+
Tata to deploy 40-50 small modular nuclear reactors
POWER & RENEWABLE ENERGY

Tata to deploy 40-50 small modular nuclear reactors

India plans to deploy 40-50 small modular nuclear reactors, primarily to replace captive thermal power plants, as part of its strategy to achieve net-zero emissions by 2070. A senior industry official mentioned that the 220-MWe Pressurised Heavy Water Reactor (PHWR) is being redesigned using 3D design platforms to achieve a high level of standardisation, making it easier to deploy, even in older thermal power plants used by the steel, aluminium, copper, and cement industries. The Department of Atomic Energy, in collaboration with Tata Consulting Engineers, is working on redesigning the PHWRs to develop the Bharat Small Modular Reactor.

Amit Sharma, Managing Director and CEO of Tata Consulting Engineers, explained that they are taking the old PHWR design and reconfiguring it to be modular, scalable, and aligned with post-Fukushima safety standards. Sharma also mentioned that the plan for small modular reactors (SMRs) is to build 40-50 units within seven to eight years, but this requires a high degree of standardisation, safety, and modularity.

In her Union budget speech last month, Finance Minister Nirmala Sitharaman announced that the government would collaborate with the private sector to establish Bharat Small Reactors and contribute to the research and development of SMRs. She stated that the government would also work with the private sector to develop new technologies for nuclear energy.

Sharma noted that engineers would be redesigning the PHWR using 3D design platforms, which were unavailable 40 years ago when these reactors were originally designed. The Nuclear Power Corporation of India Limited has already set up 16 220-MWe PHWRs, two 540-MWe PHWRs, and two 700-MWe PHWRs. Additionally, fourteen more PHWRs, each with a capacity of 700 MWe, are at various stages of implementation and are expected to be commissioned progressively by 2031-32.

Tata Consulting Engineers has long been associated with the Department of Atomic Energy, holding an 85% market share in engineering services within the nuclear sector and implementing several power projects. Sharma highlighted that the mention of SMRs by the finance minister in her budget speech underscored a strong commitment to energy transition. He added that nuclear energy is viewed as the only viable long-term solution for achieving net-zero emissions, a stance increasingly recognised globally.

SMRs, unlike conventional nuclear reactors that are built on-site, can be factory-built. They have a power capacity of up to 300 MWe per unit and, due to their mobile and agile nature, can be installed in locations unsuitable for larger plants. SMRs are expected to play a significant role in the energy transition phase, contributing meaningfully to efforts to combat climate change.

India plans to deploy 40-50 small modular nuclear reactors, primarily to replace captive thermal power plants, as part of its strategy to achieve net-zero emissions by 2070. A senior industry official mentioned that the 220-MWe Pressurised Heavy Water Reactor (PHWR) is being redesigned using 3D design platforms to achieve a high level of standardisation, making it easier to deploy, even in older thermal power plants used by the steel, aluminium, copper, and cement industries. The Department of Atomic Energy, in collaboration with Tata Consulting Engineers, is working on redesigning the PHWRs to develop the Bharat Small Modular Reactor. Amit Sharma, Managing Director and CEO of Tata Consulting Engineers, explained that they are taking the old PHWR design and reconfiguring it to be modular, scalable, and aligned with post-Fukushima safety standards. Sharma also mentioned that the plan for small modular reactors (SMRs) is to build 40-50 units within seven to eight years, but this requires a high degree of standardisation, safety, and modularity. In her Union budget speech last month, Finance Minister Nirmala Sitharaman announced that the government would collaborate with the private sector to establish Bharat Small Reactors and contribute to the research and development of SMRs. She stated that the government would also work with the private sector to develop new technologies for nuclear energy. Sharma noted that engineers would be redesigning the PHWR using 3D design platforms, which were unavailable 40 years ago when these reactors were originally designed. The Nuclear Power Corporation of India Limited has already set up 16 220-MWe PHWRs, two 540-MWe PHWRs, and two 700-MWe PHWRs. Additionally, fourteen more PHWRs, each with a capacity of 700 MWe, are at various stages of implementation and are expected to be commissioned progressively by 2031-32. Tata Consulting Engineers has long been associated with the Department of Atomic Energy, holding an 85% market share in engineering services within the nuclear sector and implementing several power projects. Sharma highlighted that the mention of SMRs by the finance minister in her budget speech underscored a strong commitment to energy transition. He added that nuclear energy is viewed as the only viable long-term solution for achieving net-zero emissions, a stance increasingly recognised globally. SMRs, unlike conventional nuclear reactors that are built on-site, can be factory-built. They have a power capacity of up to 300 MWe per unit and, due to their mobile and agile nature, can be installed in locations unsuitable for larger plants. SMRs are expected to play a significant role in the energy transition phase, contributing meaningfully to efforts to combat climate change.

Next Story
Infrastructure Urban

GRM Overseas Reports Q1 FY26 Results; Strengthens Global & Domestic Presence

GRM Overseas has announced its unaudited financial results for the quarter ended 30 June 2025. The company reported a positive performance in terms of margins and profitability, despite topline pressures from global geopolitical challenges.Atul Garg, Managing Director, said:"We have maintained healthy margins and profitability while navigating short-term headwinds. Our focus remains on expanding our product portfolio, enhancing brand visibility, and deepening our distribution network. Internationally, we continue to hold a strong position in the Basmati rice export market, particularly in the ..

Next Story
Infrastructure Urban

Zuari Industries Posts Q1 FY26 Revenue Growth; PAT Turns Positive

Zuari Industries has announced its audited financial results for the quarter ended 30 June 2025.On a standalone basis, the company reported Revenue from Operations of Rs 2.10 billion and Operating EBITDA of Rs 220.4 million. Standalone Profit Before Tax (PBT), before exceptional items, stood at Rs 90 million.On a consolidated basis, Revenue rose 10.5 per cent year-on-year to Rs 2.67 billion, while Profit After Tax (PAT) stood at Rs 50 million compared to a loss of Rs 330.6 million in Q1 FY25.Segment HighlightsSugar, Power & Ethanol: Operations were impacted by an early mill closure due to ..

Next Story
Infrastructure Urban

Karnataka Bank Reports Q1 FY26 Net Profit of Rs 2.92 Bn

Karnataka Bank has announced a net profit of Rs 2.92 billion for the first quarter of FY26, compared to Rs 4 billion in Q1 FY25. The results were approved at the Board of Directors meeting held on 13 August 2025 at the Bank’s headquarters in Mangaluru.Asset Quality & Capital AdequacyGross NPA: 3.46 per cent, improved from 3.54 per cent in Q1 FY25.Net NPA: 1.44 per cent, down from 1.66 per cent in Q1 FY25.Capital Adequacy Ratio (CAR): 20.46 per cent, up from 17.64 per cent in Q1 FY25.Announcing the results, Raghavendra S Bhat, Managing Director & CEO, said:"The Bank has registered a m..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?