Asia MotorWorks launches 3118 Truck
Steel

Asia MotorWorks launches 3118 Truck

Asia MotorWorks Ltd (AMW) recently introduced its new 3118 haulage truck for heavy-duty, long distance applications in the Indian transport sector. The 3118 is ideally suited for transporting steel, oil, cement and is also intended for port applications and general market load. The 3118 fulfils the critical requirement of a high performance, robust vehicle suitable for on-road applications.

AMW’s 3118 haulage truck is fitted with a Cummins 180 brake horse power (BHP) diesel engine and a flat torque curve on a larger band of revolution per minute (rpm) for excellent fuel efficiency. The gear shift comes with closely packed gear ratios leads to longer life of transmission and reduced maintenance costs, besides the advantage of grade ability.

The bogie suspension renders increased suspension life, superior drive comfort for enhanced driver productivity and increased tyre life. The suspended cab design makes it easy to access the entire drive line. The vehicle comes with crash proof cabins contributing to safe and efficient driving.

Contact: Asia MotorWorks Ltd. Tel: 022- 6710 1501. Fax: 022-6710 1504. E-mail: sales@amwasia.com Website: www.amwasia.com

Asia MotorWorks Ltd (AMW) recently introduced its new 3118 haulage truck for heavy-duty, long distance applications in the Indian transport sector. The 3118 is ideally suited for transporting steel, oil, cement and is also intended for port applications and general market load. The 3118 fulfils the critical requirement of a high performance, robust vehicle suitable for on-road applications. AMW’s 3118 haulage truck is fitted with a Cummins 180 brake horse power (BHP) diesel engine and a flat torque curve on a larger band of revolution per minute (rpm) for excellent fuel efficiency. The gear shift comes with closely packed gear ratios leads to longer life of transmission and reduced maintenance costs, besides the advantage of grade ability. The bogie suspension renders increased suspension life, superior drive comfort for enhanced driver productivity and increased tyre life. The suspended cab design makes it easy to access the entire drive line. The vehicle comes with crash proof cabins contributing to safe and efficient driving. Contact: Asia MotorWorks Ltd. Tel: 022- 6710 1501. Fax: 022-6710 1504. E-mail: sales@amwasia.com Website: www.amwasia.com

Next Story
Infrastructure Transport

Bandra Kurla Bullet Train Station Nears Completion

The Bandra Kurla Complex (BKC) station, the only underground stop on the 508 km Mumbai–Ahmedabad High-Speed Rail Corridor, has reached its final stage, with 84 per cent of excavation work completed, the National High-Speed Rail Corporation Limited (NHSRCL) said on Saturday.There are 12 stations along the corridor, with BKC set to serve passengers in Mumbai. Excavation has reached a depth of 32.5 metres, equivalent to a 10-storey building. Once digging is complete, construction of the station’s world-class infrastructure will begin.The platform will be 26 metres below ground and the station..

Next Story
Infrastructure Transport

Bandra Kurla Bullet Train Station Nears Completion

The National High-Speed Rail Corporation Limited (NHSRCL) has reported that excavation for Bandra Kurla Complex (BKC) station on the 508 km Mumbai–Ahmedabad High-Speed Rail Corridor has reached 84 per cent completion. Work has been carried out to a depth of 32.5 metres, equivalent to a 10-storey building.BKC is the only underground station on the corridor and will serve Mumbai passengers. The station will feature six platforms, each approximately 415 metres long, and three floors comprising the platform, concourse, and service levels. The platform is planned at a depth of 26 metres from the ..

Next Story
Infrastructure Urban

RailTel Gains After Rs 18m Dredging Contract

RailTel Corporation of India saw its share price rise in early trade on 22 September following an order win from Dredging Corporation of India worth Rs 180.6 million.At 09:19 am, RailTel was quoting at Rs 395.35, up Rs 1.50 or 0.38 per cent on the BSE.The contract from Dredging Corporation involves providing offshore internet for DCI vessels and the ICCC, with execution scheduled by 18 January 2026.Last week, RailTel secured a Rs 574.8 million contract from Bihar State Educational Infrastructure Development Corporation for developing hybrid smart classrooms and ICT labs at colleges and univers..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?