Kerala invites EoI for consultant to construct an earthen dam in Wayanad
ECONOMY & POLICY

Kerala invites EoI for consultant to construct an earthen dam in Wayanad

Kerala Government has invited an expression of interest (EoI) in a bid to select a consultant to prepare the DPR in order to construct an earthen dam under Kadamanthodu project in Wayanad.

This move is a result of the government’s efforts to tap the share of water allocated to it in the Kabini basin as per the Cauvery verdict.

Kicking off the bidding process is a big first step in ensuring that the project which has been dormant for the last decade can now begin.

As reported, the job of the consultant will entail surveys, conducting ground-level investigation, preparing structural designs and will also include mapping out detailed cost estimates for the DPR for the construction of a multipurpose composite dam across the Kadamanthodu river in the Kabini basin in Wayanad. 

Once completed, the project is likely to reduce draught at Pulpally, Mullankolly and Poothadi panchayats of Wayanad. Additionally, it will also aid in restoring groundwater levels in the following areas. 

Presently, Kerala has undertaken two projects, the Banasura Sagar dam and the Karappuzha irrigation project. Both these together utilise around 3.64 TMC of water in the Kabini basin. 

Kerala Government has invited an expression of interest (EoI) in a bid to select a consultant to prepare the DPR in order to construct an earthen dam under Kadamanthodu project in Wayanad.This move is a result of the government’s efforts to tap the share of water allocated to it in the Kabini basin as per the Cauvery verdict.Kicking off the bidding process is a big first step in ensuring that the project which has been dormant for the last decade can now begin.As reported, the job of the consultant will entail surveys, conducting ground-level investigation, preparing structural designs and will also include mapping out detailed cost estimates for the DPR for the construction of a multipurpose composite dam across the Kadamanthodu river in the Kabini basin in Wayanad. Once completed, the project is likely to reduce draught at Pulpally, Mullankolly and Poothadi panchayats of Wayanad. Additionally, it will also aid in restoring groundwater levels in the following areas. Presently, Kerala has undertaken two projects, the Banasura Sagar dam and the Karappuzha irrigation project. Both these together utilise around 3.64 TMC of water in the Kabini basin. 

Next Story
Infrastructure Transport

Tunnelling Begins for Thane, Borivali twin tunnel project

Tunnelling work has commenced for the 11.84-km Thane–Borivali Twin Tunnel, set to be India’s longest urban road tunnel, marking a key milestone in Mumbai’s infrastructure development.As per a post shared by Mumbai Metropolitan Region Development Authority on social media platform X, the tunnel boring machine (TBM) ‘Nayak’—the country’s largest single-shield hard rock TBM for an urban tunnel—was launched by Devendra Fadnavis on Tuesday. The event was attended by Eknath Shinde and Sunetra Pawar, among other dignitaries. A second TBM, ‘Arjuna’, is expected to be launched so..

Next Story
Infrastructure Transport

Large Format Store Planned At M G Road Metro Station

M G Road station in Bengaluru is set to host the city’s first large-format commercial and experience space, with planning led by Bangalore Metro Rail Corporation Limited. BMRCL has invited proposals to develop and operate a central business district destination at the Purple?Pink Line interchange. The plan positions the station as a commercial hub designed to serve a broad commuter base across the city. The proposal is part of a broader effort to activate transit nodes commercially. Tender documents set a minimum monthly rental of Rs 0.944 million (mn), inclusive of GST, for the large-format..

Next Story
Infrastructure Energy

Government Cancels Auction Of Eleven Critical Mineral Blocks

The government has cancelled the auction of 11 critical and strategic mineral blocks after receiving a poor investor response and failing to attract a sufficient number of qualified bidders. The decision represents a setback to plans to ramp up domestic exploration and production of critical minerals amid global supply chain disruptions and rising demand for materials used in clean energy and advanced technologies. The mines ministry issued an annulment notice setting out the reasons for the cancellations. The annulment notice indicated that the auction process for five mineral blocks was canc..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement