+
THDC seeks consultants for floating solar project
POWER & RENEWABLE ENERGY

THDC seeks consultants for floating solar project

In a strategic move towards sustainable energy initiatives, THDC India has opened the doors for consulting firms to bid on a transformative project ? the development of a 100 MW floating solar power project at the Kadra Dam reservoir in Karnataka.

Bidding Process and Timeline: Interested consultants have until September 15, 2024, to submit their bids, with the bid opening scheduled for the following day. The project holds significance as it seeks to harness solar power through innovative floating technology.

Project Scope and Execution: The study's comprehensive scope involves the preparation of a detailed project report (DPR) and a bathymetric survey. This encompasses an in-depth evaluation of suitability, engineering surveys, cost estimates, and assessments of technical, economic, and financial viability for solar power projects. The ultimate goal is to formulate a feasible plan for project execution, following the engineering, procurement, and construction (EPC) mode.

Site Examination and Conditions: The scope of work further includes a meticulous examination of site conditions, encompassing factors such as location, weather patterns, water levels, variations, high flood levels, water and land profiles, shadow-free areas, and site accessibility.

Bidding Requirements and Local Emphasis: To participate, bidders must provide an earnest money deposit of ?106,000 (~$1,277.5). Emphasizing local engagement, only bids from Class-I local suppliers, with a local content of 50% or higher, will be considered.

Consultant's Responsibilities and Payment Stages: The selected consultant holds the responsibility of gathering data from the THDC Kadra Dam site and government agencies if necessary. The payment stages for consultancy services are structured, involving disbursements at various project milestones, ensuring accountability and progress.

Recent Initiatives: This call for bids follows THDC India's recent move to invite consultants for a DPR for the development of a 1 GW Phase-I ultra mega solar power park within a larger 2 GW solar park in Jaisalmer, Rajasthan. Additionally, in December, the company sought proposals for a feasibility report to set up floating solar power projects on reservoirs in the Godavari Marathwada region of Maharashtra.

THDC India continues to pave the way for renewable energy advancements, showcasing a commitment to sustainable practices and innovation in the Indian energy landscape. The bidding process for the Kadra Dam project marks a significant step toward harnessing the potential of solar energy through cutting-edge technologies.

In a strategic move towards sustainable energy initiatives, THDC India has opened the doors for consulting firms to bid on a transformative project ? the development of a 100 MW floating solar power project at the Kadra Dam reservoir in Karnataka. Bidding Process and Timeline: Interested consultants have until September 15, 2024, to submit their bids, with the bid opening scheduled for the following day. The project holds significance as it seeks to harness solar power through innovative floating technology. Project Scope and Execution: The study's comprehensive scope involves the preparation of a detailed project report (DPR) and a bathymetric survey. This encompasses an in-depth evaluation of suitability, engineering surveys, cost estimates, and assessments of technical, economic, and financial viability for solar power projects. The ultimate goal is to formulate a feasible plan for project execution, following the engineering, procurement, and construction (EPC) mode. Site Examination and Conditions: The scope of work further includes a meticulous examination of site conditions, encompassing factors such as location, weather patterns, water levels, variations, high flood levels, water and land profiles, shadow-free areas, and site accessibility. Bidding Requirements and Local Emphasis: To participate, bidders must provide an earnest money deposit of ?106,000 (~$1,277.5). Emphasizing local engagement, only bids from Class-I local suppliers, with a local content of 50% or higher, will be considered. Consultant's Responsibilities and Payment Stages: The selected consultant holds the responsibility of gathering data from the THDC Kadra Dam site and government agencies if necessary. The payment stages for consultancy services are structured, involving disbursements at various project milestones, ensuring accountability and progress. Recent Initiatives: This call for bids follows THDC India's recent move to invite consultants for a DPR for the development of a 1 GW Phase-I ultra mega solar power park within a larger 2 GW solar park in Jaisalmer, Rajasthan. Additionally, in December, the company sought proposals for a feasibility report to set up floating solar power projects on reservoirs in the Godavari Marathwada region of Maharashtra. THDC India continues to pave the way for renewable energy advancements, showcasing a commitment to sustainable practices and innovation in the Indian energy landscape. The bidding process for the Kadra Dam project marks a significant step toward harnessing the potential of solar energy through cutting-edge technologies.

Next Story
Infrastructure Urban

India to Invest Rs 600 Billion to Upgrade 1,000 ITIs

As part of its drive to modernise vocational training, the Ministry of Skill Development and Entrepreneurship (MSDE), in collaboration with Gujarat’s Labour and Employment Department, held a State-Level Workshop at the NAMTECH Campus within IIT-Gandhinagar to discuss the National Scheme for ITI Upgradation.The consultation brought together key stakeholders from industry and the training ecosystem to align expectations and support implementation of the scheme, which aims to transform 1,000 Industrial Training Institutes (ITIs) across India using a hub-and-spoke model. The total outlay stands ..

Next Story
Infrastructure Urban

India Unveils Rs 600 Billion Maritime Finance Push

The Ministry of Ports, Shipping & Waterways (MoPSW) hosted the Maritime Financing Summit 2025 in New Delhi, bringing together over 250 stakeholders including policymakers, industry leaders, global investors, and financial institutions. The summit, held under the ambit of Maritime Amrit Kaal Vision (MAKV) 2047, focused on transforming India into a leading maritime power with strengthened financial, infrastructural, and technological capabilities.Union Minister Sarbananda Sonowal emphasised India's strategic progress, noting that average port turnaround times have dropped from four days to u..

Next Story
Infrastructure Urban

Govt Allocates Rs 500 Million To Boost Community Radio

The Central Government, through its ‘Supporting Community Radio Movement in India’ scheme, has allocated Rs 500 million to strengthen the community radio ecosystem across the country. The initiative aims to assist both newly established and long-operational Community Radio Stations (CRSs), ensuring their relevance to local educational, social, cultural, and developmental needs.According to the policy published by the Ministry of Information and Broadcasting, CRSs may be set up by not-for-profit organisations with at least three years of demonstrated community service. These stations are ex..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?