TNERC Proposes Stricter Rules for Captive Power Projects
POWER & RENEWABLE ENERGY

TNERC Proposes Stricter Rules for Captive Power Projects

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria.

Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights.

Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation.

To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges.

Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities.

The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria. Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights. Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation. To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges. Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities. The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

Next Story
Building Material

Ambuja Cements Drags JSW Cement to Court Over ‘Kawach’ Brand

Ambuja Cements, part of the Adani Group, has filed a trademark infringement case against JSW Cement in the Delhi High Court, alleging that its rival copied the ‘Kawach’ brand with its new product ‘Jal Kavach’.Justice Manmeet Pritam Singh Arora issued summons to JSW Cement and its subsidiary, JSW IP Holdings Pvt Ltd, while referring the matter to mediation. Hearings are scheduled to resume on October 15 if no settlement is reached.Ambuja, which registered the ‘Kawach’ trademark in 2019, argues that the term ‘Kavach’—meaning shield—is the distinctive feature of its branding. ..

Next Story
Technology

Bentley Systems Named Innovation Partner of the Year 2025 by Afcons

Bentley Systems, the infrastructure engineering software company, has been recognised by Afcons Infrastructure Limited as its Innovation Partner of the Year 2025 at the Innovation Partners 2025 Felicitation Ceremony in Mumbai. The award acknowledges Bentley’s contribution to Afcons’ engineering digitalisation journey through an enterprise agreement providing access to over 250 Bentley engineering software tools. This adoption has enabled Afcons to accelerate project delivery, standardise digital workflows, and strengthen innovation across its infrastructure portfolio. Among key i..

Next Story
Infrastructure Urban

SBI Sells 13.18% Stake in Yes Bank to Japan’s SMBC

State Bank of India (SBI) has completed the sale of a 13.18 per cent stake in Yes Bank to Japan’s Sumitomo Mitsui Banking Corporation (SMBC) for over Rs 8,889 crore. The divestment is part of a Rs 13,482 crore deal finalised in May with SMBC and seven private banks.Following the transaction, SBI’s shareholding in Yes Bank stands at 10.8 per cent. The deal, involving 4,134.4 million shares at Rs 21.50 each, is the largest cross-border transaction in the Indian banking sector.SBI Chairman C S Setty described the 2020 RBI-led rescue of Yes Bank as a pioneering public-private partnership, addi..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?