+
MPCB prepares carbon emission inventory of 43 cities
POWER & RENEWABLE ENERGY

MPCB prepares carbon emission inventory of 43 cities

Regarding the 2070 carbon-neutrality target by India at the CoP26 in Glasgow, the Maharashtra Pollution Control Board (MPCB) started the preparation for a carbon emission inventory of almost 43 cities in the state.

A greenhouse gas (GHG) inventory- the list of emission sources along with the associated emissions quantified utilising standardised methods, which helps the cities prioritise their pollution source which needs to be targeted. Therefore, decide the amount of action required and the manner in which the fund will be channelised. The project is aimed at lowering the carbon footprint in 43 AMRUT (Atal Mission for Rejuvenation and Urban Transformation) cities across the state.

The MPCB appointed an agency based in Pune for conducting a GHG emissions inventory of the 43 AMRUT cities, which includes the coastal city of Mumbai as well as industrial cities like Chandrapur and Pune being a part of the “race to zero” UN climate change campaign.

The GHG emission would be estimated based on the guidance offered in the GHG Protocol, the Global Protocol for Community-scale Greenhouse Gas Emission Inventories which is an accounting and reporting standard for cities.

The pilot project shall commence in five cities and this process would be completed within three months. The inventory will provide assistance to the authorities to prepare a plan for reduction of the carbon emission to zero.

Image Source

Regarding the 2070 carbon-neutrality target by India at the CoP26 in Glasgow, the Maharashtra Pollution Control Board (MPCB) started the preparation for a carbon emission inventory of almost 43 cities in the state. A greenhouse gas (GHG) inventory- the list of emission sources along with the associated emissions quantified utilising standardised methods, which helps the cities prioritise their pollution source which needs to be targeted. Therefore, decide the amount of action required and the manner in which the fund will be channelised. The project is aimed at lowering the carbon footprint in 43 AMRUT (Atal Mission for Rejuvenation and Urban Transformation) cities across the state. The MPCB appointed an agency based in Pune for conducting a GHG emissions inventory of the 43 AMRUT cities, which includes the coastal city of Mumbai as well as industrial cities like Chandrapur and Pune being a part of the “race to zero” UN climate change campaign. The GHG emission would be estimated based on the guidance offered in the GHG Protocol, the Global Protocol for Community-scale Greenhouse Gas Emission Inventories which is an accounting and reporting standard for cities. The pilot project shall commence in five cities and this process would be completed within three months. The inventory will provide assistance to the authorities to prepare a plan for reduction of the carbon emission to zero. Image Source

Next Story
Technology

Six ways a smarter workflow leads to faster, more accurate bids

In today’s fast-paced civil construction environment, estimators need more than just solid numbers. They need smart, streamlined processes. This article explores six key ways connected workflows can transform the estimated approach, help in minimising risk, move faster, and improve accuracy. By integrating tools, data, and teams, one can produce stronger bids with less rework, fewer surprises, and more confidence. As an estimator, the job goes beyond producing numbers. They are responsible for delivering bids that are fast, accurate, and built to win. In today’s civil construction ind..

Next Story
Real Estate

Experion Launches Women-Only Co-Living Project in Greater Noida

Experion, part of Singapore-based AT Capital Group, has launched its first co-living space under its managed rental housing brand, VLIV, in Greater Noida. The all-women residence features 730 twin-sharing beds with a strong focus on safety, comfort, and well-being. VLIV has committed a $300 million investment to create a structured, service-led rental housing ecosystem in India. The brand aims to scale up to 20,000 beds in the next few years, with a long-term target of 100,000 beds nationwide. “India’s rental housing is fragmented. VLIV is our way of building long-term, dependabl..

Next Story
Infrastructure Urban

Officine Maccaferri Acquires CPT to Bolster Tunnelling Tech

Ambienta’s platform company, Officine Maccaferri S.p.A., has acquired CPT Group, a leading Italian developer of robotic prefabrication systems and digital control technologies for mechanised tunnelling. The move positions Maccaferri as a global player in integrated tunnelling solutions, blending traditional and advanced mechanised systems. Based in Nova Milanese, CPT serves major global contractors across Europe, Southeast Asia, and Australia. The company offers robotic prefabrication (Robofactory), productivity-monitoring software for Tunnel Boring Machines (TBMs), and eco-designed spa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?