Pankaj Tare, General Manager-Projects, Airports & Station Modernisation, Tata Projects, elaborates on the innovations that helped Prayagraj Airport’s new terminal in Uttar Pradesh go green:

  • Exterior wall construction (U-value taken from DBR): AAC block with plaster. Overall U-value of exterior wall is 0.78 W per sq m°K° (0.137 Btu per hour-sq ft F).
  • On-site/off-site renewable energy system installation to offset a part of the annual energy consumption of internal artificial lighting and HVAC systems.
  • Monitoring CO2, temperature and RH in air-conditioned spaces.
  • Two-speed, Pony motor, VFD-controlled cooling tower fan control.
  • Fulfilling mandatory requirements of ECBC; all fans BEE-star rated.
  • Roof construction with insulation (U-value taken from DBR). Overall U-value of roof is 0.26 W per sq m°K (0.046 Btu per hr-sqft F)
  • Window to gross wall ratio: 36 per cent (without fritted glass)
  • 100 per cent of outdoor lighting (lamps + lamp housing) meets luminous efficacy requirements (at least 75 lumens per W).
  • Lighting for all exterior applications controlled by photo sensor or astronomical time switch.
  • Transformer efficiency calculation at 50 per cent and 100 per cent load with losses meet ECBC requirements.
  • Power cabling sized to ensure power distribution losses don’t exceed 1 per cent of total power usage.
  • Provision of photo sensor interlocked with artificial lighting within perimeter spaces capable for 50 per cent reduction in power output for day-lighted spaces greater than 250 sq ft.
  • Artificial lighting meets minimum uniformity ratio of 0.4.
  • Occupancy sensors for all public and non-public areas.
  • Provision of energy meter for utility grid and advanced energy meters: smart/advance energy metering for HVAC plant, UPS, lighting.
  • Suction piping for split system has minimum R-2 insulation; also, all insulation is CFC and HCFC-free.
  • To offset 0.5 per cent of annual energy consumption of internal artificial lighting and HVAC,solar panels of capacity 50 kva (45 kw considering 0.9 as DC to AC conversion) have been installed on the roof, with total annual production of about 63,289 kwh
  • Use of materials in building insulation, HVAC, refrigeration and firefighting with low ozone depleting potential.
  • Fire-suppression systems and fire extinguishers free of halon.
  • Indoor noise levels within acceptable limits (NBC 2005) and key noise sources (DG sets, chiller plants) have sufficient acoustic insulation.
  • Use of chiller plant fulfilling the ECBC code.
  • Fresh air inputs and treatment meeting the CPCB National Ambient Air Quality Standard for fresh air as well as ASHRAE standards. PM10, ozone and CO2.
  • Use of low-VOC paints and other compounds in interiors.
  • Electrical car charging points for at least 5 per cent of parking spaces.
  • E-waste recycling.
  • STP installed. 
  • Installation of digital water meters for municipal water, borewell, treated water from STP (at outlet), rainwater reuse.
  • Water fixture flow rates: Water closet- 4/2 LPF; urinals- 1.5 LPF; lavatory faucets- 4 LPF; kitchen sink - 6 LPF; showers- 6 LPF.
  • Recharge of surplus rainwater into aquifer (through appropriate filtration).
  • Water-saving landscape techniques including selection of native and drought-tolerant species along with drip irrigation system and time-based controller for landscaping.
SERAPHINA D’SOUZA

Pankaj Tare, General Manager-Projects, Airports & Station Modernisation, Tata Projects, elaborates on the innovations that helped Prayagraj Airport’s new terminal in Uttar Pradesh go green:Exterior wall construction (U-value taken from DBR): AAC block with plaster. Overall U-value of exterior wall is 0.78 W per sq m°K° (0.137 Btu per hour-sq ft F).On-site/off-site renewable energy system installation to offset a part of the annual energy consumption of internal artificial lighting and HVAC systems.Monitoring CO2, temperature and RH in air-conditioned spaces.Two-speed, Pony motor, VFD-controlled cooling tower fan control.Fulfilling mandatory requirements of ECBC; all fans BEE-star rated.Roof construction with insulation (U-value taken from DBR). Overall U-value of roof is 0.26 W per sq m°K (0.046 Btu per hr-sqft F)Window to gross wall ratio: 36 per cent (without fritted glass)100 per cent of outdoor lighting (lamps + lamp housing) meets luminous efficacy requirements (at least 75 lumens per W).Lighting for all exterior applications controlled by photo sensor or astronomical time switch.Transformer efficiency calculation at 50 per cent and 100 per cent load with losses meet ECBC requirements.Power cabling sized to ensure power distribution losses don’t exceed 1 per cent of total power usage.Provision of photo sensor interlocked with artificial lighting within perimeter spaces capable for 50 per cent reduction in power output for day-lighted spaces greater than 250 sq ft.Artificial lighting meets minimum uniformity ratio of 0.4.Occupancy sensors for all public and non-public areas.Provision of energy meter for utility grid and advanced energy meters: smart/advance energy metering for HVAC plant, UPS, lighting.Suction piping for split system has minimum R-2 insulation; also, all insulation is CFC and HCFC-free.To offset 0.5 per cent of annual energy consumption of internal artificial lighting and HVAC,solar panels of capacity 50 kva (45 kw considering 0.9 as DC to AC conversion) have been installed on the roof, with total annual production of about 63,289 kwhUse of materials in building insulation, HVAC, refrigeration and firefighting with low ozone depleting potential.Fire-suppression systems and fire extinguishers free of halon.Indoor noise levels within acceptable limits (NBC 2005) and key noise sources (DG sets, chiller plants) have sufficient acoustic insulation.Use of chiller plant fulfilling the ECBC code.Fresh air inputs and treatment meeting the CPCB National Ambient Air Quality Standard for fresh air as well as ASHRAE standards. PM10, ozone and CO2.Use of low-VOC paints and other compounds in interiors.Electrical car charging points for at least 5 per cent of parking spaces.E-waste recycling.STP installed. Installation of digital water meters for municipal water, borewell, treated water from STP (at outlet), rainwater reuse.Water fixture flow rates: Water closet- 4/2 LPF; urinals- 1.5 LPF; lavatory faucets- 4 LPF; kitchen sink - 6 LPF; showers- 6 LPF.Recharge of surplus rainwater into aquifer (through appropriate filtration).Water-saving landscape techniques including selection of native and drought-tolerant species along with drip irrigation system and time-based controller for landscaping.SERAPHINA D’SOUZA

Related Stories

Gold Stories

Hi There!

Now get regular updates from CW Magazine on WhatsApp!

Click on link below, message us with a simple hi, and SAVE our number

You will have subscribed to our Construction News on Whatsapp! Enjoy

+91 81086 03000

Join us Telegram