TNERC Proposes Stricter Rules for Captive Power Projects
POWER & RENEWABLE ENERGY

TNERC Proposes Stricter Rules for Captive Power Projects

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria.

Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights.

Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation.

To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges.

Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities.

The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria. Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights. Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation. To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges. Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities. The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

Next Story
Infrastructure Urban

TBO Tek Q2 Profit Climbs 12%, Revenue Surges 26% YoY

TBO Tek Limited one of the world’s largest travel distribution platforms, reported a solid performance for Q2 FY26 with a 26 per cent year-on-year increase in revenue to Rs 5.68 billion, reflecting broad-based growth and improving profitability.The company recorded a Gross Transaction Value (GTV) of Rs 8,901 crore, up 12 per cent YoY, driven by strong performance across Europe, MEA, and APAC regions. Adjusted EBITDA before acquisition-related costs stood at Rs 1.04 billion, up 16 per cent YoY, translating into an 18.32 per cent margin compared to 16.56 per cent in Q1 FY26. Profit after tax r..

Next Story
Infrastructure Energy

Northern Graphite, Rain Carbon Secure R&D Grant for Greener Battery Materials

Northern Graphite Corporation and Rain Carbon Canada Inc, a subsidiary of Rain Carbon Inc, have jointly received up to C$860,000 (€530,000) in funding under the Canada–Germany Collaborative Industrial Research and Development Programme to develop sustainable battery anode materials.The two-year, C$2.2 million project aims to transform natural graphite processing by-products into high-performance, battery-grade anode material (BAM). Supported by the National Research Council of Canada Industrial Research Assistance Programme (NRC IRAP) and Germany’s Federal Ministry for Economic Affairs a..

Next Story
Infrastructure Urban

Antony Waste Q2 Revenue Jumps 16%; Subsidiary Wins Rs 3,200 Cr WtE Projects

Antony Waste Handling Cell Limited (AWHCL), a leading player in India’s municipal solid waste management sector, announced a 16 per cent year-on-year increase in total operating revenue to Rs 2.33 billion for Q2 FY26. The growth was driven by higher waste volumes, escalated contracts, and strong operational execution.EBITDA rose 18 per cent to Rs 570 million, with margins steady at 21.6 per cent, while profit after tax stood at Rs 173 million, up 13 per cent YoY. Revenue from Municipal Solid Waste Collection and Transportation (MSW C&T) reached Rs 1.605 billion, and MSW Processing re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement