+
TNERC Proposes Stricter Rules for Captive Power Projects
POWER & RENEWABLE ENERGY

TNERC Proposes Stricter Rules for Captive Power Projects

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria.

Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights.

Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation.

To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges.

Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities.

The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

Your next big infra connection is waiting at RAHSTA 2025 – Asia’s Biggest Roads & Highways Expo, Jio World Convention Centre, Mumbai. Don’t miss out!

The Tamil Nadu Electricity Regulatory Commission (TNERC) has unveiled draft regulations aimed at tightening scrutiny on captive generating projects (CGPs) to ensure adherence to stringent ownership and consumption criteria. Under the proposed framework, distribution licensees would be mandated to conduct annual verifications to confirm compliance with ownership stipulations outlined in the Electricity Rules, 2005. CGPs must maintain a minimum 26% ownership threshold throughout the financial year, while group captive projects necessitate captive users collectively holding at least 26% equity with voting rights. Moreover, the regulations dictate that captive users must consume a minimum of 51% of the total electricity generated annually, with group captive plants required to align consumption proportionally to their respective ownership shares within a 10% deviation. To bolster transparency, CGPs and users will be obligated to furnish detailed reports on equity shareholding, generation, and consumption data within four weeks of the financial year's conclusion. Additionally, captive users will be required to submit a bank guarantee as security deposit to cover cross subsidy and additional surcharges. Failure to meet these stringent criteria will result in forfeiture of captive status for the year, subjecting projects to cross-subsidy and additional surcharges applicable to non-captive entities. The TNERC has invited stakeholder feedback on the draft regulations until July 15, 2024, before finalizing and implementing the new rules. This follows recent regulatory efforts by TNERC to streamline solar PV integration and establish clearer guidelines for wind and solar generation, underscoring its commitment to enhancing regulatory clarity and operational standards in Tamil Nadu's energy sector.

Next Story
Real Estate

Mumbai Records 11,230 Property Deals in August 2025

Mumbai’s property market remained resilient in August 2025, with 11,230 property registrations recorded under the Brihanmumbai Municipal Corporation (BMC) jurisdiction, according to data released by Knight Frank India. While this marks a 3 per cent year-on-year (YoY) decline compared to 11,631 registrations in August 2024, activity stayed robust despite the marginal dip.On a month-on-month (MoM) basis, registrations fell 11 per cent from 12,579 deals in July 2025, indicating seasonal moderation. However, the city’s stamp duty collections still reached Rs 10 billion, reflecting a 6 per cent..

Next Story
Infrastructure Transport

68 Jammu-Katra Trains Cancelled Amid Rain Damage

Jammu and Katra railway services remain severely affected as Northern Railway announced the cancellation of 68 trains—both incoming and outgoing—until 30 September, due to extensive track damage caused by heavy rains and flash floods. Meanwhile, 24 trains are scheduled to resume operations gradually.The Jammu railway division has experienced a complete halt in services for the past eight days, following track misalignment and breaches at several points along the Pathankot–Jammu section. Torrential rainfall since 26 August led to widespread flooding and damage, stranding hundreds of passe..

Next Story
Infrastructure Transport

Bangalore Metro MD Reviews Reach 6 and Phase 2A Progress

Bangalore Metro Rail Corporation Limited (BMRCL) Managing Director, Dr J Ravishankar, IAS, conducted inspections of key metro corridors on 29 and 30 August, reviewing the progress of Reach 6 (Pink Line) and Phase 2A (Blue Line).On 30 August, the inspection covered Reach 6, a 21.39-km corridor stretching from Kalena Agrahara to Nagawara, with 18 stations. This stretch is part of Phase 2 of the Bangalore Metro project. Dr Ravishankar assessed the status of civil works, finishing, track laying, and system integration between Kalena Agrahara and MG Road.Earlier, on 29 August, the MD inspected Phas..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?