Sterlite Power secures Rs 14 bn orders for Power Transmission Solutions
POWER & RENEWABLE ENERGY

Sterlite Power secures Rs 14 bn orders for Power Transmission Solutions

Sterlite Power, a leading developer of power transmission solutions, has recently announced the successful acquisition of multiple new orders totalling Rs 14 billion for its solutions business. These orders were secured during the final quarter of the 2022-23 fiscal years and encompassed both domestic and international markets. With these new additions, the company's order book for the business unit has now reached a substantial Rs 52 billion for the entire fiscal year, highlighting its robust growth.

In a statement, Sterlite Power emphasised that these new orders further solidify its position in the power transmission industry. The company's solutions are specifically designed to address the challenges posed by urban development, evolving demographics, and the growing prominence of renewable energy in the Indian power ecosystem.

Among the notable projects, Sterlite Power has received a significant order from Powergrid to upgrade and enhance its 400 kV Jharsuguda/Sundargarh - Rourkela transmission line. This project is part of the larger Eastern Region Expansion Scheme – XXIX, and Sterlite Power will utilise its reconductoring solution to complete the upgrade.

Additionally, the company has been entrusted with the construction of 220 kV double circuit transmission lines for Serentica Renewables, the renewable energy arm of the Group. These transmission corridors will facilitate the efficient evacuation of renewable energy from upcoming solar and wind parks in Rajasthan and Karnataka to the national grid.

In the realm of product manufacturing, Sterlite Power has secured major orders for conductors and Optical Ground Wire (OPGW) from customers in the SAARC region. Notably, the company has been selected for the Power Grid Corporation of Bangladesh's river crossing project, awarded by Transrail. Moreover, Sterlite Power has received repeat orders from customers in the USA and the LATAM region, demonstrating its reputation for delivering high-quality products and services.

Overall, these new orders and projects solidify Sterlite Power's position as a leading power transmission developer, showcasing its commitment to providing innovative solutions for the evolving needs of the power industry. 

Sterlite Power, a leading developer of power transmission solutions, has recently announced the successful acquisition of multiple new orders totalling Rs 14 billion for its solutions business. These orders were secured during the final quarter of the 2022-23 fiscal years and encompassed both domestic and international markets. With these new additions, the company's order book for the business unit has now reached a substantial Rs 52 billion for the entire fiscal year, highlighting its robust growth.In a statement, Sterlite Power emphasised that these new orders further solidify its position in the power transmission industry. The company's solutions are specifically designed to address the challenges posed by urban development, evolving demographics, and the growing prominence of renewable energy in the Indian power ecosystem.Among the notable projects, Sterlite Power has received a significant order from Powergrid to upgrade and enhance its 400 kV Jharsuguda/Sundargarh - Rourkela transmission line. This project is part of the larger Eastern Region Expansion Scheme – XXIX, and Sterlite Power will utilise its reconductoring solution to complete the upgrade.Additionally, the company has been entrusted with the construction of 220 kV double circuit transmission lines for Serentica Renewables, the renewable energy arm of the Group. These transmission corridors will facilitate the efficient evacuation of renewable energy from upcoming solar and wind parks in Rajasthan and Karnataka to the national grid.In the realm of product manufacturing, Sterlite Power has secured major orders for conductors and Optical Ground Wire (OPGW) from customers in the SAARC region. Notably, the company has been selected for the Power Grid Corporation of Bangladesh's river crossing project, awarded by Transrail. Moreover, Sterlite Power has received repeat orders from customers in the USA and the LATAM region, demonstrating its reputation for delivering high-quality products and services.Overall, these new orders and projects solidify Sterlite Power's position as a leading power transmission developer, showcasing its commitment to providing innovative solutions for the evolving needs of the power industry. 

Next Story
Infrastructure Transport

JNPA Becomes First Indian Port to Cross 10 Million TEU Capacity

The Jawaharlal Nehru Port Authority (JNPA), located at Uran in Navi Mumbai, has become the first port in India to achieve over 10 million TEUs (twenty-foot equivalent units) in container handling capacity.With the recent expansion, the port now operates five container terminals with a combined capacity of 10.4 million TEUs, alongside two liquid and two general cargo terminals.Handling more than half of India’s container traffic, JNPA processed 7.05 million TEUs in 2024 and has moved 15.39 million tonnes of containers and 16.64 million tonnes of total cargo in the first two months of FY 2025â..

Next Story
Infrastructure Transport

Nod for Rs. 36.26 billion Expansion of Pune Metro Line 2

The Union Cabinet has approved the Rs.36.26 billion expansion of Pune Metro Line 2, adding 12.75 km of track and 13 new stations to improve east–west connectivity across the city.The project aims to link Pune’s urban core with rapidly growing suburbs, supporting the city’s rising demand for efficient and sustainable transport solutions. This expansion is part of Corridor 2 of the Pune Metro and includes two key routes: Vanaz to Chandani Chowk (Corridor 2A) and Ramwadi to Wagholi/Vitthalwadi (Corridor 2B).It will connect residential, IT, and educational hubs in areas such as Bavdhan, Koth..

Next Story
Infrastructure Transport

Assembly begins for ‘Nayak’ TBM on Thane– Borivali Twin Tunnel Project

The assembly of ‘Nayak’, the first of four Tunnel Boring Machines (TBMs) for the Thane–Borivali Twin Tube Tunnel Project, has commenced at the Thane site. Built by German firm Herrenknecht AG and deployed by Megha Engineering & Infrastructure (MEIL), the TBM marks a key milestone in Mumbai’s ambitious 11.8-km underground road corridor beneath Sanjay Gandhi National Park.The twin tunnels will reduce the Thane–Borivali travel distance by 12 km and decongest Thane Ghodbunder Road. ‘Nayak’, with a 13.2-metre diameter, is designed to bore through challenging geological conditions ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?