+
Pahal Solar Secures 112 MW Order, Expands to 4.4 GW Capacity
POWER & RENEWABLE ENERGY

Pahal Solar Secures 112 MW Order, Expands to 4.4 GW Capacity

On the opening day of the Renewable Energy India (REI) Expo 2025, Pahal Solar announced a 112 MW order for its 600 Wp Non-Domestic Content Requirement (NDCR) solar modules from a reputed client based in South India. The company said the project will be powered by AI-enabled manufacturing and advanced TOPCon bifacial panels, showcasing the next generation of intelligent solar production.

Pahal Solar’s upcoming facility will integrate AI-based analytics and precision systems to enhance quality control and operational efficiency. The company aims to achieve 2 gigawatts (GW) of module production within the current financial year, which will take its total installed capacity to 4.4 GW. This expansion consolidates Pahal Solar’s position as a national leader in solar module and component manufacturing.

Since the introduction of its 570 Wp TOPCon solar modules that meet the Ministry of New and Renewable Energy’s (MNRE) Domestic Content Requirement (DCR), Pahal Solar has advanced steadily in the renewable sector. These high-efficiency panels were launched to meet the growing demand for premium rooftop solar solutions, especially in the residential market.

Under the latest Approved List of Models and Manufacturers (ALMM), the company’s certified manufacturing capacity increased by 264 MW to reach 828 MW, reinforcing its standing among India’s leading solar module producers.

Recently, Pahal Solar held a bhoomi poojan (ground-breaking ceremony) for the expansion of its 2 GW solar cell manufacturing facility and 2 GW aluminium frame plant in Surat, Gujarat. The expansion marks a significant milestone in the company’s commitment to self-reliance and technological advancement in India’s renewable energy sector.

On the opening day of the Renewable Energy India (REI) Expo 2025, Pahal Solar announced a 112 MW order for its 600 Wp Non-Domestic Content Requirement (NDCR) solar modules from a reputed client based in South India. The company said the project will be powered by AI-enabled manufacturing and advanced TOPCon bifacial panels, showcasing the next generation of intelligent solar production. Pahal Solar’s upcoming facility will integrate AI-based analytics and precision systems to enhance quality control and operational efficiency. The company aims to achieve 2 gigawatts (GW) of module production within the current financial year, which will take its total installed capacity to 4.4 GW. This expansion consolidates Pahal Solar’s position as a national leader in solar module and component manufacturing. Since the introduction of its 570 Wp TOPCon solar modules that meet the Ministry of New and Renewable Energy’s (MNRE) Domestic Content Requirement (DCR), Pahal Solar has advanced steadily in the renewable sector. These high-efficiency panels were launched to meet the growing demand for premium rooftop solar solutions, especially in the residential market. Under the latest Approved List of Models and Manufacturers (ALMM), the company’s certified manufacturing capacity increased by 264 MW to reach 828 MW, reinforcing its standing among India’s leading solar module producers. Recently, Pahal Solar held a bhoomi poojan (ground-breaking ceremony) for the expansion of its 2 GW solar cell manufacturing facility and 2 GW aluminium frame plant in Surat, Gujarat. The expansion marks a significant milestone in the company’s commitment to self-reliance and technological advancement in India’s renewable energy sector.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App