+
ALLU’s new raptor vibratory machine for excavators
Equipment

ALLU’s new raptor vibratory machine for excavators

ALLU has launched its new raptor vibratory machine for the North American market excavators. The attachment is designed for severe demolition jobs and for increased productivity and reliability. It delivers greater impact at a lower frequency. That enables the tool to last longer, increase productivity and reduce operator fatigue.

ALLU offers four raptor models for excavators ranging from 40,000 to 121,000 pounds.

Here’s a breakdown of the Raptor models’ specs:

  • AR18-25 – For excavators weighing 40,000 to 51,000 pounds. It weighs 5,512 pounds. It requires 42 gallons per minute of hydraulic fluid and 2,321 psi.
  • AR24-37: For excavators weighing 53,000 to 71,000 pounds. It weighs 8,157 pounds. It requires 50 gallons per minute of hydraulic fluid and 3,481 psi.
  • AR32-42: For excavators weighing 71,000 to 88,000 pounds. It weighs 9,259 pounds. It requires 55 gallons per minute of hydraulic fluid and 3,481 psi.
  • AR40-49: For excavators weighing 88,000 to 121,000 pounds. It weighs 10,803 pounds. It requires 71 gallons per minute of hydraulic fluid and 4,061 psi.
  • The Raptor comes with a two-year warranty.
  • ALLU has launched its new raptor vibratory machine for the North American market excavators. The attachment is designed for severe demolition jobs and for increased productivity and reliability. It delivers greater impact at a lower frequency. That enables the tool to last longer, increase productivity and reduce operator fatigue. ALLU offers four raptor models for excavators ranging from 40,000 to 121,000 pounds. Here’s a breakdown of the Raptor models’ specs: AR18-25 – For excavators weighing 40,000 to 51,000 pounds. It weighs 5,512 pounds. It requires 42 gallons per minute of hydraulic fluid and 2,321 psi. AR24-37: For excavators weighing 53,000 to 71,000 pounds. It weighs 8,157 pounds. It requires 50 gallons per minute of hydraulic fluid and 3,481 psi. AR32-42: For excavators weighing 71,000 to 88,000 pounds. It weighs 9,259 pounds. It requires 55 gallons per minute of hydraulic fluid and 3,481 psi. AR40-49: For excavators weighing 88,000 to 121,000 pounds. It weighs 10,803 pounds. It requires 71 gallons per minute of hydraulic fluid and 4,061 psi. The Raptor comes with a two-year warranty.

    Related Stories

    Gold Stories

    Next Story
    Infrastructure Transport

    97 Per Cent Of Rongjeng-Mangsang-Adokgre Road Nears Completion

    Deputy Chief Minister in-charge of public works Prestone Tynsong said in Shillong on 26 August that 97 per cent physical progress had been achieved on the ongoing Rongjeng-Mangsang-Adokgre road being constructed under the Non-Lapsable Central Pool of Resources (NLCPR). He noted the project was sanctioned in 2017 and that the stipulated time for completion had been 24 months from issue of the final work order. The deputy chief minister informed the assembly that the government had decided to include the remaining work under a World Bank project. In reply to a query from Rongjeng MLA Jim M Sangm..

    Next Story
    Infrastructure Transport

    First TBM Starts Digging Five Point Three Kilometre Tunnel Under SGNP

    The Goregaon-Mulund Link Road (GMLR) Phase three (B) project has reached a key milestone as the first tunnel boring machine (TBM) began excavation of the first of two tunnels beneath the Sanjay Gandhi National Park (SGNP). The machine, named Tulsi, started cutting a five point three kilometre bore that will link Dadasaheb Phalke Chitranagari in Goregaon East with Amar Nagar in Mulund West. Officials issued a statement noting the commencement of tunnelling work under the protected green belt. The twin tunnels are being constructed using mechanised tunnelling methods that aim to limit surface di..

    Next Story
    Infrastructure Transport

    UP Approves Two Expressways And Rs 240 bn Infrastructure Push

    The Uttar Pradesh Cabinet approved a series of infrastructure and industrial investment proposals totalling Rs 240 billion (Rs 240 bn), including two major expressway projects, a manufacturing and logistics cluster in Sultanpur and incentives for 11 industrial projects across the state. The decisions, taken at a meeting chaired by Chief Minister Yogi Adityanath, underline the state government’s focus on expanding road connectivity around emerging industrial hubs while attracting manufacturing investment to districts beyond major urban centres. The approvals cover both greenfield expressway c..

    Advertisement

    Subscribe to Our Newsletter

    Get daily newsletters around different themes from Construction world.

    STAY CONNECTED

    Advertisement

    SPECIAL OFFER
    QR Code