The Delhi High Court is now hearing arguments from two developers on a housing project in the city, and the justices must decide who should hear the case first. The Delhi Police's Economic Offences Wing (EOW) filed a formal complaint (FIR) against Godrej Properties and its senior management in relation to Godrej Air, following the orders of a capital court. In its court filing, Orris Infrastructure, the plaintiff, stated that Godrej Properties was only required to pay Rs 0.37 billion for the 10 acres of land needed for the project by September 2022, although the latter was meant to pay Rs 2.02 billion. Sections 406 (criminal breach of trust), 420 (cheating), and 120B (criminal conspiracy) of the IPC are cited in the EOW case. After reviewing Orris's appeal, the chief metropolitan magistrate (south-west) of Dwarka, Rajat Goyal, issued an order on May 28 registering the FIR and requiring that a compliance report be given to the court. The next day, the case was filed. Godrej Properties subsequently initiated legal proceedings in the Delhi High Court to challenge the lower court's order. Following a hearing involving both parties, Judge Dinesh Kumar Sharma observed on June 7: "This court considers that this case falls within the category of rarest of rare cases, where the documents filed indicate the jurisdiction of the courts in Gurgaon. The learned Chief Metropolitan Magistrate (CMM) has passed an order for the registration of an FIR despite noting that the investigation agency reported that the alleged offence had been committed within the jurisdiction of Gurgaon and the complaint had been sent to Gurgaon." The court issued a stay on any coercive action in the case until the next hearing, scheduled for July 11. Counsel for Godrej Properties argued that the lower court had mechanically passed the order without possessing territorial jurisdiction. On the other hand, counsel for Orris argued that various meetings between both parties had occurred in Delhi, which fell within the territorial jurisdiction of the Dwarka court.

The Delhi High Court is now hearing arguments from two developers on a housing project in the city, and the justices must decide who should hear the case first. The Delhi Police's Economic Offences Wing (EOW) filed a formal complaint (FIR) against Godrej Properties and its senior management in relation to Godrej Air, following the orders of a capital court. In its court filing, Orris Infrastructure, the plaintiff, stated that Godrej Properties was only required to pay Rs 0.37 billion for the 10 acres of land needed for the project by September 2022, although the latter was meant to pay Rs 2.02 billion. Sections 406 (criminal breach of trust), 420 (cheating), and 120B (criminal conspiracy) of the IPC are cited in the EOW case. After reviewing Orris's appeal, the chief metropolitan magistrate (south-west) of Dwarka, Rajat Goyal, issued an order on May 28 registering the FIR and requiring that a compliance report be given to the court. The next day, the case was filed. Godrej Properties subsequently initiated legal proceedings in the Delhi High Court to challenge the lower court's order. Following a hearing involving both parties, Judge Dinesh Kumar Sharma observed on June 7: This court considers that this case falls within the category of rarest of rare cases, where the documents filed indicate the jurisdiction of the courts in Gurgaon. The learned Chief Metropolitan Magistrate (CMM) has passed an order for the registration of an FIR despite noting that the investigation agency reported that the alleged offence had been committed within the jurisdiction of Gurgaon and the complaint had been sent to Gurgaon. The court issued a stay on any coercive action in the case until the next hearing, scheduled for July 11. Counsel for Godrej Properties argued that the lower court had mechanically passed the order without possessing territorial jurisdiction. On the other hand, counsel for Orris argued that various meetings between both parties had occurred in Delhi, which fell within the territorial jurisdiction of the Dwarka court.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?