PM Surya Ghar Scheme Set to Surpass 10 Years of Solar Growth
POWER & RENEWABLE ENERGY

PM Surya Ghar Scheme Set to Surpass 10 Years of Solar Growth

The PM Surya Ghar Muft Bijli Yojana has achieved a remarkable milestone, surpassing 6.85 lakh solar installations within a year and poised to exceed a decade's worth of solar growth. The scheme, launched in February 2024, has already achieved 86 percent of the solar installations made in the last ten years.

The 3-5 kW segment accounted for the majority of installations, at 77 percent, while 14 percent of installations were in the 5kW+ category. Gujarat led the charge with 2,86,545 installations, followed by Maharashtra with 1,26,344, Uttar Pradesh with 53,423, and Kerala.

The scheme, which now has 1.45 crore registrations, aims to provide solar power to 1 crore households by 2027. Prime Minister Narendra Modi introduced the scheme to achieve 1 crore rooftop solar installations in residential areas, with an allocated budget of Rs 75,021 crore.

The initiative has gained momentum in states like Tripura, Jharkhand, Arunachal Pradesh, and Manipur. The government is collaborating with Urban Local Bodies, Panchayats, and various stakeholders to promote rooftop solar systems. The scheme is expected to reduce electricity costs by Rs 75,000 crore annually and generate significant employment opportunities while lowering power bills for participants.

The PM Surya Ghar Muft Bijli Yojana has achieved a remarkable milestone, surpassing 6.85 lakh solar installations within a year and poised to exceed a decade's worth of solar growth. The scheme, launched in February 2024, has already achieved 86 percent of the solar installations made in the last ten years. The 3-5 kW segment accounted for the majority of installations, at 77 percent, while 14 percent of installations were in the 5kW+ category. Gujarat led the charge with 2,86,545 installations, followed by Maharashtra with 1,26,344, Uttar Pradesh with 53,423, and Kerala. The scheme, which now has 1.45 crore registrations, aims to provide solar power to 1 crore households by 2027. Prime Minister Narendra Modi introduced the scheme to achieve 1 crore rooftop solar installations in residential areas, with an allocated budget of Rs 75,021 crore. The initiative has gained momentum in states like Tripura, Jharkhand, Arunachal Pradesh, and Manipur. The government is collaborating with Urban Local Bodies, Panchayats, and various stakeholders to promote rooftop solar systems. The scheme is expected to reduce electricity costs by Rs 75,000 crore annually and generate significant employment opportunities while lowering power bills for participants.

Next Story
Infrastructure Energy

Mizoram To Build Rs 139 Billion Pumped Storage Power Plant

Mizoram Chief Minister Lalduhoma on Friday announced plans to construct a 2,400 MW pumped storage hydroelectric power plant in Hnahthial district, marking a major step towards achieving energy self-sufficiency in the state. Addressing the Mizo Students’ Union general conference in Hnahthial town, the Chief Minister said the plant would be developed across the Darzo Nallah, a tributary of the Tuipui river. Once operational, the project is expected to play a pivotal role in meeting Mizoram’s rising electricity demand and reducing dependence on imported power. Officials from the State Power..

Next Story
Infrastructure Energy

Centre Plans Nationwide Opening Of Power Retail Market

India is preparing to open up its retail electricity market to private companies nationwide, effectively ending the long-standing monopoly of state-run power distributors in most regions, according to a draft bill released by the Union Power Ministry on Friday. The move will enable major private sector players — including Adani Enterprises, Tata Power, Torrent Power, and CESC — to expand their presence across the country’s electricity distribution landscape. A similar reform attempt in 2022 had faced strong opposition from state-run distribution companies (discoms), which currently dom..

Next Story
Infrastructure Energy

CEA Sets 100 GW Nuclear Target For India By 2047

In a landmark step marking its 52nd Foundation Day, the Central Electricity Authority (CEA) unveiled an ambitious roadmap to develop 100 gigawatts (GW) of nuclear power capacity by 2047, aligning with India’s long-term Net-Zero commitment and energy security objectives. The event, held at the Central Water Commission auditorium in New Delhi’s R.K. Puram, was attended by Pankaj Agarwal, Secretary, Ministry of Power, who served as the Chief Guest. The roadmap sets out a detailed plan to expand India’s nuclear capacity from its current level of approximately 8,180 MW as of early 2025, outl..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?