Reliance Nu Suntech Signs 25-Year PPA with SECI for Solar Power
POWER & RENEWABLE ENERGY

Reliance Nu Suntech Signs 25-Year PPA with SECI for Solar Power

Reliance Power subsidiary, Reliance NU Suntech (Reliance NU Suntech), has signed a landmark 25-year long-term Power Purchase Agreement (PPA) with the Solar Energy Corporation of India (SECI), a leading Navratna Central Public Sector Enterprise. This strategic agreement represents one of the most significant long-term power offtake arrangements in India to date, marking a major milestone in the nation’s transition to clean energy.

Reliance Power subsidiary, Reliance NU Suntech is set to develop and commission Asia’s largest single-location integrated solar and battery energy storage system (BESS) project within the next 24 months. The project entails a capital investment of up to Rs 100 billion, representing a significant strategic commitment to operational scalability and long-term value creation. It aligns with the nation’s ambitious renewable energy targets and further strengthens Reliance Power’s position as a key player in India’s green energy ecosystem.

Reliance NU Suntech’s signed Power Purchase Agreement with SECI comprises supply of 930 MW of solar power integrated with 465 MW/1,860 MWh Battery Energy Storage System (BESS), at a competitive fixed tariff of Rs 3.53 per kWh. To achieve the contracted capacity of 930 MW, the project will deploy more than 1,700 MWp of installed solar generation capacity. This landmark agreement represents a significant step in Reliance Power’s long-term strategy to lead India’s transition to sustainable, low-cost energy solutions.

In December 2024, Reliance Power subsidiary, Reliance NU Suntech secured the largest award in SECI’s Tranche XVII auction, winning an allocation of 930 MW of solar power capacity along with a 465 MW/1,860 MWh Battery Energy Storage System. The allocation was awarded through a tariff-based competitive bidding process, which saw participation from 5 leading energy companies competing for a total of 2,000 MW of Inter-State Transmission System (ISTS)-connected solar projects and 1,000 MW/4,000 MWh of BESS capacity. This highlights Reliance NU Suntech’s strategic commitment to executing large-scale, integrated clean energy projects.

Reliance Power have successfully submitted a Performance Bank Guarantee (PBG) amounting to ?378 crore to the Solar Energy Corporation of India (SECI). The entire bidding process – from the reverse auction to the issuance of the Letter of Award (LoA), and culminating in the signing of the Power Purchase Agreement (PPA) – was completed in less than 5 months. This swift and seamless execution underscores the company’s operational excellence, industry leadership, proven performance over past 10 years, and unwavering commitment to accelerating India’s energy transition.

Reliance Power subsidiary, Reliance NU Suntech (Reliance NU Suntech), has signed a landmark 25-year long-term Power Purchase Agreement (PPA) with the Solar Energy Corporation of India (SECI), a leading Navratna Central Public Sector Enterprise. This strategic agreement represents one of the most significant long-term power offtake arrangements in India to date, marking a major milestone in the nation’s transition to clean energy. Reliance Power subsidiary, Reliance NU Suntech is set to develop and commission Asia’s largest single-location integrated solar and battery energy storage system (BESS) project within the next 24 months. The project entails a capital investment of up to Rs 100 billion, representing a significant strategic commitment to operational scalability and long-term value creation. It aligns with the nation’s ambitious renewable energy targets and further strengthens Reliance Power’s position as a key player in India’s green energy ecosystem. Reliance NU Suntech’s signed Power Purchase Agreement with SECI comprises supply of 930 MW of solar power integrated with 465 MW/1,860 MWh Battery Energy Storage System (BESS), at a competitive fixed tariff of Rs 3.53 per kWh. To achieve the contracted capacity of 930 MW, the project will deploy more than 1,700 MWp of installed solar generation capacity. This landmark agreement represents a significant step in Reliance Power’s long-term strategy to lead India’s transition to sustainable, low-cost energy solutions. In December 2024, Reliance Power subsidiary, Reliance NU Suntech secured the largest award in SECI’s Tranche XVII auction, winning an allocation of 930 MW of solar power capacity along with a 465 MW/1,860 MWh Battery Energy Storage System. The allocation was awarded through a tariff-based competitive bidding process, which saw participation from 5 leading energy companies competing for a total of 2,000 MW of Inter-State Transmission System (ISTS)-connected solar projects and 1,000 MW/4,000 MWh of BESS capacity. This highlights Reliance NU Suntech’s strategic commitment to executing large-scale, integrated clean energy projects. Reliance Power have successfully submitted a Performance Bank Guarantee (PBG) amounting to ?378 crore to the Solar Energy Corporation of India (SECI). The entire bidding process – from the reverse auction to the issuance of the Letter of Award (LoA), and culminating in the signing of the Power Purchase Agreement (PPA) – was completed in less than 5 months. This swift and seamless execution underscores the company’s operational excellence, industry leadership, proven performance over past 10 years, and unwavering commitment to accelerating India’s energy transition.

Next Story
Infrastructure Energy

Adani Green Adds 113 MW At Khavda, Capacity Hits 16.6 GW

Adani Green Energy Limited (AGEL) announced that it has operationalised 112.5 megawatts (MW) of renewable power projects at Khavda in Gujarat, raising its total generation capacity to 16,598.6 MW.The company said in an exchange filing that its step-down subsidiary, Adani Renewable Energy Fifty Six Limited, has commissioned a solar project of 87.5 MW, while Adani Green Energy Twenty Five B Limited has operationalised a 25 MW hybrid project at the same site.Following the required regulatory clearances, the company began power generation on 30 September 2025.With these additions, AGEL’s total o..

Next Story
Infrastructure Energy

Centre Sets National Standards For Renewable Power Use

The Central Government, in consultation with the Bureau of Energy Efficiency (BEE), has issued a new notification establishing minimum renewable energy consumption standards for designated power users across India. This framework replaces the 2023 notification and aims to accelerate the adoption of green electricity among consumers nationwide.Titled the Renewable Consumption Obligation (RCO), the regulation mandates that designated consumers — including electricity distribution licensees, open access consumers, and captive power users — must ensure a specified share of their total electric..

Next Story
Infrastructure Energy

Tata Power Signs Rs 12 Billion PPA For 80 MW Green Project

Tata Power Company announced that its renewable arm, Tata Power Renewable Energy Limited (TPREL), has signed a Power Purchase Agreement (PPA) with Tata Power Mumbai Distribution for an 80 MW Firm and Dispatchable Renewable Energy (FDRE) project.The Rs 12 billion project will combine solar, wind, and battery storage systems to provide reliable renewable power during peak demand periods, strengthening grid stability and meeting the growing energy needs of Mumbai.Scheduled for completion within 24 months, the facility is expected to generate around 315 million units (MUs) of clean electricity ann..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?