YEIDA Unveils 20 Plots in New Housing Scheme Across Three Sectors in Noida
Real Estate

YEIDA Unveils 20 Plots in New Housing Scheme Across Three Sectors in Noida

To encourage residential development, the Yamuna Expressway Industrial Development Authority (YEIDA) introduced a new group housing scheme featuring 20 plots across Sectors 17, 18, and 22D.

The scheme includes six plots in Sector 17, five in Sector 18, and nine in Sector 22D, with plot sizes ranging from 11,513.72 square metres to 89,034 square metres. In Sector 17, the plots vary between 11,513.72 square metres and 24,282 square metres, with a base price of Rs 32,375 per square metres.

In Sector 18, all plots are uniformly sized at 16,188 square metres, while Sector 22D offers the most variety, with sizes starting from 20,235 square metres and extending to the scheme's largest plot, spanning 89,034 square metres.

Developers interested in participating are required to pay a registration fee or earnest money deposit (EMD) ranging from Rs 30.73 million to Rs 300.27 million. The application process, which began on Thursday, will remain open until December 18. An e-auction for plot allocation is planned for January 20, with incremental bid values set at 1 per cent of the base price.

To encourage residential development, the Yamuna Expressway Industrial Development Authority (YEIDA) introduced a new group housing scheme featuring 20 plots across Sectors 17, 18, and 22D. The scheme includes six plots in Sector 17, five in Sector 18, and nine in Sector 22D, with plot sizes ranging from 11,513.72 square metres to 89,034 square metres. In Sector 17, the plots vary between 11,513.72 square metres and 24,282 square metres, with a base price of Rs 32,375 per square metres. In Sector 18, all plots are uniformly sized at 16,188 square metres, while Sector 22D offers the most variety, with sizes starting from 20,235 square metres and extending to the scheme's largest plot, spanning 89,034 square metres. Developers interested in participating are required to pay a registration fee or earnest money deposit (EMD) ranging from Rs 30.73 million to Rs 300.27 million. The application process, which began on Thursday, will remain open until December 18. An e-auction for plot allocation is planned for January 20, with incremental bid values set at 1 per cent of the base price.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

EMO Energy and e-Sprinto to Deploy 8,000 Electric Scooters

EMO Energy has announced a partnership with electric two-wheeler maker e-Sprinto to deploy 8,000 electric scooters across India this financial year. The rollout will include both low-speed and high-speed models and will be phased across several cities. The scooters will be aimed at quick-commerce and last-mile delivery operations where uptime and energy efficiency are prioritised. EMO Energy said the scooters will use its patented ZenPac liquid-cooled battery platform with active thermal management, battery intelligence and energy optimisation to improve reliability and performance. ZenPac con..

Next Story
Infrastructure Energy

Octillion Opens Third EV Battery Plant in India

Octillion Power Systems has opened its third manufacturing facility in Halol, Gujarat, adding production capacity as demand for electric vehicle battery systems grows across passenger, commercial and public transport segments. The facility covers more than 13,000 square metres and was converted from an empty structure into an operational battery manufacturing plant in less than eight months. At full capacity the Gujarat plant will manufacture more than 48,000 battery systems annually, representing over three GWh of energy storage capacity. With the addition of the Halol facility Octillion's co..

Next Story
Real Estate

Land Reforms Could Unlock Urban Affordable Housing

Former cabinet secretary and NITI Aayog member Rajeev Gauba said India’s urban housing shortage could be tackled by unlocking 10 million (mn) vacant homes and using excess unutilised land held by public sector undertakings (PSUs). He said land availability lay at the heart of the problem and estimated that land accounted for as much as 50 to 70 per cent of total project cost. He urged states to waive land?use change fees and exempt stamp duty on land and transactions linked to affordable housing. He noted that urban population was projected to rise from 500 million to nearly 900 million by 2..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement