+
SECI announces 800 MW Renewable RTC Power Procurement Tender
POWER & RENEWABLE ENERGY

SECI announces 800 MW Renewable RTC Power Procurement Tender

The Solar Energy Corporation of India (SECI) has announced its plans to procure Round-the-Clock (RTC) power from renewable energy projects with a total capacity of 800 MW. The primary focus of this initiative is to cater to the electricity needs of Haryana's distribution companies (discoms). These projects will be established under the "Build Own Operate" (B-O-O) model. SECI will enter into Power Purchase Agreements (PPAs) with successful bidders selected through a Request for Selection (RfS) process. The selected bidders will be responsible for supplying power for a period of 25 years, based on the terms, conditions, and provisions outlined in the RfS.

SECI is currently preparing to launch the RfS for RTC tranche IV, inviting interested project developers to participate in the bidding process for this capacity. SECI's Notice Inviting Tender (NIT) specifies that a solar photovoltaic (PV) capacity of up to 1200 MWp will be established in Haryana, connected to the State Transmission Utility (STU). The wind capacity, on the other hand, will be established on a pan-India basis and connected to the Inter-State Transmission System (ISTS). Additionally, all projects are required to include an Energy Storage System (ESS) component, either in a co-located or standalone configuration.

The tender will be conducted following the standard bidding guidelines for tariff-based competitive bidding processes for the procurement of reliable and dispatchable power from grid-connected renewable energy projects with Energy Storage Systems, as issued by the government.

The Solar Energy Corporation of India (SECI) has announced its plans to procure Round-the-Clock (RTC) power from renewable energy projects with a total capacity of 800 MW. The primary focus of this initiative is to cater to the electricity needs of Haryana's distribution companies (discoms). These projects will be established under the Build Own Operate (B-O-O) model. SECI will enter into Power Purchase Agreements (PPAs) with successful bidders selected through a Request for Selection (RfS) process. The selected bidders will be responsible for supplying power for a period of 25 years, based on the terms, conditions, and provisions outlined in the RfS.SECI is currently preparing to launch the RfS for RTC tranche IV, inviting interested project developers to participate in the bidding process for this capacity. SECI's Notice Inviting Tender (NIT) specifies that a solar photovoltaic (PV) capacity of up to 1200 MWp will be established in Haryana, connected to the State Transmission Utility (STU). The wind capacity, on the other hand, will be established on a pan-India basis and connected to the Inter-State Transmission System (ISTS). Additionally, all projects are required to include an Energy Storage System (ESS) component, either in a co-located or standalone configuration.The tender will be conducted following the standard bidding guidelines for tariff-based competitive bidding processes for the procurement of reliable and dispatchable power from grid-connected renewable energy projects with Energy Storage Systems, as issued by the government.

Next Story
Infrastructure Energy

REC Hosts 56th AGM, Highlights Record Growth and Sustainability

REC Limited conducted its 56th Annual General Meeting (AGM) today through video conferencing, chaired by Jitendra Srivastava, Chairman & Managing Director. The meeting highlighted the company’s record operational and financial performance during the year, along with its strong focus on sustainability and ESG-led initiatives.Jitendra Srivastava, Chairman & Managing Director, in his address noted that REC achieved significant milestones during the year, strengthening its position as a performance-driven public financial institution. Loan sanctions stood at Rs 3.37 trillion, with disbur..

Next Story
Infrastructure Transport

ADGBR Reviews Road Projects under Project Vartak

Additional Director General Border Roads (ADGBR) Jitendra Prasad conducted a four-day review of ongoing road and bridge construction works under Project Vartak in the area of responsibility (AoR) of the 42 Border Roads Task Force (BRTF) from 19 to 22 August.Prasad inspected key infrastructure projects including the Balipara–Charduar–Tawang (BCT) road, Sela–Chabrela–Banga Janga Gonpa road, Banga Janga Gonpa–Lagamche GG road, the Sela tunnel, and multiple roads in the Nelya sector.At various construction sites, project officials briefed him on project scope, progress, timelines, and op..

Next Story
Infrastructure Transport

Nitin Gadkari Launches Three Highway Projects in Madhya Pradesh

Union Minister for Road Transport and Highways, Nitin Gadkari, laid the foundation stone for three National Highway (NH) projects in Madhya Pradesh on 24 August. According to the Ministry of Road Transport and Highways (MoRTH), the projects are designed to reduce travel time, ease congestion, enhance road safety, and improve connectivity across key corridors.The first project covers the four-laning of the 17.87 km Amazhar–Barela stretch, completing the Jabalpur Ring Road. The upgrade will divert heavy vehicles away from the city, reduce accident risks, and ensure smoother connectivity from A..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?