Ahmedabad's town planning panel greenlights Makarba TP scheme changes
Real Estate

Ahmedabad's town planning panel greenlights Makarba TP scheme changes

The town planning committee of the civic body has approved modifications to the Makarba Town Planning (TP) scheme 204, which pertains to plots designated as the R3 (Residential-3) zone in the western part of Ahmedabad. Sources indicate that a major change has been authorized, allowing development permission for plots measuring 300 square meters in the R3 zone.

Previously, the minimum area required for development in the R3 zone was established at 1,000 square meters after the implementation of the Comprehensive General Development Control Regulations (CGDCR) in 2017; however, construction was permitted on plots of 500 square meters. Now, development permission will also be granted for plots of 300 square meters.

In the TP committee meeting held in August, all proposed changes by the Town Planning Officer (TPO) for the Makarba TP scheme 204 were accepted. A 40% deduction was agreed upon for original plots, which included prime location farmhouses owned by more than 50 VVIP landowners. Modifications to reserve land for residential and commercial purposes were approved, resulting in 11.7% of the plots being set aside, totalling an area of 13.10 lakh square meters. The Ahmedabad Municipal Corporation (AMC) will receive 204 plots for residential and commercial sales, marking the first time that such a large area has been reserved for sale in a single TP scheme. Sources from the corporation mention that the draft for the TP scheme was developed for 1,12,13,582 square meters of land across Makarba, Sarkhej, Okaf, Vejalpur, and Ambli villages. This encompasses land for residential-1, residential-3, commercial, affordable housing, and agricultural zones. Although a 40% deduction standard was established for TP scheme 204, the average deduction standard was determined to be 35.09%. In instances where original plots received a lower deduction, a full 40% deduction will apply.

The town planning committee of the civic body has approved modifications to the Makarba Town Planning (TP) scheme 204, which pertains to plots designated as the R3 (Residential-3) zone in the western part of Ahmedabad. Sources indicate that a major change has been authorized, allowing development permission for plots measuring 300 square meters in the R3 zone. Previously, the minimum area required for development in the R3 zone was established at 1,000 square meters after the implementation of the Comprehensive General Development Control Regulations (CGDCR) in 2017; however, construction was permitted on plots of 500 square meters. Now, development permission will also be granted for plots of 300 square meters. In the TP committee meeting held in August, all proposed changes by the Town Planning Officer (TPO) for the Makarba TP scheme 204 were accepted. A 40% deduction was agreed upon for original plots, which included prime location farmhouses owned by more than 50 VVIP landowners. Modifications to reserve land for residential and commercial purposes were approved, resulting in 11.7% of the plots being set aside, totalling an area of 13.10 lakh square meters. The Ahmedabad Municipal Corporation (AMC) will receive 204 plots for residential and commercial sales, marking the first time that such a large area has been reserved for sale in a single TP scheme. Sources from the corporation mention that the draft for the TP scheme was developed for 1,12,13,582 square meters of land across Makarba, Sarkhej, Okaf, Vejalpur, and Ambli villages. This encompasses land for residential-1, residential-3, commercial, affordable housing, and agricultural zones. Although a 40% deduction standard was established for TP scheme 204, the average deduction standard was determined to be 35.09%. In instances where original plots received a lower deduction, a full 40% deduction will apply.

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?