TNERC Proposes Stricter Rules for Captive Power Projects
POWER & RENEWABLE ENERGY

TNERC Proposes Stricter Rules for Captive Power Projects

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria.

Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights.

Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation.

To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges.

Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities.

The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria. Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights. Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation. To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges. Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities. The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

Next Story
Equipment

Schwing Stetter India Unveils New Innovations at Excon 2025

Schwing Stetter India unveiled more than 20 new machines at Excon 2025, marking one of its most significant showcases and introducing several India-first technologies to the construction equipment sector. The company launched the country’s first 56-metre boom pump designed and manufactured in India, the first fully electric truck mixer, the first CNG mixer variant and the first hybrid boom pump. Executives said the launch portfolio was engineered to support India’s move toward faster, greener and more vertically oriented infrastructure through advanced engineering, clean-energy solutions a..

Next Story
Infrastructure Energy

SEPC Resolves Hindustan Copper Dispute, Wins Rs 725 Mn Order

Engineering, procurement and construction firm SEPC Ltd has recently settled a dispute with Hindustan Copper Ltd (HCL) and secured a mining infrastructure order valued at Rs 725 million from the state-owned company. SEPC informed the stock exchanges that it has executed a settlement deed with HCL, bringing closure to all inter-se claims and counterclaims arising from arbitration proceedings. As part of the settlement, SEPC will receive Rs 304.5 million as full and final payment, marking the resolution of all pending disputes between the two entities. The company also stated that Hindustan Co..

Next Story
Infrastructure Energy

20% Ethanol Blending Cuts India’s CO2 Emissions by 73.6 Mn Tonnes

Union Road Transport and Highways Minister Nitin Gadkari recently said that India has reduced carbon dioxide emissions by 73.6 million metric tonnes due to the adoption of 20 per cent ethanol blending in petrol. He made the statement while replying to supplementary questions during the Question Hour in the Lok Sabha. Describing ethanol as a green fuel, the minister said it plays a key role in reducing pollution while also supporting higher incomes for farmers. He underlined that ethanol blending contributes both to environmental sustainability and rural economic growth. Nitin Gadkari also po..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App