Housing complexes for slum dwellers inaugurated in Bhubaneswar
Real Estate

Housing complexes for slum dwellers inaugurated in Bhubaneswar

Odisha Chief Minister Naveen Patnaik inaugurated three housing complexes for people belonging to the economically weaker section (EWS) of the society, mostly the slum dwellers in Bhubaneswar.

The three housing complexes inaugurated by Patnaik were: Keshari Residency built in Satya Nagar, Buddha Vihar in Chandrasekharpur and Barunei Enclave in Subudhipur.

The housing complexes were constructed under an urban housing scheme (Saharanchal Awas Yojana). While the Keshari Residency was built for the residents of the Shantipalli area, the Barunei Enclave is meant for the slum dwellers of Tarini Basti. At least, 840 pucca houses have been distributed so far, an official release said.

As per the plan, around 7,000 pucca houses will be distributed among the slum dwellers, of which about 1,700 houses have already been constructed.

Of the 560 houses completed so far in Keshari Residency, Patnaik handed over the keys of 314 beneficiary families.

Similarly, more than 300 houses in Barunei Enclave were handed over to beneficiary families by the chief minister.

Odisha Chief Minister Naveen Patnaik inaugurated three housing complexes for people belonging to the economically weaker section (EWS) of the society, mostly the slum dwellers in Bhubaneswar. The three housing complexes inaugurated by Patnaik were: Keshari Residency built in Satya Nagar, Buddha Vihar in Chandrasekharpur and Barunei Enclave in Subudhipur. The housing complexes were constructed under an urban housing scheme (Saharanchal Awas Yojana). While the Keshari Residency was built for the residents of the Shantipalli area, the Barunei Enclave is meant for the slum dwellers of Tarini Basti. At least, 840 pucca houses have been distributed so far, an official release said. As per the plan, around 7,000 pucca houses will be distributed among the slum dwellers, of which about 1,700 houses have already been constructed. Of the 560 houses completed so far in Keshari Residency, Patnaik handed over the keys of 314 beneficiary families. Similarly, more than 300 houses in Barunei Enclave were handed over to beneficiary families by the chief minister.

Next Story
Infrastructure Urban

India Expands Semiconductor Training To 500 Institutions

Under the Chips to Startups programme of the India Semiconductor Mission, the Union minister responsible for Railways, Information and Broadcasting, and Electronics and IT reported notable progress in talent development. He indicated that over the past four years substantial steps have been taken towards a 10-year target of training 85,000 engineers in semiconductor design. World-class EDA tools have been deployed in 315 academic institutions across the country to provide students with practical exposure to chip design. These EDA tools are supported by leading global firms and are accessible t..

Next Story
Infrastructure Urban

Delhi Institutions Support India Semiconductor Mission

The Government of India has prioritised talent development through training, upskilling and workforce development under the Chips to Startups initiative of the India Semiconductor Mission, with officials noting progress in four years towards a 10-year target of training 85,000 engineers in semiconductor design. Electronic design automation tools provided by Synopsys, Cadence, Siemens, Renesas, Ansys and AMD have been deployed in 315 academic institutions, enabling students to gain practical chip design experience. Chips have been fabricated and tested at the Semiconductor Laboratory, Mohali, a..

Next Story
Infrastructure Urban

NHA Announces Winners Of NHCX Hackathon At IIT Hyderabad

The National Health Authority (NHA) has concluded the NHCX Hackathon under the Ayushman Bharat Digital Mission (ABDM) to stimulate innovation around the National Health Claims Exchange (NHCX). The winning teams presented their solutions at the NHCX Innovation Meet held at IIT Hyderabad during a two-day event in March 2026 that also served as the hackathon grand finale. The hackathon itself ran from 22 to 28 February 2026 and aimed to accelerate paperless, transparent claims processing across India. The event was organised with a range of ecosystem partners, including the Insurance Regulatory a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement