TNERC Proposes Stricter Rules for Captive Power Projects
POWER & RENEWABLE ENERGY

TNERC Proposes Stricter Rules for Captive Power Projects

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria.

Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights.

Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation.

To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges.

Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities.

The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria. Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights. Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation. To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges. Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities. The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

Next Story
Infrastructure Transport

Tata, Airbus to Build India’s First Private Helicopter Line

In a landmark development for India’s aerospace sector, Tata Advanced Systems Limited (TASL) and Airbus will establish the country’s first private-sector helicopter assembly line in Vemagal, Karnataka. The facility will manufacture the Airbus H125 and H125M, marking a significant milestone in India’s push for self-reliance in aviation and defence manufacturing. The new Final Assembly Line (FAL) will produce the H125, the world’s best-selling single-engine helicopter, known for its versatility and performance in extreme environments. The first ‘Made in India’ H125 is expected to ro..

Next Story
Infrastructure Urban

NeGD to Support Bharat Taxi in Building Cooperative Ride Platform

In a significant move for India’s digital and mobility transformation, the National e-Governance Division (NeGD) of the Digital India Corporation, under the Ministry of Electronics and Information Technology (MeitY), has entered into an advisory partnership with Sahakar Taxi Cooperative Limited, the company behind Bharat Taxi — a first-of-its-kind, cooperative-led national ride-hailing platform. A Memorandum of Understanding (MoU) has been signed between NeGD and Sahakar Taxi to provide strategic advisory and technical support covering key areas such as platform integration, cybersecurity..

Next Story
Technology

MeitY Hosts Pre-Summit for India–AI Impact Summit 2026

The Ministry of Electronics and Information Technology (MeitY), Government of India, hosted a series of Pre-Summit events for the upcoming India–AI Impact Summit 2026 at the India Mobile Congress (IMC) 2025 in New Delhi. These sessions mark a key milestone ahead of the main summit, scheduled for 19–20 February 2026 at Bharat Mandapam, New Delhi. Delivering the inaugural address, S. Krishnan, Secretary, MeitY, highlighted India’s innovative and frugal approach to AI development. “We have adopted innovative means by learning from others’ experiences to build projects and products that..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?