First greenfield industrial smart city opened
SMART CITIES

First greenfield industrial smart city opened

Prime Minister Narendra Modi inaugurated the 10,000-acre Aurangabad Industrial City (AURIC), the country's first greenfield industrial smart city, part of the upcoming Delhi-Mumbai industrial corridor.Contact: Satish Gavai, Chairman, Aurangabad Industrial Townsh...

Prime Minister Narendra Modi inaugurated the 10,000-acre Aurangabad Industrial City (AURIC), the country's first greenfield industrial smart city, part of the upcoming Delhi-Mumbai industrial corridor.Contact: Satish Gavai, Chairman, Aurangabad Industrial Township.Address: DMIC Cell, Maharashtra Industrial Development Corporation, Udyog Sarathi, Mahakali Caves Road, Andheri (East), Mumbai-400 093.Tel: 022-2687 0052.E-mail: info@auric.cityWebsite: www.auric.city 

Next Story
Real Estate

Navin’s Starwood Towers 3.0 wins PMAY award for affordable housing

Navin’s, a reputed South Indian real estate brand, has received the Pradhan Mantri Awas Yojana (PMAY) award for its flagship project Navin’s Starwood Towers 3.0, marking its third consecutive PMAY win. The award was presented by Tokhan Sahu, Minister of State, Ministry of Housing and Urban Affairs, in New Delhi and accepted by N. Kalyanaraman, COO, Navin’s. “We are incredibly proud that the well-established phase of our flagship project Navin’s Starwood Towers 3.0 has been chosen for the PMAY award... reiterating that we are on top of the game,” said Kalyanaraman. “We unders..

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train Viaduct and Piers Work Completed: NHSRCL

The Mumbai-Ahmedabad bullet train project, India's first high-speed rail corridor, has reached significant construction milestones with more than 300 km of viaduct completed and ongoing progress on trackbed works.The National High Speed Rail Corporation (NHSRCL), the implementing agency for the project, reported that 304 km of viaduct and 388 km of pier work have been finished. Additionally, the construction of 14 river bridges, 7 steel bridges, and 5 prestressed concrete bridges has been completed.Trackbed construction is advancing steadily, with 163 km completed so far. The Vapi bullet train..

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train Project Slab Casting Starts at Virar Station

The Mumbai-Ahmedabad Bullet Train Project has advanced with the commencement of casting the first slab at the Virar Bullet Train station. A total of nine slabs will be constructed at this level, which will serve as the foundation for track laying at the station.The Virar Bullet Train station is designed to have two levels—a concourse level and a rail level—extending to a total length of 425 meters.The first slab cast measures 50 meters in length and 35.32 meters in width, with an approximate thickness of 300 mm. This slab required 1,555 cubic meters of concrete.In recent developments, the ..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?