Prime Minister Inaugurates Numaligarh-Siliguri Pipeline Upgrade
ECONOMY & POLICY

Prime Minister Inaugurates Numaligarh-Siliguri Pipeline Upgrade

The Hon'ble Prime Minister of India, Shri Narendra Modi, inaugurated the Capacity Augmentation Project of the Numaligarh-Siliguri Product Pipeline (NSPL) of Oil India Limited (OIL) during a public meeting in Guwahati on March 13, 2026. The pipeline is a 654 km long, 406 mm diameter cross-country multi-product pipeline originally designed and operated for one point seven two million (mn) metric tonnes per annum (MMTPA) and has been upgraded to five point five MMTPA to support the expansion of Numaligarh Refinery from three point zero MMTPA to nine point zero MMTPA under the Government of India's Hydrocarbon Vision 2030 for the North-East.

The capacity enhancement was achieved through upgrading of existing infrastructure, including conversion of pigging stations at Sekoni, Guwahati, Bongaigaon and Madarihat into Intermediate Pumping Stations, augmentation of pumping facilities at Numaligarh Dispatch Terminal and upgrading of facilities at Siliguri Receipt Terminal for enhanced operational efficiency and safety. Implemented as a brownfield project, the augmentation was completed within approximately Rs seven point five billion (bn) against an approved cost of Rs eight point six billion (bn), achieving substantial savings while optimising the utilisation of existing assets.

During execution the project generated significant employment with around 4.1 mn man hours over a period exceeding three years across Assam and West Bengal. The project represents a major milestone in strengthening petroleum product transportation infrastructure in the North-East region and is expected to enhance India's energy security and logistical resilience for refined products.

Oil India Limited stated through its Public Relations Department in Noida that the capacity upgrade will support the strategic objective of improving supply chains for the North-East and facilitating the refinery expansion plan. The company added that the upgrades will improve operational flexibility and safety while leveraging existing assets to deliver value to stakeholders.

The Hon'ble Prime Minister of India, Shri Narendra Modi, inaugurated the Capacity Augmentation Project of the Numaligarh-Siliguri Product Pipeline (NSPL) of Oil India Limited (OIL) during a public meeting in Guwahati on March 13, 2026. The pipeline is a 654 km long, 406 mm diameter cross-country multi-product pipeline originally designed and operated for one point seven two million (mn) metric tonnes per annum (MMTPA) and has been upgraded to five point five MMTPA to support the expansion of Numaligarh Refinery from three point zero MMTPA to nine point zero MMTPA under the Government of India's Hydrocarbon Vision 2030 for the North-East. The capacity enhancement was achieved through upgrading of existing infrastructure, including conversion of pigging stations at Sekoni, Guwahati, Bongaigaon and Madarihat into Intermediate Pumping Stations, augmentation of pumping facilities at Numaligarh Dispatch Terminal and upgrading of facilities at Siliguri Receipt Terminal for enhanced operational efficiency and safety. Implemented as a brownfield project, the augmentation was completed within approximately Rs seven point five billion (bn) against an approved cost of Rs eight point six billion (bn), achieving substantial savings while optimising the utilisation of existing assets. During execution the project generated significant employment with around 4.1 mn man hours over a period exceeding three years across Assam and West Bengal. The project represents a major milestone in strengthening petroleum product transportation infrastructure in the North-East region and is expected to enhance India's energy security and logistical resilience for refined products. Oil India Limited stated through its Public Relations Department in Noida that the capacity upgrade will support the strategic objective of improving supply chains for the North-East and facilitating the refinery expansion plan. The company added that the upgrades will improve operational flexibility and safety while leveraging existing assets to deliver value to stakeholders.

Next Story
Infrastructure Transport

Sector 51-52 Metro skywalk in Noida remains shut despite being ready for over a year

Thousands of commuters travelling between Delhi Metro Rail Corporation’s (DMRC) Sector 52 station and Noida Metro Rail Corporation’s (NMRC) Sector 51 station continue to face daily inconvenience as the 300-metre air-conditioned skywalk connecting the two stations remains closed, despite being completed over a year ago, according to a report.The Noida Metro Rail Corporation built the foot overbridge to enable a seamless interchange between the Delhi Metro and Noida Metro networks. However, pending finishing work and a structural obstruction have delayed its opening.Krishna Karunesh, Chief E..

Next Story
Infrastructure Transport

Maharashtra clears Metro Line 5A, expansion of Mumbai Metro Line 5

The Maharashtra government has approved the expansion of Mumbai Metro Line 5 along with a new integrated corridor, Metro Line 5A, forming a combined 34.2-km metro network across the Thane-Bhiwandi-Kalyan-Ulhasnagar belt. The integrated project has been cleared at an estimated cost of ₹18,130.55 crore, according to a government resolution (GR).Metro Line 5 was originally approved in October 2017 as a 24.9-km fully elevated corridor with 17 stations connecting Thane, Bhiwandi and Kalyan, with an initial project cost of ₹8,416.51 crore. The corridor is being developed in two phases.The first ..

Next Story
Infrastructure Transport

Bengaluru Metro expansion seen driving office demand

Bengaluru’s expanding metro network is expected to emerge as a major catalyst for real estate growth, with the Yellow and Pink Lines likely to boost both office demand and residential prices across key micro-markets, according to a report by Colliers India.The report estimates that over the next two years, Bengaluru could witness an additional 5–7 million sq ft of Grade A office space demand across the Central Business District (CBD), Secondary Business District (SBD) and Electronic City. Improved metro connectivity and reduced commute times are expected to drive higher occupier interest a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement