Telangana Allocates Rs. 11.08 bn for Musi Temple Complex
ECONOMY & POLICY

Telangana Allocates Rs. 11.08 bn for Musi Temple Complex

The Telangana government has sanctioned Rs. 11.08 bn for developing and expanding a temple complex at Manchirevula village near the Musi river, under the Musi Riverfront Development project. The allocation is 57 per cent higher than the initial estimate of Rs. 7 bn announced by Chief Minister A. Revanth Reddy in March, when the foundation stone was laid for the reconstruction and development of two temples.

The sanction was issued through an order on Wednesday following a proposal from the managing director of the Musi Riverfront Development Corporation (MRDCL). The temple precinct will include the main temple, sub-shrines dedicated to Veerabhadra and Bhadrakali, the Sri Lalitha Maha Tripurasundari Devi Temple, the Sri Bala Ganapathy Swamy Temple and the Sri Bala Subramanya Swamy Temple.

The plans also provide for a Maha Mandapam, Nandi Mandapam, Prakarams, Raja Gopurams, a Yagasala, a Pushkarini, an iconic statue of Lord Shiva and other associated religious facilities. The allocation includes Rs. 5.99 bn for temple architectural works and Rs. 3.5 bn for civil and structural works, including mechanical, electrical and plumbing services and related facilities.

The remaining Rs. 1.6 bn has been earmarked for a 100-foot-wide, six-lane master plan road extending 2.5 km. The road will connect two nearby gated communities, adjoining Greyhounds land and the Young India Police School with the temple complex.

The road package covers pavement, drainage, retaining and protection works, culverts, lighting, road-safety measures and associated infrastructure, in line with applicable Indian Road Congress and Ministry of Road Transport and Highways provisions. A separate order has constituted a six-member committee to provide technical guidance and approve designs, drawings, Detailed Project Reports and estimates.

The committee is co-chaired by the Engineer-in-Chief of the Roads and Buildings Department and the Engineer-in-Chief of the Public Health Department. Its responsibilities include finalising rates for specialised temple architecture, stone carving and sculptural works, besides examining tendering, execution and any deviations or changes in scope. The Chief Engineer of MRDCL, the Chief Engineer of the Endowments Department, temple architecture expert E. Shivanagi Reddy and an additional secretary of the Finance Department are members.

The Telangana government has sanctioned Rs. 11.08 bn for developing and expanding a temple complex at Manchirevula village near the Musi river, under the Musi Riverfront Development project. The allocation is 57 per cent higher than the initial estimate of Rs. 7 bn announced by Chief Minister A. Revanth Reddy in March, when the foundation stone was laid for the reconstruction and development of two temples. The sanction was issued through an order on Wednesday following a proposal from the managing director of the Musi Riverfront Development Corporation (MRDCL). The temple precinct will include the main temple, sub-shrines dedicated to Veerabhadra and Bhadrakali, the Sri Lalitha Maha Tripurasundari Devi Temple, the Sri Bala Ganapathy Swamy Temple and the Sri Bala Subramanya Swamy Temple. The plans also provide for a Maha Mandapam, Nandi Mandapam, Prakarams, Raja Gopurams, a Yagasala, a Pushkarini, an iconic statue of Lord Shiva and other associated religious facilities. The allocation includes Rs. 5.99 bn for temple architectural works and Rs. 3.5 bn for civil and structural works, including mechanical, electrical and plumbing services and related facilities. The remaining Rs. 1.6 bn has been earmarked for a 100-foot-wide, six-lane master plan road extending 2.5 km. The road will connect two nearby gated communities, adjoining Greyhounds land and the Young India Police School with the temple complex. The road package covers pavement, drainage, retaining and protection works, culverts, lighting, road-safety measures and associated infrastructure, in line with applicable Indian Road Congress and Ministry of Road Transport and Highways provisions. A separate order has constituted a six-member committee to provide technical guidance and approve designs, drawings, Detailed Project Reports and estimates. The committee is co-chaired by the Engineer-in-Chief of the Roads and Buildings Department and the Engineer-in-Chief of the Public Health Department. Its responsibilities include finalising rates for specialised temple architecture, stone carving and sculptural works, besides examining tendering, execution and any deviations or changes in scope. The Chief Engineer of MRDCL, the Chief Engineer of the Endowments Department, temple architecture expert E. Shivanagi Reddy and an additional secretary of the Finance Department are members.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Alstom Automates Bengaluru Metro's 7.5 km Pink Line Section

Alstom has announced the commencement of passenger services on the 7.5 km elevated priority section of Bengaluru Metro's Pink Line Reach 6, equipped with its communications-based train control (CBTC) signalling technology. The section connects key residential, educational and healthcare hubs across South Bengaluru, strengthening the city's urban transport network.The priority section operates under Grade of Automation 2 (GoA2), enabling automatic train operation (ATO) from the first day of revenue service, a first for an Indian metro project. Under this system, train acceleration and braking a..

Next Story
Infrastructure Transport

Alstom Begins Production of 96 Driverless Chennai Metro Cars

Alstom has commenced manufacturing 96 Metropolis driverless metro cars for Chennai Metro Phase II at its Sri City facility in Andhra Pradesh. The production forms part of a €135 million contract awarded by Chennai Metro Rail Limited (CMRL) in 2025, covering the design and manufacture of 32 three-car trainsets and 15 years of comprehensive maintenance following the warranty period.Chennai Metro Phase II spans approximately 119 km across three corridors and associated inter-corridor sections, comprising more than 76 km of elevated tracks and 43 km of underground routes.Under the Make in India ..

Next Story
Products

Hafele launches Alustro flexible shelving system

Häfele India has introduced the Alustro Flexible Shelving System, a modular storage solution designed to maximise space and offer flexibility in residential interiors. The system can be configured for applications such as room dividers, walk-in wardrobes, kitchen units, wall-mounted shelves and vanity mirrors.Alustro allows users to combine aluminium, wooden and glass shelves within a single structure. It supports shelf heights of up to 3,000 mm and section widths of up to 1,164 mm. Additional options include coat stand profiles with protective gaskets for wardrobes and front- or rear-facing ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code