Atmosphere Realty Redeems Rs 2.17 Billion NCDs Ahead of Schedule
Real Estate

Atmosphere Realty Redeems Rs 2.17 Billion NCDs Ahead of Schedule

Atmosphere Realty (ARPL), a joint venture of The Wadhwa Group (50 per cent), Man Infra Construction Ltd (30 per cent), and Chandak Realtors (20 per cent), has fully redeemed Rs 2.17 billion secured Non-Convertible Debentures (NCDs) ahead of their scheduled 2030 maturity.

Issued on 9 December 2020, these 2,179 debentures (Rs 10 lakh each) were acquired by Marubeni Corporation, a Japanese conglomerate with a presence in over 65 countries.

The early redemption on 24 March 2025 was enabled by robust sales and internal accruals from Atmosphere O2, a premium gated community in Nahur, Mulund West, Mumbai.

This successful exit reinforces Marubeni’s confidence in partnering with reliable developers delivering high-quality, timely projects. Both Marubeni and ARPL plan to explore future collaborations following this transaction.

Atmosphere Realty (ARPL), a joint venture of The Wadhwa Group (50 per cent), Man Infra Construction Ltd (30 per cent), and Chandak Realtors (20 per cent), has fully redeemed Rs 2.17 billion secured Non-Convertible Debentures (NCDs) ahead of their scheduled 2030 maturity.Issued on 9 December 2020, these 2,179 debentures (Rs 10 lakh each) were acquired by Marubeni Corporation, a Japanese conglomerate with a presence in over 65 countries.The early redemption on 24 March 2025 was enabled by robust sales and internal accruals from Atmosphere O2, a premium gated community in Nahur, Mulund West, Mumbai.This successful exit reinforces Marubeni’s confidence in partnering with reliable developers delivering high-quality, timely projects. Both Marubeni and ARPL plan to explore future collaborations following this transaction.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?