Kolkata Metro's April non-fare revenue surges by 38%
RAILWAYS & METRO RAIL

Kolkata Metro's April non-fare revenue surges by 38%

According to a statement released by Kolkata Metro, there has been a 38 per cent increase in its non-fare revenue in April this year. Kolkata Metro mentioned that it has positioned itself as a leading entity among all railway zones in the country due to this increase.

The statement conveyed, "Metro Railway, Kolkata mentioned that it had earned Rs 20.72 million in April 2024 as non-fare revenue," noting that the figure was Rs 10.97 million in the corresponding period the previous year.

A spokesperson for Kolkata Metro stated that the organization has been concentrating on generating revenues through various avenues such as branding litter bins at stations, displaying advertisements both inside and outside trains, erecting hoardings in open spaces, and setting up health check-up kiosks at different stations.

Furthermore, the spokesperson mentioned that Kolkata Metro has been branding various points including track sidewalls, card balance checking terminals, and smart card recharge machines. All these efforts have contributed to the increase in non-fare revenue, he added.

Currently, Kolkata Metro operates four lines which include the North-South line, two segments of the East-West line, a portion of the Joka-Esplanade line, and another segment of the New Garia-Bimanbandar line.

According to a statement released by Kolkata Metro, there has been a 38 per cent increase in its non-fare revenue in April this year. Kolkata Metro mentioned that it has positioned itself as a leading entity among all railway zones in the country due to this increase. The statement conveyed, Metro Railway, Kolkata mentioned that it had earned Rs 20.72 million in April 2024 as non-fare revenue, noting that the figure was Rs 10.97 million in the corresponding period the previous year. A spokesperson for Kolkata Metro stated that the organization has been concentrating on generating revenues through various avenues such as branding litter bins at stations, displaying advertisements both inside and outside trains, erecting hoardings in open spaces, and setting up health check-up kiosks at different stations. Furthermore, the spokesperson mentioned that Kolkata Metro has been branding various points including track sidewalls, card balance checking terminals, and smart card recharge machines. All these efforts have contributed to the increase in non-fare revenue, he added. Currently, Kolkata Metro operates four lines which include the North-South line, two segments of the East-West line, a portion of the Joka-Esplanade line, and another segment of the New Garia-Bimanbandar line.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement