Kerala invites EoI for consultant to construct an earthen dam in Wayanad
ECONOMY & POLICY

Kerala invites EoI for consultant to construct an earthen dam in Wayanad

Kerala Government has invited an expression of interest (EoI) in a bid to select a consultant to prepare the DPR in order to construct an earthen dam under Kadamanthodu project in Wayanad.

This move is a result of the government’s efforts to tap the share of water allocated to it in the Kabini basin as per the Cauvery verdict.

Kicking off the bidding process is a big first step in ensuring that the project which has been dormant for the last decade can now begin.

As reported, the job of the consultant will entail surveys, conducting ground-level investigation, preparing structural designs and will also include mapping out detailed cost estimates for the DPR for the construction of a multipurpose composite dam across the Kadamanthodu river in the Kabini basin in Wayanad. 

Once completed, the project is likely to reduce draught at Pulpally, Mullankolly and Poothadi panchayats of Wayanad. Additionally, it will also aid in restoring groundwater levels in the following areas. 

Presently, Kerala has undertaken two projects, the Banasura Sagar dam and the Karappuzha irrigation project. Both these together utilise around 3.64 TMC of water in the Kabini basin. 

Kerala Government has invited an expression of interest (EoI) in a bid to select a consultant to prepare the DPR in order to construct an earthen dam under Kadamanthodu project in Wayanad.This move is a result of the government’s efforts to tap the share of water allocated to it in the Kabini basin as per the Cauvery verdict.Kicking off the bidding process is a big first step in ensuring that the project which has been dormant for the last decade can now begin.As reported, the job of the consultant will entail surveys, conducting ground-level investigation, preparing structural designs and will also include mapping out detailed cost estimates for the DPR for the construction of a multipurpose composite dam across the Kadamanthodu river in the Kabini basin in Wayanad. Once completed, the project is likely to reduce draught at Pulpally, Mullankolly and Poothadi panchayats of Wayanad. Additionally, it will also aid in restoring groundwater levels in the following areas. Presently, Kerala has undertaken two projects, the Banasura Sagar dam and the Karappuzha irrigation project. Both these together utilise around 3.64 TMC of water in the Kabini basin. 

Next Story
Infrastructure Urban

Vice-President Backs Global Unity at IN-STEP 2025

Vice-President of India, Shri C. P. Radhakrishnan, addressed delegates at the 3rd edition of the International Strategic Engagement Programme (IN-STEP) held at the Vice-President’s Enclave in New Delhi. IN-STEP serves as a key dialogue platform for senior national security officers from India and friendly foreign nations. The current edition hosts 44 delegates, including 32 international participants representing 24 Global South countries. Commending the joint efforts of the National Defence College, National Security Council Secretariat, Ministry of External Affairs, and Ministry of Defen..

Next Story
Infrastructure Urban

India to Host Global Maritime Events in Visakhapatnam

India will host three major international maritime events in February 2026 at Visakhapatnam — the International Fleet Review (IFR) 2026, Exercise MILAN 2026, and the Indian Ocean Naval Symposium (IONS) Conclave of Chiefs. Scheduled from 15 to 25 February 2026, this marks the first time India will conduct all three significant maritime gatherings simultaneously. The events embody Prime Minister Shri Narendra Modi’s MAHASAGAR vision — Mutual and Holistic Advancement for Security and Growth Across Regions — announced in 2025. The MAHASAGAR framework extends India’s SAGAR (Security and ..

Next Story
Infrastructure Urban

Heavy Industries Ministry Frees 4.4 Million Sq Ft Under SCDPM 5.0

Inspired by the Prime Minister’s vision to institutionalise Swachhata and clear long-pending matters, the Ministry of Heavy Industries (MHI), along with its Central Public Sector Enterprises (CPSEs) and Autonomous Bodies (ABs), actively participated in the fifth consecutive year of the Special Campaign for Disposal of Pending Matters (SCDPM) 5.0, held from 2 to 31 October 2025. Throughout the campaign, MHI worked closely with the Department of Administrative Reforms and Public Grievances, reporting daily progress on a dedicated monitoring portal. Shri Bhupathi Raju Srinivasa Varma, Minister..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement