Tata Power to set up solar plant at Solapur site to power CEAT facility
POWER & RENEWABLE ENERGY

Tata Power to set up solar plant at Solapur site to power CEAT facility

Tata Power will set up a 10 MW captive solar plant at its Solapur facility, which will power CEAT’s tyre manufacturing facility in Bhandup, Mumbai.

CEAT informed the media that Tata Power has formed a special purpose vehicle (SPV)—TP Akkalkot Renewable Ltd—which will take up the construction, operation and maintenance of the solar power plant.

CEAT will own a 26% stake in the SPV, while Tata power will hold 74%, according to the captive generation rules, it said.

The company said that the power produced would be utilised for captive consumption by CEAT's Bhandup plant. Additionally, the plant is anticipated to generate about 21 million units of energy per year and will yearly offset about 17.43 million kg of carbon dioxide.

Kumar Subbiah, Chief Financial Officer, CEAT, told the media that the partnership with Tata Power for setting up a solar power generation plant in Maharashtra implies their continued commitment towards a shift to sustainable energy.

The company said that the installation of the 10 MW captive solar plant will not only lessen CEAT's dependency on non-renewable energy but will also be a notable milestone in the company's aim towards carbon neutrality.

Image Source


Also read: Azure Power, Tata Power win wind-solar hybrid auction in Maharashtra

Also read: ACME, ReNew win 500 MW solar project in Maharashtra

Tata Power will set up a 10 MW captive solar plant at its Solapur facility, which will power CEAT’s tyre manufacturing facility in Bhandup, Mumbai. CEAT informed the media that Tata Power has formed a special purpose vehicle (SPV)—TP Akkalkot Renewable Ltd—which will take up the construction, operation and maintenance of the solar power plant. CEAT will own a 26% stake in the SPV, while Tata power will hold 74%, according to the captive generation rules, it said. The company said that the power produced would be utilised for captive consumption by CEAT's Bhandup plant. Additionally, the plant is anticipated to generate about 21 million units of energy per year and will yearly offset about 17.43 million kg of carbon dioxide. Kumar Subbiah, Chief Financial Officer, CEAT, told the media that the partnership with Tata Power for setting up a solar power generation plant in Maharashtra implies their continued commitment towards a shift to sustainable energy. The company said that the installation of the 10 MW captive solar plant will not only lessen CEAT's dependency on non-renewable energy but will also be a notable milestone in the company's aim towards carbon neutrality. Image Source Also read: Azure Power, Tata Power win wind-solar hybrid auction in Maharashtra Also read: ACME, ReNew win 500 MW solar project in Maharashtra

Related Stories

Gold Stories

Next Story
Real Estate

L&T Wins Mega Order for India’s Largest NVIDIA B300 AI Factory

Larsen & Toubro (L&T), through Vyoma.AI’s AI infrastructure subsidiary LTN Compute, has secured a mega order to develop what the company describes as India’s largest single-cluster AI infrastructure facility. The NVIDIA B300 AI Factory will support US-based AI cloud company Together AI’s platform for large-scale inference, fine-tuning and training workloads.The integrated AI Factory will be hosted at Vyoma.AI’s Chennai data centre campus and will have a capacity of 10,000 NVIDIA B300 GPUs. The platform will combine hyperscale data centre infrastructure, accelerated computing, h..

Next Story
Infrastructure Urban

Autodesk Elevates Nikhil Bagalkotkar to Lead AEC in India, SAARC

Autodesk has elevated Nikhil Bagalkotkar as Head – Architecture, Engineering and Construction (AEC), India and SAARC, with immediate effect.In his new role, Bagalkotkar will lead Autodesk's AEC business strategy across the region and drive adoption of the company's Design and Make platform. He will also focus on promoting digital design and construction technologies to help customers accelerate innovation and deliver more sustainable and resilient infrastructure.Bagalkotkar will be responsible for expanding Autodesk's AEC business, strengthening customer and partner engagement, and accelerat..

Next Story
Real Estate

Listed Developers' Pre-Sales Seen Rising 22.3 Per Cent in FY27

India's leading listed residential developers are expected to sustain strong sales momentum in FY27, with combined pre-sales of 11 major players projected to rise 22.3 per cent year-on-year, according to an analysis by ANAROCK Research & Advisory.Combined pre-sales of the developers are estimated to increase from Rs 1.49 trillion in FY26 to Rs 1.82 lakh crore in FY27. ANAROCK attributed the growth to sustained end-user demand, new project launches and strong execution despite higher property prices, construction costs and global uncertainties.Dr Prashant Thakur, Executive Director and Head..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement