Noida's Power Department Ditches Flawed RF Surveys
POWER & RENEWABLE ENERGY

Noida's Power Department Ditches Flawed RF Surveys

The Noida Power Department (PVVNL) has embarked on a revolutionary initiative, replacing its previous radio frequency (RF) mode site survey for smart meters with a more accurate and efficient Geographic Information System (GIS)-based approach. This marks a significant step towards improving service delivery and addressing concerns in rural areas.

Phase One Targets Rural Outposts:

The first phase of the GIS survey is currently underway in the rural areas of Dadri, Jewar, and Dankaur, aiming for completion by March 2024. This prioritization of far-flung regions stems from the higher volume of complaints received from these areas.

Data-Driven Accuracy:

The new GIS survey leverages GPS technology to provide precise location data for each smart meter. This data will be integrated into the billing process at the Sector 58 data center, facilitating enhanced accountability, easier location identification, and streamlined fault rectification for consumers.

Enhanced Efficiency and Service:

"Once the survey is complete, GPS tagging will take another six months, after which our staff will no longer need to wander around to locate consumer addresses," explains Sanjeev Kumar Vaishya, Superintendent Engineer at PVVNL. "This initiative is a crucial step towards better maintenance and distribution of the power infrastructure through the power of technology."

Building a Smarter Future:

The adoption of GIS technology marks a significant advancement in Noida's smart meter implementation. By prioritizing data accuracy and service improvement, particularly in rural areas, the power department is paving the way for a more efficient and transparent electricity distribution system. This initiative holds the potential to set a benchmark for other regions, ultimately leading to a more reliable and responsive power grid for all.

The Noida Power Department (PVVNL) has embarked on a revolutionary initiative, replacing its previous radio frequency (RF) mode site survey for smart meters with a more accurate and efficient Geographic Information System (GIS)-based approach. This marks a significant step towards improving service delivery and addressing concerns in rural areas. Phase One Targets Rural Outposts: The first phase of the GIS survey is currently underway in the rural areas of Dadri, Jewar, and Dankaur, aiming for completion by March 2024. This prioritization of far-flung regions stems from the higher volume of complaints received from these areas. Data-Driven Accuracy: The new GIS survey leverages GPS technology to provide precise location data for each smart meter. This data will be integrated into the billing process at the Sector 58 data center, facilitating enhanced accountability, easier location identification, and streamlined fault rectification for consumers. Enhanced Efficiency and Service: Once the survey is complete, GPS tagging will take another six months, after which our staff will no longer need to wander around to locate consumer addresses, explains Sanjeev Kumar Vaishya, Superintendent Engineer at PVVNL. This initiative is a crucial step towards better maintenance and distribution of the power infrastructure through the power of technology. Building a Smarter Future: The adoption of GIS technology marks a significant advancement in Noida's smart meter implementation. By prioritizing data accuracy and service improvement, particularly in rural areas, the power department is paving the way for a more efficient and transparent electricity distribution system. This initiative holds the potential to set a benchmark for other regions, ultimately leading to a more reliable and responsive power grid for all.

Next Story
Infrastructure Transport

Shivraj Chouhan Launches PMGSY IV and Announces Package for Madhya Pradesh

Union Minister Shivraj Singh Chouhan launched the Pradhan Mantri Gram Sadak Yojana (PMGSY) IV at Bhairunda in Sehore district during the 25 year celebrations and announced a development package for Madhya Pradesh. The programme was organised by the Union Ministry of Rural Development and attended by Chief Minister Dr Mohan Yadav, ministers of state, state ministers, legislators and senior officials from the centre and the state. The minister said the central government under the Prime Minister is committed to strengthening rural livelihoods through improved connectivity, housing and women's in..

Next Story
Infrastructure Urban

DMR Engineering Reports FY 25-26 Financial Results

DMR Engineering reported its half year results for the financial year ended 31 March 2026 and published full year figures on a standalone basis. Standalone revenue from operations decreased by 2.01 per cent year-over-year to Rs 102.58 million (mn), while profit after tax declined by 43.94 per cent to nine point five six mn, leaving a profit after tax margin of nine point zero five per cent. Earnings per share stood at Rs zero point nine two, a fall of 44.71 per cent year-over-year. The company attributed part of the decline to one-off provisioning for bad debts and additional financing charges..

Next Story
Infrastructure Urban

Atlanta Electricals Posts Strong FY26 Growth And Debt Free Finish

Atlanta Electricals reported audited consolidated results for the quarter and year ended 31 March 2026. The company recorded significant year-on-year revenue growth driven by capacity ramp-up at new facilities and higher utilisation at legacy plants. The announcement summarised operating improvements and strategic milestones achieved during the year. For Q4 the company reported revenue of Rs 7.48 bn and for FY26 revenue of Rs 18.52 bn, representing robust growth versus the prior year. EBITDA in Q4 was Rs. 1.49 bn and Rs. 3.44 bn for the full year, with margins expanding to 20 per cent in the q..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement