Kolkata Metro's non-fare revenue for April surges
RAILWAYS & METRO RAIL

Kolkata Metro's non-fare revenue for April surges

According to a statement released by Kolkata Metro, there has been a 38 per cent increase in its non-fare revenue in April this year. Kolkata Metro mentioned that it has positioned itself as a leading entity among all railway zones in the country due to this increase.

The statement conveyed, Metro Railway, Kolkata mentioned that it had earned Rs 20.72 million in April 2024 as non-fare revenue, noting that the figure was Rs 10.97 million in the corresponding period the previous year.

A spokesperson for Kolkata Metro stated that the organization has been concentrating on generating revenues through various avenues such as branding litter bins at stations, displaying advertisements both inside and outside trains, erecting hoardings in open spaces, and setting up health check-up kiosks at different stations.

Furthermore, the spokesperson mentioned that Kolkata Metro has been branding various points including track sidewalls, card balance checking terminals, and smart card recharge machines. All these efforts have contributed to the increase in non-fare revenue, he added.

Currently, Kolkata Metro operates four lines which include the North-South line, two segments of the East-West line, a portion of the Joka-Esplanade line, and another segment of the New Garia-Bimanbandar line.

According to a statement released by Kolkata Metro, there has been a 38 per cent increase in its non-fare revenue in April this year. Kolkata Metro mentioned that it has positioned itself as a leading entity among all railway zones in the country due to this increase. The statement conveyed, Metro Railway, Kolkata mentioned that it had earned Rs 20.72 million in April 2024 as non-fare revenue, noting that the figure was Rs 10.97 million in the corresponding period the previous year. A spokesperson for Kolkata Metro stated that the organization has been concentrating on generating revenues through various avenues such as branding litter bins at stations, displaying advertisements both inside and outside trains, erecting hoardings in open spaces, and setting up health check-up kiosks at different stations. Furthermore, the spokesperson mentioned that Kolkata Metro has been branding various points including track sidewalls, card balance checking terminals, and smart card recharge machines. All these efforts have contributed to the increase in non-fare revenue, he added. Currently, Kolkata Metro operates four lines which include the North-South line, two segments of the East-West line, a portion of the Joka-Esplanade line, and another segment of the New Garia-Bimanbandar line.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?