Noida's Power Department Ditches Flawed RF Surveys
POWER & RENEWABLE ENERGY

Noida's Power Department Ditches Flawed RF Surveys

The Noida Power Department (PVVNL) has embarked on a revolutionary initiative, replacing its previous radio frequency (RF) mode site survey for smart meters with a more accurate and efficient Geographic Information System (GIS)-based approach. This marks a significant step towards improving service delivery and addressing concerns in rural areas.

Phase One Targets Rural Outposts:

The first phase of the GIS survey is currently underway in the rural areas of Dadri, Jewar, and Dankaur, aiming for completion by March 2024. This prioritization of far-flung regions stems from the higher volume of complaints received from these areas.

Data-Driven Accuracy:

The new GIS survey leverages GPS technology to provide precise location data for each smart meter. This data will be integrated into the billing process at the Sector 58 data center, facilitating enhanced accountability, easier location identification, and streamlined fault rectification for consumers.

Enhanced Efficiency and Service:

"Once the survey is complete, GPS tagging will take another six months, after which our staff will no longer need to wander around to locate consumer addresses," explains Sanjeev Kumar Vaishya, Superintendent Engineer at PVVNL. "This initiative is a crucial step towards better maintenance and distribution of the power infrastructure through the power of technology."

Building a Smarter Future:

The adoption of GIS technology marks a significant advancement in Noida's smart meter implementation. By prioritizing data accuracy and service improvement, particularly in rural areas, the power department is paving the way for a more efficient and transparent electricity distribution system. This initiative holds the potential to set a benchmark for other regions, ultimately leading to a more reliable and responsive power grid for all.

The Noida Power Department (PVVNL) has embarked on a revolutionary initiative, replacing its previous radio frequency (RF) mode site survey for smart meters with a more accurate and efficient Geographic Information System (GIS)-based approach. This marks a significant step towards improving service delivery and addressing concerns in rural areas. Phase One Targets Rural Outposts: The first phase of the GIS survey is currently underway in the rural areas of Dadri, Jewar, and Dankaur, aiming for completion by March 2024. This prioritization of far-flung regions stems from the higher volume of complaints received from these areas. Data-Driven Accuracy: The new GIS survey leverages GPS technology to provide precise location data for each smart meter. This data will be integrated into the billing process at the Sector 58 data center, facilitating enhanced accountability, easier location identification, and streamlined fault rectification for consumers. Enhanced Efficiency and Service: Once the survey is complete, GPS tagging will take another six months, after which our staff will no longer need to wander around to locate consumer addresses, explains Sanjeev Kumar Vaishya, Superintendent Engineer at PVVNL. This initiative is a crucial step towards better maintenance and distribution of the power infrastructure through the power of technology. Building a Smarter Future: The adoption of GIS technology marks a significant advancement in Noida's smart meter implementation. By prioritizing data accuracy and service improvement, particularly in rural areas, the power department is paving the way for a more efficient and transparent electricity distribution system. This initiative holds the potential to set a benchmark for other regions, ultimately leading to a more reliable and responsive power grid for all.

Next Story
Infrastructure Urban

InsideFPV Delivers ₹10 Crore Kamikaze Drone Order Under MoD’s EPR Route

InsideFPV, a Surat-based drone technology manufacturer, has successfully executed a ₹10 crore defence contract to supply indigenous kamikaze drones under the Ministry of Defence’s Emergency Procurement Route (EPR). The company completed the delivery of hundreds of FPV kamikaze drone platforms within a rapid two-month timeframe, highlighting its ability to meet urgent military procurement timelines.The supply orders were fulfilled under the emergency procurement mechanism, which is aimed at fast-tracking acquisitions for immediate operational needs. InsideFPV’s quick execution reflects it..

Next Story
Infrastructure Energy

Vedanta Resources Secures Fitch Upgrade to ‘BB-’, Best Rating Since 2015

Vedanta Resources Limited (VRL), a global player in metals, oil & gas, critical minerals, power and technology, has received a credit rating upgrade from Fitch Ratings, marking its strongest bond rating in over a decade.Fitch has raised Vedanta Resources’ Long-Term Foreign-Currency Issuer Default Rating (IDR) to ‘BB-’ from ‘B+’, while maintaining a Stable Outlook. The agency also upgraded VRL’s senior unsecured rating, along with the ratings of US dollar-denominated bonds issued by Vedanta Resources Finance II Plc and guaranteed by VRL, to ‘BB-’.The upgrade represents Vedan..

Next Story
Real Estate

NAREDCO NextGen NCR Chapter Launched

The NAREDCO NextGen NCR Chapter was recently launched at Excelerate 2026 in Mumbai, marking a key step towards integrating emerging real estate leaders from the National Capital Region with the national platform. The initiative aims to promote sustainable and responsible urban development through collaboration and knowledge exchange.The event brought together young developers, entrepreneurs, and professionals from across NCR, including Noida, Gurugram, Ghaziabad, Faridabad, Bhiwadi, and Meerut. Discussions focused on urban development, finance, sustainability, innovation, and policy, emphasisi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement