Ola Electric receives ICAT's first PLI Automotive Certificate
ECONOMY & POLICY

Ola Electric receives ICAT's first PLI Automotive Certificate

Ola Electric Technologies Pvt. Ltd. has been honoured with the inaugural PLI Automotive Certificate by the International Centre for Automotive Technology (ICAT), Manesar. This recognition comes under the Production Linked Incentive (PLI) Scheme of MHI for Automobiles and Auto Components.

Hanif Qureshi, Additional Secretary MHI, presented the certificate to S.J. Dhinagar, Head of Engineering & Sr. VP at Ola Electric, in the presence of Shri Saurabh Dalela, Director of ICAT, and senior officials from MHI, ICAT, and Ola Electric.

Ola Electric's Battery Electric Vehicle - 2W, specifically the Ola S1 Pro (Gen2), has successfully met the criteria of DVA of 50% (minimum) for the Automotive PLI certificate. This achievement underscores their dedication to advancing the indigenisation of sophisticated automotive technology products.

Receiving this certificate from ICAT underscores Ola Electric's commitment to the 'Make in Bharat' Abhiyan and reinforces its efforts to bolster the domestic production ecosystem, as highlighted in a media release.

Ola Electric Technologies Pvt. Ltd. has been honoured with the inaugural PLI Automotive Certificate by the International Centre for Automotive Technology (ICAT), Manesar. This recognition comes under the Production Linked Incentive (PLI) Scheme of MHI for Automobiles and Auto Components. Hanif Qureshi, Additional Secretary MHI, presented the certificate to S.J. Dhinagar, Head of Engineering & Sr. VP at Ola Electric, in the presence of Shri Saurabh Dalela, Director of ICAT, and senior officials from MHI, ICAT, and Ola Electric. Ola Electric's Battery Electric Vehicle - 2W, specifically the Ola S1 Pro (Gen2), has successfully met the criteria of DVA of 50% (minimum) for the Automotive PLI certificate. This achievement underscores their dedication to advancing the indigenisation of sophisticated automotive technology products. Receiving this certificate from ICAT underscores Ola Electric's commitment to the 'Make in Bharat' Abhiyan and reinforces its efforts to bolster the domestic production ecosystem, as highlighted in a media release.

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?