+
Punjab DGP inaugurates solar power plants at 13 police stations
POWER & RENEWABLE ENERGY

Punjab DGP inaugurates solar power plants at 13 police stations

Punjab DGP Gaurav Yadav inaugurated the rooftop solar power plants installed at 13 police stations in Ludhiana as part of a sustainable initiative. The police stations covered under this project include Jamalpur, Moti Nagar, PAU, Division No 1, 2, 5, 6 & 8, Dugri, Sahnewal, Shimlapuri, Sadar, and Model Town. These solar plants, with a total capacity of 120 kW, were installed as part of the Corporate Social Responsibility efforts under the 'Ujaala-Ek Changi Shuruwat' project.

Yadav highlighted the environmental benefits of these solar power plants, emphasizing that they would contribute to an annual reduction of 180 metric tonnes of carbon emissions. Additionally, the installations would result in significant cost savings, amounting to Rs 1.2 million per year, by reducing hefty electricity bills. The 120 kW solar power plants are equivalent to planting approximately 5500 teak trees, he added.

The DGP also mentioned that these solar plants were established under the Net Metering Policy of the Punjab State Power Corporation Limited (PSPCL). This policy allows eligible consumers to install rooftop solar photovoltaic systems and offset their electricity consumption by generating power from the solar panels. Through net metering, consumers are billed for the net amount of electricity consumed, considering the difference between the electricity generated by the solar panels and the electricity consumed from the grid.

Yadav expressed optimism that the installation of solar power plants would transform the police stations into 'Green Police Stations' and inspire others to adopt renewable energy sources for a cleaner and greener Punjab. He urged the Ludhiana police commissioner to extend this project to cover all police stations in the city.

Punjab DGP Gaurav Yadav inaugurated the rooftop solar power plants installed at 13 police stations in Ludhiana as part of a sustainable initiative. The police stations covered under this project include Jamalpur, Moti Nagar, PAU, Division No 1, 2, 5, 6 & 8, Dugri, Sahnewal, Shimlapuri, Sadar, and Model Town. These solar plants, with a total capacity of 120 kW, were installed as part of the Corporate Social Responsibility efforts under the 'Ujaala-Ek Changi Shuruwat' project. Yadav highlighted the environmental benefits of these solar power plants, emphasizing that they would contribute to an annual reduction of 180 metric tonnes of carbon emissions. Additionally, the installations would result in significant cost savings, amounting to Rs 1.2 million per year, by reducing hefty electricity bills. The 120 kW solar power plants are equivalent to planting approximately 5500 teak trees, he added. The DGP also mentioned that these solar plants were established under the Net Metering Policy of the Punjab State Power Corporation Limited (PSPCL). This policy allows eligible consumers to install rooftop solar photovoltaic systems and offset their electricity consumption by generating power from the solar panels. Through net metering, consumers are billed for the net amount of electricity consumed, considering the difference between the electricity generated by the solar panels and the electricity consumed from the grid. Yadav expressed optimism that the installation of solar power plants would transform the police stations into 'Green Police Stations' and inspire others to adopt renewable energy sources for a cleaner and greener Punjab. He urged the Ludhiana police commissioner to extend this project to cover all police stations in the city.

Related Stories

Gold Stories

Next Story
Real Estate

We engineer the way architecture gets built

DALBIR SINGH, Founder, HAACE, on the company’s bespoke approach to translating ambitious architecture into precisely engineered and executed structures.What does bespoke construction mean to HAACE, and how is it different from conventional contracting?For HAACE, bespoke construction means choosing the construction methodology around the design rather than forcing the design into a standard template. Every project is studied around its architectural intent, structural requirements and execution challenges. We deliberately take on a limited number of projects because this approach demands atte..

Next Story
Real Estate

Kamdhenu Realities acquires 4-acre Navi Mumbai land parcel

Kamdhenu Realities has acquired a 4-acre land parcel from RPG Life Sciences on Thane-Belapur Road for approximately Rs 1.5 billion, expanding its commercial real estate portfolio in Navi Mumbai.The parcel has a total developable potential of 1.8 million sq ft, on which Kamdhenu plans to develop a destination-scale commercial and lifestyle ecosystem. The proposed development will combine corporate office suites with high-street retail, F&B outlets, double-height lobbies, business infrastructure and lifestyle amenities.Located close to IKEA and opposite the upcoming Pawane Railway Station, t..

Next Story
Infrastructure Transport

97 Per Cent Of Rongjeng-Mangsang-Adokgre Road Nears Completion

Deputy Chief Minister in-charge of public works Prestone Tynsong said in Shillong on 26 August that 97 per cent physical progress had been achieved on the ongoing Rongjeng-Mangsang-Adokgre road being constructed under the Non-Lapsable Central Pool of Resources (NLCPR). He noted the project was sanctioned in 2017 and that the stipulated time for completion had been 24 months from issue of the final work order. The deputy chief minister informed the assembly that the government had decided to include the remaining work under a World Bank project. In reply to a query from Rongjeng MLA Jim M Sangm..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code