for 30% renewable capacity (3.8 GW) by 2028, and Egypt targets 45 GW of renewables, including 28 GW from wind by 2030. 

The region also aims to produce 10 million tons of green hydrogen annually by 2030, requiring an additional 128 GW of renewable energy capacity. With more than 110 hydrogen projects announced, MENA’s total renewable energy requirement for these projects exceeds 450 GW, though most completions are slated beyond 2030. 

In 2024, TotalEnergies and Aljomaih Energy & Water Company secured a 25-year power purchase agreement with the Saudi Power Procurement Company for the 300 MW Rabigh 2 solar project in Saudi Arabia, reflecting continued investment in the region’s renewable future. 

(Mercom)      

Renewable energy installations in the Middle East and North Africa (MENA) region reached 30.3 GW by the end of 2024, reflecting a 119% growth since 2020, according to the Renewables, Hydrogen, and Energy Storage Insights 2030 report by Dii Desert Energy. The United Arab Emirates (UAE) led the region with 6.3 GW, followed by Egypt at 4.6 GW and Saudi Arabia at 4.5 GW, with the Mohammed bin Rashid Al Maktoum Solar Park playing a major role in the UAE’s capacity. Solar power dominates MENA’s solar power capacity stood at 22.3 GW, with the UAE contributing 5 GW, including the 1.5 GW Mohammed bin Rashid Al Maktoum Solar Park and the 2 GW Al Dhafra project in Abu Dhabi — one of the world’s largest single-site solar installations. Industrial and commercial rooftop solar installations are expected to cross 600 MW by the end of 2024. Saudi Arabia leads ongoing solar development with large-scale projects like the 2,030 MW Al Shuaiba 2, while Oman plans to commission its 500 MW Manah 1 and 2 projects in 2025. Wind power expansion MENA’s wind power capacity reached 6.2 GW, with Egypt and Morocco each contributing over 2 GW. The UAE added 100 MW across four sites in 2023. Around 15 GW of wind projects are under development, including a 10 GW project in Egypt by UAE-based Masdar. Hydrogen projects surge The region saw a sharp increase in hydrogen projects, rising from 75 in 2023 to 117 in 2024, with 90% focused on green hydrogen. Egypt leads with 29 projects, and the region’s planned electrolyser capacity is set between 200 GW and 230 GW, with commissioning expected beyond 2030. Energy storage gains momentum MENA currently has nine operational energy storage projects totalling 13,000 MWh, mostly using battery energy storage systems (BESS). Eleven more projects, including two pumped hydro storage systems, will add 16,750 MWh. Saudi Arabia’s 500 MW/2,000 MWh Bisha BESS project was commissioned in January 2025, with more projects under tender across Saudi Arabia, the UAE, and Morocco, targeting a combined 25,000 MWh. 2030 outlook The region’s renewable energy target for 2030 is set at 236 GW, with projections indicating 131 GW in a conservative scenario, 165 GW in a balanced scenario, and 290 GW in an optimistic scenario. Solar PV targets 115 GW, with the current project pipeline at 75 GW, while onshore wind aims for 75 GW, including two 10 GW mega projects in Egypt. Saudi Arabia is expected to contribute nearly half of the MENA target, with 100–130 GW of renewable capacity and a 45–50% share in the energy mix. Oman aims for 30% renewable capacity (3.8 GW) by 2028, and Egypt targets 45 GW of renewables, including 28 GW from wind by 2030. The region also aims to produce 10 million tons of green hydrogen annually by 2030, requiring an additional 128 GW of renewable energy capacity. With more than 110 hydrogen projects announced, MENA’s total renewable energy requirement for these projects exceeds 450 GW, though most completions are slated beyond 2030. In 2024, TotalEnergies and Aljomaih Energy & Water Company secured a 25-year power purchase agreement with the Saudi Power Procurement Company for the 300 MW Rabigh 2 solar project in Saudi Arabia, reflecting continued investment in the region’s renewable future. (Mercom)      

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?