Innovative structural design
Real Estate

Innovative structural design

Galvanised by rapid urbanisation and infrastructure development and the invasion of innovative technologies and concepts, the Indian roofing and cladding sector has come a long way. Here’s how Kirby India has offered innovative and optimised structural design for one of its projects.

Project: Design, fabrication, erection and commissioning of Phase 3 Hall 4A-Centre of Excellence and Exhibition Centre; steel structural works (PEB) and accessories.
Client: Indian Machine Tool Manufacturers Association (IMTMA).
Location: Bengaluru.
Architect: Mistry Architect.
PMC: Potential Project Managers.
Steel solution provider: Kirby Building Systems and Structures India.
Tonnage: 2,200 mt.
Area: 22,444 sq m.
Building cost: Rs 233 million.

Key highlights

Built near three other buildings, which were designed, fabricated and erected by Kirby India, this unique structure is huge and wide, with a clear span of 75 m, length of 234 m and height of 11.2 m. 

Bangalore International Exhibition Center and Mistry Architect had put forward their plans and Kirby India offered innovative and optimised structural design with the use of tubular space truss elements for the exhibition hall, which is different from regular PEB designs. The structure is having three nodal open tubular triangular girders with section of 2.4 m wide x 3 m height. The main chords are 300-350 mm in diameter and the top and bottom chords are braced together with smaller bracing members. The roof and wall panels are meeting green building standards with SRI above 78 and the curved standing seam roofing system with a clear span of 75 m without any internal joints is provided for the first time for the PEB industry. 

Galvanised by rapid urbanisation and infrastructure development and the invasion of innovative technologies and concepts, the Indian roofing and cladding sector has come a long way. Here’s how Kirby India has offered innovative and optimised structural design for one of its projects.Project: Design, fabrication, erection and commissioning of Phase 3 Hall 4A-Centre of Excellence and Exhibition Centre; steel structural works (PEB) and accessories.Client: Indian Machine Tool Manufacturers Association (IMTMA).Location: Bengaluru.Architect: Mistry Architect.PMC: Potential Project Managers.Steel solution provider: Kirby Building Systems and Structures India.Tonnage: 2,200 mt.Area: 22,444 sq m.Building cost: Rs 233 million.Key highlightsBuilt near three other buildings, which were designed, fabricated and erected by Kirby India, this unique structure is huge and wide, with a clear span of 75 m, length of 234 m and height of 11.2 m. Bangalore International Exhibition Center and Mistry Architect had put forward their plans and Kirby India offered innovative and optimised structural design with the use of tubular space truss elements for the exhibition hall, which is different from regular PEB designs. The structure is having three nodal open tubular triangular girders with section of 2.4 m wide x 3 m height. The main chords are 300-350 mm in diameter and the top and bottom chords are braced together with smaller bracing members. The roof and wall panels are meeting green building standards with SRI above 78 and the curved standing seam roofing system with a clear span of 75 m without any internal joints is provided for the first time for the PEB industry. 

Next Story
Real Estate

CREDAI-MCHI to Host 10th Design & Construction Conference

CREDAI-MCHI will host the 10th anniversary edition of its Design & Construction Conference on August 19, 2026, at the Jio World Convention Centre in Mumbai.The event is expected to bring together more than 500 procurement leaders, construction heads, architects, consultants and senior real estate decision-makers, alongside over 50 construction and ancillary brands.The conference will feature product launches, technology showcases, knowledge sessions, strategic business-to-business networking and recognition of procurement professionals contributing to the transformation of the construction..

Next Story
Infrastructure Energy

BorgWarner Wins Extension for High-Voltage Inverter Programmes

BorgWarner has secured a major extension of several high-volume high-voltage inverter programmes from a leading European automotive manufacturer.The contracts cover updated inverter designs for plug-in hybrid and 800V battery-electric vehicle applications. Production is scheduled to begin in 2029.Isabelle McKenzie, President and General Manager, BorgWarner PowerDrive Systems, said the programme extensions demonstrate the company’s position in power electronics and reflect the strength of its technology, in-house expertise and customer relationships.For plug-in hybrid vehicles, BorgWarner wil..

Next Story
Infrastructure Urban

Castrol India Q2 Profit Rises 43% to Rs 3.48 bn

Castrol India reported a 43 per cent year-on-year increase in profit after tax to Rs 3.48 billion for the quarter ended June 30, 2026, supported by growth across its consumer, industrial and institutional businesses.Revenue from operations increased 25 per cent to Rs 18.71 billion during the second quarter of 2026, compared with Rs 14.97 billion in the corresponding period of 2025. EBITDA rose 41 per cent to Rs 4.94 billion from Rs 3.50 billion.Sequentially, revenue increased from Rs 15.45 billion in the first quarter of 2026, while EBITDA rose from Rs 3.29 billion. Profit after tax increased ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement